1. COMPLETE ALL LECTRA DRAWING BEFORE SPIRNG BREAK
1.1. 360 working drawings
1.1.1. Back
1.1.2. Side
1.1.3. Front
1.2. Amended Fashion Illustration
2. TOILE 3 /GARMENT 4 08/03 - 15/03 WEEK 24 - 25
2.1. Complete Toile 3/A PVC Raincoat
2.1.1. TOILE 3/A COMPLETE - GET SIGNED OFF BEFORE 14/03
2.1.1.1. MATERIALS READY 4m PVC Fabric/Binding/Studs
2.1.1.1.1. Cut outer
2.1.1.1.2. USE TOILE 1 Sample Patch Pocket
2.1.1.1.3. Binding
2.2. TOILE 3/B PLASTIC RAINCOAT WITH SHIFT DRESS
2.2.1. TOILE 1/3B - Underlay Shift dress toile
2.2.1.1. Silk Painting work on FABRIC
2.2.1.1.1. Complete by 14/03
2.2.1.2. Digital Print Fabric Ordered
2.2.2. Decide on Digital Print or Hand Painting
2.3. Sample Creating Bias Binding
2.3.1. ORDER DIGITAL PRINT FABRIC BY 08/03
2.3.1.1. COMPLETE DATE / /
3. TOILE 4 /GARMENT 1 15/03 - 22/03 WEEK 25-26
3.1. TOILE 4 A- PVC CAPE & SKORT COMPLETE & S - GET SIGNED OFF BEFORE 21/03
3.1.1. MATERIALS READY 4m PVC Fabric/Binding/Studs
3.1.1.1. Cut outer
3.1.1.1.1. Bind all panels
3.1.1.1.2. Prepare patch pockets
3.1.1.1.3. Prepare popper stand and studs
3.1.1.2. Sample Patch Pocket
3.1.1.3. Sample Stud Fastening
3.1.1.4. Cut Lining
3.1.1.4.1. Attach lining and facings
3.1.1.5. Facings
3.1.1.5.1. Final decision on facing fabric
3.1.2. SIGNED OFF /
3.2. TOILE 1B - Simple Shift Top toile 15/03 - 16/03
3.2.1. Decide on final Fabric
3.2.1.1. Pattern shortend form Toile 1A
3.2.1.1.1. Finish Garment by 08/03
3.3. TOP FABRIC SOURCED
3.4. SKORT FABRIC SOURCED
3.4.1. Source Zips
3.4.2. Practice waist band
3.4.3. Cut Fabric
4. TOILE 5 / GARMENT 3 22/03 - 16/03 WEEK 26-28
4.1. Toile 2 needs re-worked
4.1.1. TOILE AMMENDED
4.1.1.1. Sample Pocket for pocket
4.1.1.2. Use Toile 4 pattern for PVC skirt and waistband
4.1.1.2.1. TOILE 5/A COMPLETE - GET SIGNED OFF BEFORE 25/03
4.2. TOILE 1B - Simple Shift Top toile 15/03 - 16/03
4.2.1. Decide on final Fabric
4.2.1.1. Pattern shortend form Toile 1A
4.2.1.1.1. Finish Garment by 16/04
5. SPRING BREAK 30/03 - 15/04
5.1. DIGITAL WORK
5.1.1. Illstraitions
5.1.2. Animations
5.1.3. Social Media
5.1.3.1. Complete by 16/04
5.1.3.1.1. COMPLETE DATE / /
5.1.4. Etsy Shop
5.1.5. Working drawings
5.2. DESIGN ROOM FILES
5.2.1. Fashion Illustration
5.2.2. 360 Working Drawings
5.2.3. Fabric Specification Sheets
5.2.4. Pattern Manipulation Sheets
5.2.4.1. Complete by 16/04
5.2.4.1.1. COMPLETE DATE / /
5.2.5. 5th Scale
5.2.6. Lay Plans
5.2.7. Costing Sheet
5.2.8. Critical Evaluations
5.3. UPDATE BLOG POSTS
5.3.1. GARMENT 1
5.3.2. GARMENT 2
5.3.3. GARMENT 3
5.3.3.1. Complete by 16/04
5.3.3.1.1. COMPLETE DATE / /
5.3.4. GARMENT 4
5.3.5. GARMENT 5
5.4. FINALISING BUSINESS PLAN
6. SOLO BUSINESS HAND-IN 23/04/18 WEEK 29
6.1. PRESENTATION HAND-IN
6.1.1. PREZI PRESENTATION
6.1.2. BUSINESS PLAN
6.1.3. FACT FILE
7. WEEK 27
7.1. START BUSINESS 2,000 WORD REPORT
8. GARMENT OVERSPILL TIME 16/04 - 26/04 WEEK 28
8.1. COMPULSARY DEADLINE ALL GARMENTS COMPLETE COMPULSARY DEADLINE
9. MARKETING AND PHOTOSHOOT 30/04 - 07/04 WEEK 30-1
9.1. Professional Photoshoot
9.1.1. Editing time
9.1.1.1. When can I get edited photos back
9.1.1.1.1. NEED BY 04/04
9.2. Branding
9.2.1. Labels
9.2.2. Typography
9.2.3. Logo
9.2.4. Website
9.3. Styling
9.3.1. Sourcing styling products
9.3.1.1. Photoshoot
9.3.1.2. Fashionshow
