Knowledge area by Mind Map: Knowledge area

1. 9 Human resources

1.1. 9.1 Plan human resources

1.1.1. Inputs

1.1.1.1. Project management plan

1.1.1.2. Activity resource requirements

1.1.1.3. Enterprise environmental factors

1.1.1.4. Organisational process assets

1.1.2. Tools&Techniques

1.1.2.1. Organisational charts and position description

1.1.2.2. Networking

1.1.2.3. Organisational theory

1.1.2.4. Expert judgement

1.1.2.5. Meetings

1.1.3. Outputs

1.1.3.1. Human resources management plan

1.1.4. Predecessors

1.1.4.1. 4.2 Develop project management plan

1.1.4.2. 6.4 Estimate Activity resources

1.1.5. Successors

1.1.5.1. 7.2 Estimate costs

1.1.5.2. 9.2 Acquire project team

1.1.5.3. 9.3 Develop project team

1.1.5.4. 9.4 Manage project team

1.1.5.5. 11.2 Identify risks

1.2. 9.2 Acquire Project team

1.2.1. Inputs

1.2.1.1. Human resource management plan

1.2.1.2. Enterprise environmental factors

1.2.1.3. Organisational process assets

1.2.2. Tools&Techniques

1.2.2.1. Pre-assignment

1.2.2.2. Negotiation

1.2.2.3. Acquisition

1.2.2.4. Virtual teams

1.2.2.5. Multi-criteria decision analysis

1.2.3. Outputs

1.2.3.1. Project staff assignment

1.2.3.2. Resource calendars

1.2.3.3. Project management plan updates

1.2.4. Predecessors

1.2.4.1. 9.1 Plan human Resource Management

1.2.5. Successors

1.2.5.1. 4.2 Develop project management plan

1.2.5.2. 6.4 Estimate activity resources

1.2.5.3. 6.5 Estimate activity durations

1.2.5.4. 6.6 Develop schedule

1.2.5.5. 7.3 Determine budget

1.2.5.6. 9.3 Develop project team

1.2.5.7. 9.4 Manage project team

1.3. 9.3 Develop project team

1.3.1. Inputs

1.3.1.1. Human resource management plan

1.3.1.2. Project staff assignments

1.3.1.3. Resource calendars

1.3.2. Tools&Techniques

1.3.2.1. Interpersonal skills

1.3.2.2. Training

1.3.2.3. Team-building activities

1.3.2.4. Ground rules

1.3.2.5. Colocation

1.3.2.6. Recognition and rewards

1.3.2.7. Personal assessment tools

1.3.3. Outputs

1.3.3.1. Team performance assessment

1.3.3.2. Enterprise environmental factors

1.3.4. Predecessors

1.3.4.1. 9.1 PLan human resource management

1.3.4.2. 9.2 Acquire project team

1.3.4.3. 12.2 Conduct procurements

1.3.5. Successors

1.3.5.1. 9.4 Manage project team

1.4. 9.4 Manage project team

1.4.1. Inputs

1.4.1.1. Human resources management plan

1.4.1.2. Project staff assignments

1.4.1.3. Team performance assessments

1.4.1.4. Issue log

1.4.1.5. Work performance reports

1.4.1.6. Organisational process assets

1.4.2. Tools&Techniques

1.4.2.1. Observation and conversation

1.4.2.2. Project performance appraisals

1.4.2.3. Conflict management

1.4.2.4. Interpersonal skills

1.4.3. Outputs

1.4.3.1. Change requests

1.4.3.2. Project management plan updates

1.4.3.3. Project documents updates

1.4.3.4. Enterprise environmental factors updates

1.4.3.5. Organisational process assets updates

1.4.4. Predecessors

1.4.4.1. 4.4 Monitor and control project work

1.4.4.2. 9.1 Plan human resources management

1.4.4.3. 9.2 Acquire project team

1.4.4.4. 9.3 Develop project team

1.4.4.5. 13.3 Mange stakeholder engagement

