Green Team by Mind Map: Green Team

1. What do we imagine a Green Museum of the Future looks like?

1.1. Certifications

1.1.1. LEED

1.1.2. WELL

1.1.3. SITES

1.2. Vision

1.2.1. Focus

1.2.1.1. Preserving & Educating African American history and culture

1.2.2. Sustainability

1.2.2.1. Effect on African American Community at large

1.2.2.1.1. Energy

1.2.2.1.2. Waste

1.2.2.1.3. Water

1.2.3. Environmental Justice Exhibition (2022 / 2023)

1.2.4. Museum (23 capital projects) overhauling original systems (end of life)

1.2.4.1. Capital Project Systems

1.2.4.2. Priority Capital Projects 2021

1.2.4.2.1. Chiller Systems

1.2.4.2.2. Steam System --> Boiler

1.2.5. Integrated Systems

1.2.6. Reimaging The Wright

1.2.6.1. Expanded 35% Exhibition Space

1.2.6.2. Moving the Gift Store into the Main Core Exhibit

1.2.6.3. Administrative space

1.2.6.3.1. Autistics

1.3. Approach

1.3.1. Capturing The Story

1.3.2. Optimization of Integration of Systems

1.3.2.1. Skillsets of implementation

1.3.2.2. Resiliency

1.3.2.3. Nature Based Design - Biphilia

1.3.3. ROI - on the social

1.3.3.1. Workplace

1.3.3.2. Work productivity

1.3.4. Computing

1.3.4.1. Cloud interfact

1.3.4.2. BIM 360 model

1.3.4.2.1. Conditions that exist // Look at cost savings

1.3.5. Culture Center Master Plan

1.4. Problems

1.4.1. No prior maintenance of building

1.4.1.1. Facade / External Envelope

1.4.2. June 10th - City of Detroit Assessment of CHW

1.4.3. Building Design - does not meet current / future needs

1.4.3.1. Lacking

1.4.3.1.1. Exhibition Space

1.4.3.1.2. Storage Space

1.4.3.1.3. Electrical Grid is outdated

1.4.3.1.4. 1-passanger elevator, only

1.5. Multi-disciplinary Team

2. What are our goals and objectives?

2.1. Triage Approach

2.1.1. Quick / cost effective solutions

2.1.1.1. Thermal / Comfort

2.1.1.2. Employee Experience

2.1.2. Understanding Future Opportunity / Plan

2.2. Pilot Project - Student Project

2.2.1. Measure Utilities

3. Timeline

3.1. Immediate

3.1.1. November Students Visit

3.1.2. BIM 360 model

3.2. Medium

3.3. Long Term

4. Next Steps

4.1. Sharing Documents

4.2. Draft Outline

4.2.1. Jeff & Neil

4.2.1.1. Roadmap

4.2.1.1.1. Integrated Building Systems

4.3. Storytelling Capture

4.4. Draft Outline - Certification Ready

4.5. Neil's Mtg

4.6. Students - Nov.

5. Oct 16, 2020

5.1. Jeff

5.1.1. City Capital Funds Approved

5.1.1.1. Expecting - chiller / boiler will get addressed (4 years)

5.1.2. We only have 1 chiller

5.2. Longterm

5.2.1. Great Leap Forward "Ground Up / Clean Slate"

5.2.1.1. Holistic / Intergration

5.2.1.1.1. Don't take steps you have to backtrack

5.2.1.2. Next Generation Thought

5.2.1.3. Approach

5.2.1.3.1. Triage

5.2.1.4. Plan

5.2.1.5. Define Where a Green Museum - Foundation - Science & Tech

5.2.1.5.1. Galleries

5.2.1.5.2. BAS

5.2.1.5.3. Power

5.2.1.6. Incrementally

5.2.1.6.1. Long term - net zero

5.3. Data

5.3.1. City Assessment Report

5.4. Consultants

5.4.1. Dustin

5.4.1.1. System Replacement

5.4.1.2. How do we engage an engineer to look at the systems (Independent Review)

5.4.1.2.1. Triage Meeting

5.4.1.2.2. Through Assessment (power, lighting)

5.5. EXECUTIVE SUMMARY (Oct. 30th)

5.5.1. Purpose

5.5.1.1. DOCUMENT: Clean Definition, clear terms (bullet points) - with deliverables (30 days, 60 days) working in progress

5.5.1.1.1. Jeff and Leslie

5.5.1.2. "Clean Slate" - Green Future Museum

5.5.1.2.1. GTTT

5.5.1.3. Triage Approach

5.5.1.3.1. GTTT

5.5.2. Outcomes

5.5.3. Deliverables / Timelines

5.5.3.1. Jeff to ask for capital dollars from City

5.5.3.1.1. Scope

5.5.3.2. Technology Deliverables

5.5.3.2.1. ID

5.5.3.2.2. Upgraded

5.5.3.2.3. Funding

5.5.3.2.4. Budgets

5.5.3.2.5. Timeline

5.5.3.2.6. Experts

5.5.3.3. Capture the Story

5.5.3.3.1. Neil's Vision - green exhibition (in a few years) -- affect communities of color.

5.5.4. Neil's Vision

5.5.4.1. Tie into the Green Movement

5.5.5. Assessment

5.5.5.1. November 6th.