1. 4. System testing / Control
1.1. 4.1 Product Testing
1.1.1. 4.1.1 Software and Targeting Testing
1.1.2. 4.1.2 Reliability and Repeatability Testing
1.1.3. 4.1.3 Manufacturability Testing
1.2. 4,2 Conformance testing
1.2.1. 4.2.1 ATF Compliance Certification
1.2.2. 4.2.2 CTA Compliance Certification
1.2.3. 4.2.3 RCMP Compliance Certification
1.3. 4.3 Safety Assurance Testing
1.4. 4.4 Documentation
1.4.1. 4,4,1 Product Features and Safety Instructions
1.4.2. 4.4.2 Service Manuals
1.4.3. 4.4.3 Warranty Documentation
1.4.4. 4.4.4 Parts Diagram and Description
1.4.5. 4.4.5 Process Cost Analysis
2. 3. Manufacturing of the Prototype
2.1. 3.1 Development of the integrated software
2.2. 3.2 LIDAR Software integration with targeting software
2.3. 3.3 Manufacturing
2.3.1. 3.3.1 Barrel Machining
2.3.2. 3.3.2 PLC Installation
2.3.3. 3.3.3 PLC Programming
2.3.4. 3.3.4 Wad Injection Mold
2.3.5. 3.3.5 Cannon Systems Assembly
2.4. 3.4 Pneumatic and software incorporation with the cannon
2.4.1. 3.4.1 Assemble Pneumatics
2.4.2. 3.4.2 Integrate Software into Hardware
3. 5. Closing and marketable product presentation
3.1. 5.1 Sales Agreement
3.2. 5.2 Supply Chain Development
3.3. 5.3 Expenditure and Assets Evaluation
3.4. 5.4 Packaging
3.5. 5.5 Product Delivery
3.6. 5.6 Product Commissioning
3.7. 5.7 Customer Signoff
3.8. 5.8 Lessons Learned Documentation
3.9. 5.9 Customer Support
4. 1. Fusion ATC Project Initialization
4.1. 1.1 Risk Assessment
4.2. 1.2 Definition of the project scope
4.3. 1.3 Definition of the project charter
5. 2. Fusion ATC Project Planning
5.1. 2.1 Development of the control system strategies
5.2. 2.2 Planning of the hydraulics and pneumatic systems
5.3. 2.3 Cost estimations
5.3.1. 2.3.1 Cost of materials
5.3.2. 2.3.2 Time and Labour Costs
5.3.3. 2.3.3 Software Costs
5.3.4. 2.3.4 Production Costs