1.4.5. Successors

1.4.5.1. 4.2 develop project management plan

1.4.5.2. 4.5 Perform Integrated change control

2. 10 Communications

2.1. 10.1 Plan Communications management

2.1.1. Inputs

2.1.1.1. Project management plan

2.1.1.2. Stakeholder register

2.1.1.3. Enterprise environmental factors

2.1.1.4. Organisational process assets

2.1.2. Tools&Techniques

2.1.2.1. Communication requirements analysis

2.1.2.2. Communication technology

2.1.2.3. Communication models

2.1.2.4. Communication methods

2.1.2.5. Meetings

2.1.3. Outputs

2.1.3.1. Communications management plan

2.1.3.2. Project document updates

2.1.4. Predecessors

2.1.4.1. 4.2 Develop project management plan

2.1.4.2. 13.1 Identify stakeholders

2.1.5. Successors

2.1.5.1. 10.2 Manage communications

2.1.5.2. 13.3 Manage stakeholder engagement

2.2. 10.2 Manage communications

2.2.1. Inputs

2.2.1.1. Communications management plan

2.2.1.2. Work performance reports

2.2.1.3. Enterprise environmental factors

2.2.1.4. Organisational process assets

2.2.2. Tools&Techniques

2.2.2.1. Communication technology

2.2.2.2. Communication models

2.2.2.3. Communication methods

2.2.2.4. Information management system

2.2.2.5. Performance reporting

2.2.3. Outputs

2.2.3.1. Project communications

2.2.3.2. Project management plan updates

2.2.3.3. Project documents updates

2.2.3.4. Organisational process updates

2.2.4. Predecessors

2.2.4.1. 4.4 Monitor and control project work

2.2.4.2. 10.1 Plan communications management

2.2.5. Successors

2.2.5.1. 4.2 Develop project management plan

2.2.5.2. 10.3 Control communications

2.3. 10.3 Control communications

2.3.1. Inputs

2.3.1.1. Project management plan

2.3.1.2. Project communications

2.3.1.3. Issue log

2.3.1.4. Work performance data

2.3.1.5. Organisational process assets

2.3.2. Tools&Techniques

2.3.2.1. Information management system

2.3.2.2. Expert judgement

2.3.2.3. Meetings

2.3.3. Outputs

2.3.3.1. Work performance information

2.3.3.2. Change requests

2.3.3.3. Project management plan updates

2.3.3.4. Project documents updates

2.3.3.5. Organisational process assets updates

2.3.4. Predecessors

2.3.4.1. 4.2 Develop project management plan

2.3.4.2. 4.3 Direct and manage project work

2.3.4.3. 10.2 Manage communications

2.3.4.4. 13.3 manage stakeholder engagement

2.3.5. Successors

2.3.5.1. 4.4 Monitor and control project work

2.3.5.2. 4.5 Perform Integrated change control

3. 11 Risk

3.1. 11.1 Plan risk management

3.1.1. Inputs

3.1.1.1. Project management plan

3.1.1.2. Project charter

3.1.1.3. Stakeholder register

3.1.1.4. Enterprise environmental factors

3.1.1.5. Organisational process assets

3.1.2. Tools&Techniques

3.1.2.1. Analytical techniques

3.1.2.2. Expert judgement

3.1.2.3. Meetings

3.1.3. Outputs

3.1.3.1. Risk management plan

3.1.4. Predecessors

3.1.4.1. 4.1 Develop project charter

3.1.4.2. 4.2 Develop project management plan

3.1.4.3. 13.1 Identify stakeholders

3.1.5. Successors

3.1.5.1. 11.2 Identify risks

3.1.5.2. 11.3 Perform qualitative risk analysis

3.1.5.3. 11.4 Perform quantitative risk analysis

