Get Started. It's Free
or sign up with your email address
Hard Limit by Mind Map: Hard Limit

1. Scheduling

1.1. check Under Settings

1.1.1. Options

1.1.1.1. LIMIT NUMBER OF ATTENDEES TO 1000(The value should be equal to Soft Limit)

1.1.1.1.1. Should be editable, User should be able to enable or disable the field while scheduling an event

1.1.1.2. LIMIT EVENT DURATION TO 2 HOURS

1.1.1.2.1. Should be editable, User should be able to enable or disable the field while scheduling an event

1.1.1.3. The default value of the checkboxes should be disabled

1.1.2. SubText

1.1.2.1. If checked, additional attendees will not be allowed to enter.

1.1.2.2. If checked, event will automatically end when it reaches the time limit.

1.2. Event Card

1.2.1. When Event Card Is collapsed

1.2.1.1. No change to existing flow

1.2.2. When Event Card Is Expanded

1.2.2.1. When User Enabled Only Limit ATTENDEES

1.2.2.1.1. We should Show "Event will be limited to 1000(soft limit value) attendees

1.2.2.2. When User Enabled Only Duration

1.2.2.2.1. Event Will be limited to 2 hours

1.2.2.3. When Enabled Both

1.2.2.3.1. We should show "Event will be limited to 1000(Soft limit value) attendees & 2 hours."

1.3. Event Functionality

1.3.1. When Selected

1.3.1.1. When User Enabled Only Limit ATTENDEES

1.3.1.1.1. Event should be limited to Soft limit value set in spector

1.3.1.2. When User Enabled Only Duration

1.3.1.2.1. Event should end after 2 hours

1.3.1.2.2. Banners should be displayed before 15min of time remaining

1.3.1.3. When Enabled Both

1.3.1.3.1. Event should be limited to Soft limit value set in spector

1.3.1.3.2. Event should end after 2 hours

1.3.1.3.3. Banners should be displayed before 15min of time remaining

1.3.2. When Not selected

1.3.2.1. Normal Event flow should happen. We should charge overage for attendees when soft limit is exceede

1.3.2.2. Event should run for max of 24 hrs

2. Existing Events

2.1. Existing EVENTS should not be reflected with this changes

2.1.1. Normal Event flow should happen. We should charge overage for attendees when soft limit is exceede

2.1.2. Event should run for max of 24 hrs

2.2. When User edits an existing events

2.2.1. If user selects

2.2.1.1. When User Enabled Only Limit ATTENDEES

2.2.1.1.1. Event should be limited to Soft limit value set in spector

2.2.1.2. When User Enabled Only Duration

2.2.1.2.1. Event should end after 2 hours

2.2.1.2.2. Banners should be displayed before 15min of time remaining

2.2.1.3. When Enabled Both

2.2.1.3.1. Event should be limited to Soft limit value set in spector

2.2.1.3.2. Event should end after 2 hours

2.2.1.3.3. Banners should be displayed before 15min of time remaining

3. When PT_grouping is enabled

3.1. These Options should come under In-Event

4. check delegation flow