9.4. BROCHURE
9.4.1. PREPARE LOOKBOOK / BROOHCURE
9.4.1.1. COMPLETE BY 14/05
9.4.1.1.1. COMPLETE DATE / /
9.5. BLOG UPDATES
9.6. BUSINESS ANIMATION VIDEO
10. PDP1 SURVEY
10.1. Festival wear Focus
10.2. PVC fabric equiry
10.2.1. Results Blogged 30/01
10.3. Rainwear promotion
11. TOILE 1/GARMET 5 21/02 - 29/02 WEEK 22-23
11.1. TOILE 1 - WOOL SWING COAT COMPLETE - GET SIGNED OFF
11.1.1. BODY - Grey Felted Wool
11.1.1.1. Prepare panel where welt buttons sit
11.1.1.2. Cut Outer and Facings
11.1.1.3. Prepare Pockets - Welt Pocket Sample 5
11.1.2. LINING
11.1.2.1. Fabric Arrives
11.1.2.1.1. Cut Fabric
11.1.3. SLEEVES - Baby blue felted wool
11.1.3.1. Fabric Arrives
11.1.3.1.1. Cut panels
11.1.4. Finish Garment by 29/03
11.1.4.1. COMPLETE DATE / /
11.1.4.1.1. Complete Blog Post
11.1.4.1.2. Amend Layout Plan
11.1.4.1.3. Amend Design Room Files
12. FINAL PLANINNG PDP1 SUBMISSION !!!! START HERE !!!!
12.1. PVC PLASTIC - FESTIVAL WEAR SURVEY
12.1.1. Blog results
12.1.2. Collate information
12.1.3. Tailor product accordingly
12.2. MIND MAP
12.2.1. SMART targets version
12.2.2. EUTOPIA S/S 18 specific map
12.3. PROPOSAL
12.3.1. 750 Words
12.3.1.1. Client Brief
12.3.1.2. Collection Outline
12.3.1.2.1. COMPLETE DATE 22/02
12.3.1.3. Target Market
12.3.1.4. Cositngs
12.3.1.5. Marketing
12.4. TIMETABLE BREAKDOWN
12.4.1. Week by week schedule
13. BUSINESS UNIT Hand in Solo Business Plan 05/03/18
13.1. Source Business Plan Template
13.1.1. Complete sections
13.2. Target Market
13.2.1. Marketing Report
13.2.1.1. Acorn demographics
13.2.1.2. Customer Perceptions
13.3. Branding
13.3.1. Logo / Label
13.3.2. Colour Palette
13.4. SWOT analsis
13.5. Brand Ethos
13.5.1. Sustainablity
13.5.1.1. Recycled PVC fabric
13.5.1.1.1. FEEDBACK 12/03
13.6. Costings
13.6.1. Operational Expenditure
13.6.2. Presmises
13.7. Competitors
13.8. Legal
13.8.1. Insurance
13.8.2. Company registration
13.9. Marketing & Branding
13.9.1. Logo/font/client board/mood board
14. TOILE 1/GARMENT 2 29/03 - 08/03 WEEK 23-24
14.1. TOILE 1 - LINED PLASTIC SWING COAT COMPLETE - GET SIGNED OFF
14.1.1. MATERIALS READY 4m PVC Fabric/Binding/Studs
14.1.1.1. Cut outer
14.1.1.1.1. Bind all panels
14.1.1.1.2. Prepare patch pockets
14.1.1.1.3. Prepare popper stand and studs
14.1.1.2. Sample Patch Pocket
14.1.1.3. Sample Stud Fastening
14.1.1.4. Cut Lining
14.1.1.4.1. Attach lining and facings
14.1.1.5. Facings
14.1.1.5.1. Final decision on facing fabric
14.2. TOILE 1 - 1B Underlay Shift dress toile 22/02 - 15/03
14.2.1. Decide on final Fabric
14.2.1.1. Neoprene - Undarted
14.2.1.1.1. Sample welt seams
14.2.1.1.2. Similar pattern to Unconventional Project
14.2.1.1.3. Unlined with Facinng
14.2.1.2. Cotton - Darted
14.2.1.2.1. Decide of finish
15. MARCH 1ST
15.1. Professional Brochure Printed
15.1.1. COMPLETE DATE / /
15.1.1.1. Complete Blog Post
15.1.1.1.1. Finish Blogs by 01/03
15.1.1.2. Amend Layout Plan
15.1.1.2.1. COMPLETE DATE / /
15.1.1.3. Amend Design Room Files
16. EXTERNAL EXAMINER THURSDAY 7TH OF JUNE WEEK 35
17. FINAL SUBMISSION FOR COLLECTION AND THESIS THURSDAY 21ST OF MAY WEEK 33
18. STUDIO PRACTICE/FINALISING MARKING/ARTWORK 14/04 - 20/04 WEEK 32
18.1. DIGITAL WORK
18.1.1. ALL DIGITAL FILES SUBMITTED
18.1.1.1. COMPLETE BY 01/06
18.1.1.1.1. COMPLETE DATE / /