3.1.5.4. 11.5 Plan risk responses

3.2. 11.2 Identify risks

3.2.1. Inputs

3.2.1.1. Risk management plan

3.2.1.2. Cost management plan

3.2.1.3. Schedule management plan

3.2.1.4. Quality management plan

3.2.1.5. Human resource management plan

3.2.1.6. Scope baseline

3.2.1.7. Activity cost estimates

3.2.1.8. Activity duration estimates

3.2.1.9. Stakeholder register

3.2.1.10. Project documents

3.2.1.11. Procurement documents

3.2.1.12. Enterprise environmental factors

3.2.1.13. Organisational process assets

3.2.2. Tools&Techniques

3.2.2.1. Documentation reviews

3.2.2.2. Information gathering techniques

3.2.2.3. Checklist analysis

3.2.2.4. Assumption analysis

3.2.2.5. Diagramming techniques

3.2.2.6. SWOT analysis

3.2.2.7. Expert judgement

3.2.3. Outputs

3.2.3.1. Risk register

3.2.4. Predecessors

3.2.4.1. 5.4 Create WBS

3.2.4.2. 6.1 Plan schedule management

3.2.4.3. 6.5 Estimate activity durations

3.2.4.4. 7.1 Project cost management

3.2.4.5. 7.2 Estimate costs

3.2.4.6. 8.1 Plan quality management

3.2.4.7. 9.1 Plan human resource management

3.2.4.8. 11.1 Plan risk management

3.2.4.9. 12.1 Plan procurement management

3.2.4.10. 13.1 Identify stakeholders

3.2.5. Successors

3.2.5.1. 7.2 Estimate Costs

3.2.5.2. 8.1 Plan quality management

3.2.5.3. 11.3 Perform qualitative risk analysis

3.2.5.4. 11.4 Perform quantitative risk analysis

3.2.5.5. 11.5 Plan risk responses

3.2.5.6. 11.6 Contro risks

3.2.5.7. 12.1 Plan procurement management

3.3. 11.3 Perform qualitative risk analysis

3.3.1. Inputs

3.3.1.1. Risk management plan

3.3.1.2. Scope baseline

3.3.1.3. Risk register

3.3.1.4. Enterprise environmental factors

3.3.1.5. Organisational process assets

3.3.2. Tools&Techniques

3.3.2.1. Risk probability and impact assessment

3.3.2.2. Probability and impact matrix

3.3.2.3. Risk data quality assessment

3.3.2.4. Risk categorisation

3.3.2.5. Risk urgency assessment

3.3.2.6. Expert judgement

3.3.3. Outputs

3.3.3.1. Project documents updates

3.3.4. Predecessors

3.3.4.1. 5.4 Create WBS

3.3.4.2. 11.1 Plan risk management

3.3.4.3. 11.2 Identify risks

3.3.5. Successors

3.3.5.1. NONE

3.4. 11.4 Perform quantitative risk analysis

3.4.1. Inputs

3.4.1.1. Risk management plan

3.4.1.2. Cost management plan

3.4.1.3. Schedule management plan

3.4.1.4. Risk register

3.4.1.5. Enterprise environmental factors

3.4.1.6. Organisational process assets

3.4.2. Tools&Techniques

3.4.2.1. Data gathering and representation techniques

3.4.2.2. Quantitative risk analysis and modeling techniques

3.4.2.3. Expert judgement

3.4.3. Outputs

3.4.3.1. Project documents updates

3.4.4. Predecessors

3.4.4.1. 6.1 Plan schedule management

3.4.4.2. 7.1 Paln cost management

3.4.4.3. 11.1 Plan risk management

3.4.4.4. 11.2 Identify risks

3.4.5. Successors

3.4.5.1. NONE

3.5. 11.5 Plan risk responses

3.5.1. Inputs

3.5.1.1. Risk management plan

3.5.1.2. Risk register

3.5.2. Tools&Techniques

3.5.2.1. Strategies for negative risks or threats

3.5.2.2. Strategies for positive risks or opportunities

3.5.2.3. Contingent response strategies

3.5.2.4. Expert judgement

3.5.3. Outputs

