AMARI Watergate by Mind Map: AMARI Watergate

1. OZO Watergate

1.1. Cost Plan

1.2. Projection Project timeline and Cash Flow

1.3. Appoint PRE construction Design Consult

1.4. Amendment for Submission Drawing

1.5. Existing Structure Test

1.6. Infrastructure Basic Develop relate to Current AWB Infrastructure design

2. Construction Start

2.1. Demolition work

2.2. Infrastructure work

2.2.1. Relate to OZO

2.2.2. Not Relate to OZO

2.3. General Public area

2.4. Guest Room Renovation

3. Update Program to achieve construction complete 3 months earlier

3.1. Contractor Engagement

3.1.1. Procurement Delivery of Main Equipment

3.1.2. Man Power

3.1.3. Construction Method

3.1.3.1. Off Site

3.1.3.2. Pre Fab.

3.2. Cash Flow

3.3. Schedule Update

3.3.1. Bidding

3.3.2. Construction Program

3.3.3. Hotel Closure Program

3.3.4. Procurement Program

3.4. Budget / Cost Update

4. Bidding

4.1. Demolition

4.2. MEP

4.3. General ID Contractor

4.4. Build In

4.5. Loose Furniture

4.6. VE. (If require)

5. Design

5.1. ID

5.1.1. Guest Room

5.1.2. Public Area

5.2. MEP

5.2.1. Guest Room

5.2.2. Public Area

5.2.3. Infrastructure

5.3. STR

5.3.1. Public Area

5.3.2. Infrastructure

6. Mock Up room Approval

6.1. Require Design Revise

6.1.1. Revise MUR per New Design

6.1.1.1. New MUR Approval