3.5.3.1. Project management plan updates

3.5.3.2. Project documents updates

3.5.4. Predecessors

3.5.4.1. 11.1 Plan risk management

3.5.4.2. 11.2 Identify risks

3.5.5. Successors

3.5.5.1. 4.2 develop project management plan

3.6. 11.6 Control risks

3.6.1. Inputs

3.6.1.1. Project management plan

3.6.1.2. Risk register

3.6.1.3. Work performance data

3.6.1.4. Work performance reports

3.6.2. Tools&Techniques

3.6.2.1. Risk reassessment

3.6.2.2. Risk audits

3.6.2.3. Variance and trend analysis

3.6.2.4. Technical performance measurement

3.6.2.5. Reserve analysis

3.6.2.6. Meetings

3.6.3. Outputs

3.6.3.1. Work performance information

3.6.3.2. Change requests

3.6.3.3. Project management plan updates

3.6.3.4. Project documents updates

3.6.3.5. Organisational process assets updates

3.6.4. Predecessors

3.6.4.1. 4.2 Develop project management plan

3.6.4.2. 4.3 Direct and manage project work

3.6.4.3. 4.4 Monitor and control project work

3.6.4.4. 11.2 Identify risks

3.6.5. Successors

3.6.5.1. 4.2 Develop project management plan

3.6.5.2. 4.4 Monitor and control Project work

3.6.5.3. 4.5 Perform integrated change control

4. 12 Procurement

4.1. 12.1 Plan procurement management

4.1.1. Inputs

4.1.1.1. Project management plan

4.1.1.2. Requirements documentation

4.1.1.3. Risk register

4.1.1.4. Activity resources requirements

4.1.1.5. Project schedule

4.1.1.6. Activity cost estimates

4.1.1.7. Stakeholder register

4.1.1.8. Enterprise environmental factors

4.1.1.9. Organisational process assets

4.1.2. Tools&Techniques

4.1.2.1. Make-or-buy analysis

4.1.2.2. Expert judgement

4.1.2.3. Market research

4.1.2.4. Meetings

4.1.3. Outputs

4.1.3.1. Procurement management plan

4.1.3.2. Procurement statement of work

4.1.3.3. Procurement documents

4.1.3.4. Source selection criteria

4.1.3.5. Make-or-buy decisions

4.1.3.6. Change requests

4.1.3.7. Project documents updates

4.1.4. Predecessors

4.1.4.1. 4.2 Develop project management plan

4.1.4.2. 5.2 Collect requirements

4.1.4.3. 6.4 Estimate activity resources

4.1.4.4. 6.6 Develop schedule

4.1.4.5. 7.2 Estimate costs

4.1.4.6. 11.2 Identify risks

4.1.4.7. 13.1 Identify stakeholders

4.1.5. Successors

4.1.5.1. 4.5 Perform integrated change control

4.1.5.2. 11.2 Identify risks

4.1.5.3. 12.2 Conduct procurements

4.1.5.4. 12.3 Control procurements

4.1.5.5. 12.4 Close procurements

4.1.5.6. 13.1 Identify stakeholder

4.2. 12.2 Conduct procurements

4.2.1. Inputs

4.2.1.1. Procurement management plan

4.2.1.2. Procurement documents

4.2.1.3. Source selection criteria

4.2.1.4. Seller proposals

4.2.1.5. Project documents

4.2.1.6. Make-or-buy decisions

4.2.1.7. Procurement statement of work

4.2.1.8. Organisational process assets

4.2.2. Tools&Techniques

4.2.2.1. Bidder conference

4.2.2.2. Proposal evaluation techniques

4.2.2.3. Independent estimates

4.2.2.4. Expert judgement

4.2.2.5. Advertising

4.2.2.6. Analytical techniques

4.2.2.7. Procurement negotiations

4.2.3. Outputs

4.2.3.1. Selected sellers

4.2.3.2. Agreements

4.2.3.3. Resource calendars

4.2.3.4. Change requests

4.2.3.5. Project management plan updates

4.2.3.6. Project documents updates

4.2.4. Predecessors

4.2.4.1. 12.1 Plan procurement management

4.2.5. Successors

4.2.5.1. 4.1 Develop project charter

4.2.5.2. 4.2 Develop project management plan

4.2.5.3. 4.5 Perform integrated change control

4.2.5.4. 6.4 Estimate activity resources

4.2.5.5. 6.5 Estimate activity durations

4.2.5.6. 6.6 Develop schedule

4.2.5.7. 7.3 Determine budget

4.2.5.8. 9.3 Develop project team

4.2.5.9. 12.3 Control procurements

4.3. 12.3 Control procurements

4.3.1. Inputs

4.3.1.1. Project management plan

4.3.1.2. Procurements documents

4.3.1.3. Agreements

4.3.1.4. Approved change requests

4.3.1.5. Work performance reports

4.3.1.6. Work performance data

4.3.2. Tools&Techniques

4.3.2.1. Contract change control system

4.3.2.2. Procurement performance review

4.3.2.3. Inspection and audits

4.3.2.4. Performance reporting

4.3.2.5. Payment systems

4.3.2.6. Records management system

4.3.3. Outputs

4.3.3.1. Work performance information

4.3.3.2. Change requests

4.3.3.3. Project management plan updates

4.3.3.4. Project documents updates

4.3.3.5. Organisational process assets updates

4.3.4. Predecessors

4.3.4.1. 4.2 Develop project management plan

4.3.4.2. 4.3 Direct and manage project work

4.3.4.3. 4.4 Monitor and control project work

4.3.4.4. 4.5 Perform integrated change control

4.3.4.5. 12.1 Plan procurement management

4.3.4.6. 12.2 Conduct procurements

4.3.5. Successors

4.3.5.1. 4.4 Monitor and control project work

4.3.5.2. 4.5 Perform Integrated change control

4.4. 12.4 Close procurements

4.4.1. Inputs

4.4.1.1. Project management plan

4.4.1.2. Procurement documents

4.4.2. Tools&Techniques

4.4.2.1. Procurement audits

4.4.2.2. Procurement negotiations

4.4.2.3. Records management system

4.4.3. Outputs

4.4.3.1. Closed procurements

4.4.3.2. Organisational process assets updates

4.4.4. Predecessors

4.4.4.1. 4.2 Develop project management plan

4.4.4.2. 12.1 Plan procurement management

4.4.5. Successors

4.4.5.1. None

5. 13 Stakeholder

5.1. 13.1 Identify stakeholders

5.1.1. Inputs

5.1.1.1. Project charter

5.1.1.2. Procurement documents

5.1.1.3. Enterprise environmental factors

5.1.1.4. Organisational process assets

5.1.2. Tools&Techniques

5.1.2.1. Stakeholder analysis

5.1.2.2. Expert judgement

5.1.2.3. Meetings

5.1.3. Outputs

5.1.3.1. Stakeholder register

5.1.4. Predecessors

5.1.4.1. 4.1 Develop project charter

5.1.4.2. 12.1 Plan procurement management

5.1.5. Successors

5.1.5.1. 5.2 Collect requirements

5.1.5.2. 8.1 Plan quality management

5.1.5.3. 10.1 Plan communications management

5.1.5.4. 11.1 Plan risk management

5.1.5.5. 11.2 Identify risks

5.1.5.6. 12.1 Plan procurement management

5.1.5.7. 13.2 Plan Stakeholder management

5.2. 13.2 Plan stakeholder management

5.2.1. Inputs

5.2.1.1. Project management plan

5.2.1.2. Stakeholder register

5.2.1.3. Enterprise environmental factors

5.2.1.4. Organisational process assets

5.2.2. Tools&Techniques

5.2.2.1. Expert judgement

5.2.2.2. Meetings

5.2.2.3. Analytical techniques

5.2.3. Outputs

5.2.3.1. Stakeholder management plan

5.2.3.2. Project documents updates

5.2.4. Predecessors

5.2.4.1. 4.2 Develop project management plan

5.2.4.2. 13.1 Identify stakeholders

5.2.5. Successors

5.2.5.1. 5.2 Collect requirements

5.2.5.2. 13.3 Manage stakeholder engagement

5.3. 13.3 Manage stakeholder engagement

5.3.1. Inputs

5.3.1.1. Stakeholder management plan

5.3.1.2. Communications management plan

5.3.1.3. Change log

5.3.1.4. Organisational process assets

5.3.2. Tools&Techniques

5.3.2.1. Communication methods

5.3.2.2. Interpersonal skills

5.3.2.3. management skills

5.3.3. Outputs

5.3.3.1. Issue log

5.3.3.2. Change requests

5.3.3.3. Project Management plan updates

5.3.3.4. Project documents updates

5.3.3.5. Organisational process assets updates

5.3.4. Predecessors

5.3.4.1. 4.5 Perform integrated change control

5.3.4.2. 10.1 Plan communications management

5.3.4.3. 13.2 Plan stakeholder management

5.3.5. Successors

5.3.5.1. 4.2 Develop Project management plan

5.3.5.2. 4.5 Perform Integrated chenge control

5.3.5.3. 9.4 Manage project team

5.3.5.4. 10.3 Control Communications

5.3.5.5. 13.4 Control Stakeholder Engagement

5.4. 13.4 Control stakeholder engagement

5.4.1. Inputs

5.4.1.1. Project management plan

5.4.1.2. Issue log

5.4.1.3. Work performance data

5.4.1.4. Project documents

5.4.2. Tools&Techniques

5.4.2.1. Information management systems

5.4.2.2. Expert judgement

5.4.2.3. Meetings

5.4.3. Outputs

5.4.3.1. Work performance information

5.4.3.2. Change requests

5.4.3.3. Project management plan updates

5.4.3.4. Project documents updates

5.4.3.5. Organisational process assets updates

5.4.4. Predecessors

5.4.4.1. 4.2 Develop project management plan

5.4.4.2. 4.3 Direct and manage project work

5.4.4.3. 13.3 Manage stakeholder engagement

5.4.5. Successors

5.4.5.1. 4.4 Monitor and control project work

5.4.5.2. 4.5 Perform Integrated change control

6. Colors: red - Initiation green - Planing blue - Executing yellow - Monitor and Control gray - Closing

7. Observations: 1. Processes from M&C group a) has first input Project management plan b) does not have EEF as input c) has output Project management plan updates, project documents updates, OPA updates 2. Processes from Planning&Executing a) has as input parent plan

8. 4 Integration

8.1. 4.1 Develop project charter

8.1.1. Inputs

8.1.1.1. Project statement of work

8.1.1.1.1. Business need Product description Strategic plan

8.1.1.2. Business case

8.1.1.2.1. Market demand Organisational needs Customer request Technological advance legal requirement Ecological impact Social need

8.1.1.3. Agreements

8.1.1.3.1. Initial intention of project contracts memorandums of understanding service level agreements letter of intent verbal, written agreements

8.1.1.4. Enterprise environmental factors

8.1.1.4.1. Governmental standards, industry standards, regulations, Organisational structure and culture Marketplace conditions

8.1.1.5. Organisational process assets

8.1.1.5.1. Organisational standard processes, policies and process definition Templates HIstorical information and lessons learned knowledge base

8.1.2. Tools&Techniques

8.1.2.1. Expert judgement

8.1.2.2. Facilitation techniques

8.1.3. Outputs

8.1.3.1. Project charter

8.1.4. Predecessors

8.1.4.1. None

8.1.5. Successors

8.1.5.1. 4.2 Develop project management plan

8.1.5.2. 5.1 Plan Scope management

8.1.5.3. 5.2 Collect requirements

8.1.5.4. 5.3 Define scope

8.1.5.5. 6.1 Plan schedule management

8.1.5.6. 7.1 Plan Cost management

8.1.5.7. 11.1 Plan Risk management

8.1.5.8. 13.1 Identify Stakeholders

8.2. 4.2 Develop project management plan

8.2.1. Inputs

8.2.1.1. Project charter

8.2.1.2. Outputs from other processes

8.2.1.3. Enterprise environmental factors

8.2.1.4. Organisational process assets

8.2.2. Tools&Techniques

8.2.2.1. Expert judgement

8.2.2.2. Facilitation techniques

8.2.3. Outputs

8.2.3.1. Project management plan

8.2.4. Predecessors

8.2.4.1. 4.1 Develop project charter

8.2.5. Successors

8.2.5.1. 4.3 Direct and manage project work

8.2.5.2. 4.4 Monitor and control project work

8.2.5.3. 4.5 Perform Integrated chenge control

8.2.5.4. 4.6 Close Project or phase

8.2.5.5. 5.1 Plan Scope management

8.2.5.6. 5.6 Control Scope

8.2.5.7. 6.1 Plan schedule management

8.2.5.8. 6.7 Control Schedule

8.2.5.9. 7.1 Plan Cost management

8.2.5.10. 7.4 Control Costs

8.2.5.11. 8.1 Plan quality management

8.2.5.12. 9.1 Plan Human Resource management

8.2.5.13. 10.1 Plan Communications management

8.2.5.14. 10.3 Control Communications

8.2.5.15. 11.1 Plan Risk management

8.2.5.16. 11.6 Control Risks

8.2.5.17. 12.1 Plan Procurement management

8.2.5.18. 12.3 Control Procurements

8.2.5.19. 12.4 Close Procurements

8.2.5.20. 13.2 Plan Stakeholder Management

8.2.5.21. 13.4 Control Stakeholder Engagement

8.3. 4.3 Direct and Manage project work

8.3.1. Inputs

8.3.1.1. Project management plan

8.3.1.2. Approved Change requests

8.3.1.3. Enterprise environmental factors

8.3.1.4. Organisational process assets

8.3.2. Tools&Techniques

8.3.2.1. Expert judgement

8.3.2.2. Project management information system

8.3.2.3. Meetings

8.3.3. Outputs

8.3.3.1. Deliverables

8.3.3.2. Work performance data

8.3.3.3. Change requests

8.3.3.4. Project Management plan updates

8.3.3.5. Project documents updates

8.3.4. Predecessors

8.3.4.1. 4.2 Develop project management plan

8.3.5. Successors

8.3.5.1. 4.2 Develop Project management plan

8.3.5.2. 4.5 Perform Integrated chenge control

8.3.5.3. 5.5 Validate Scope

8.3.5.4. 5.6 Control Scope

8.3.5.5. 6.7 Control Schedule

8.3.5.6. 7.4 Control Costs

8.3.5.7. 8.3 Control Quality

8.3.5.8. 10.3 Control Communications

8.3.5.9. 11.6 Control Risks

8.3.5.10. 12.3 Control Procurements

8.3.5.11. 13.4 Control Stakeholder Engagement

8.4. 4.4 Monitor and control project work

8.4.1. Inputs

8.4.1.1. Project management plan

8.4.1.2. Schedule forecasts

8.4.1.3. Cost forecasts

8.4.1.4. Validated changes

8.4.1.5. Work performance information

8.4.1.6. Enterprise environmental factors

8.4.1.7. Organisational process assets

8.4.2. Tools&Techniques

8.4.2.1. Expert judgement

8.4.2.2. Analytical techniques

8.4.2.3. Project management information system

8.4.2.4. Meetings

8.4.3. Outputs

8.4.3.1. Change requests

8.4.3.2. Work performance reports

8.4.3.3. Project management plan updates

8.4.3.4. Project documents updates

8.4.4. Predecessors

8.4.4.1. 4.2 Develop project management plan

8.4.4.2. 5.5 Validate Scope

8.4.4.3. 5.6 Control Scope

8.4.4.4. 6.7 Control Schedule

8.4.4.5. 7.4 Control Costs

8.4.4.6. 8.4. Control Quality

8.4.4.7. 10.3 Control Communications

8.4.4.8. 11.6 Control Risks

8.4.4.9. 12.3 Control Procurements

8.4.4.10. 13.4 Control Stakeholder engagement

8.4.5. Successors

8.4.5.1. 4.2 Develop project management plan

8.4.5.2. 4.5 Perform Integrated change control

8.4.5.3. 9.4 Manage project team

8.4.5.4. 10.2 Manage communications

8.4.5.5. 11.6 Control Risks

8.4.5.6. 12.3 Control Procurements

8.5. 4.5 Perform integrated change control

8.5.1. Inputs

8.5.1.1. Project management plan

8.5.1.2. Work performance reports

8.5.1.3. Change requests

8.5.1.4. Enterprise environmental factors

8.5.1.5. Organisational process assets

8.5.2. Tools&Techniques

8.5.2.1. Expert judgement

8.5.2.2. Meetings

8.5.2.3. Change control tools

8.5.3. Outputs

8.5.3.1. Approved change requests

8.5.3.2. Change log

8.5.3.3. Project management plan updates

8.5.3.4. Project documents updates

8.5.4. Predecessors

8.5.4.1. 4.2 Develop project management plan

8.5.4.2. 4.3 Direct and manage project work

8.5.4.3. 4.4 Monitor and control project work

8.5.4.4. 5.5 Validate scope

8.5.4.5. 5.6 Control scope

8.5.4.6. 6.7 Control Schedule

8.5.4.7. 7.4 Control costs

8.5.4.8. 8.2 Perform quality assurance

8.5.4.9. 8.3 COntrol quality

8.5.4.10. 9.4 Manage project team

8.5.4.11. 10.3 Control communications

8.5.4.12. 11.6 Control risks

8.5.4.13. 12.1 Plan procurement management

8.5.4.14. 12.2 Conduct procurements

8.5.4.15. 12.3 Control procurements

8.5.4.16. 13.3 Manage Stakeholder engagement

8.5.4.17. 13.4 Control Stakeholder engagement

8.5.5. Successors

8.5.5.1. 4.2 develop project management plan

8.5.5.2. 4.3 Direct and manage project work

8.5.5.3. 8.3 Control quality

8.5.5.4. 12.3 Control Procurements

8.5.5.5. 13.3 Manage Stakeholder engagement

8.6. 4.6 Close project or phase

8.6.1. Inputs

8.6.1.1. Project management plan

8.6.1.2. Accepted deliverables

8.6.1.3. Organisational process assets

8.6.2. Tools&Techniques

8.6.2.1. Expert judgement

8.6.2.2. Analytical techniques

8.6.2.3. Meetings

8.6.3. Outputs

8.6.3.1. Final product, service or result transition

8.6.3.2. Organisational process assets

8.6.4. Predecessors

8.6.4.1. 4.2 Develop project management plan

8.6.4.2. 5.5 Validate scope

8.6.5. Successors

8.6.5.1. None

9. 5 Scope

9.1. 5.1 Plan Scope management

9.1.1. Inputs

9.1.1.1. Project management plan

9.1.1.2. Project charter

9.1.1.3. Enterprise environmental factors

9.1.1.4. Organisational process assets

9.1.2. Tools&Techniques

9.1.2.1. Expert judgement

9.1.2.2. Meetings

9.1.3. Outputs

9.1.3.1. Scope management plan

9.1.3.2. Requirements management plan

9.1.4. Predecessors

9.1.4.1. 4.1 Develop project charter

9.1.4.2. 4.2 Develop project management plan

9.1.5. Successors

9.1.5.1. 5.2 Collect requirements

9.1.5.2. 5.3 Define scope

9.1.5.3. 5.4 Create WBS

9.2. 5.2 Collect requirements

9.2.1. Inputs

9.2.1.1. Scope management plan

9.2.1.2. Requirements management plan

9.2.1.3. Stakeholder management plan

9.2.1.4. Project charter

9.2.1.5. Stakeholder Register

9.2.2. Tools&Techniques

9.2.2.1. Interviews

9.2.2.2. Focus groups

9.2.2.3. Facilitated workshops

9.2.2.4. Group creativity techniques

9.2.2.5. Group decision-making techniques

9.2.2.6. Questionnaires and surveys

9.2.2.7. Observations

9.2.2.8. Prototypes

9.2.2.9. Benchmarking

9.2.2.10. Context diagrams

9.2.2.11. Document analysis

9.2.3. Outputs

9.2.3.1. Requirements documentation

9.2.3.2. Requirements traceability matrix

9.2.4. Predecessors

9.2.4.1. 4.1 Develop project charter

9.2.4.2. 5.1 Plan scope management

9.2.4.3. 13.1 Identify stakeholders

9.2.4.4. 13.2 Plan stakeholder management

9.2.5. Successors

9.2.5.1. 5.3 Define scope

9.2.5.2. 5.4 Create WBS

9.2.5.3. 5.5 Validate Scope

9.2.5.4. 5.6 Control Scope

9.2.5.5. 8.1 Plan quality management

9.2.5.6. 12.1 Plan procurement management

9.3. 5.3 Define scope

9.3.1. Inputs

9.3.1.1. Scope management plan

9.3.1.2. Project charter

9.3.1.3. Requirements documentation

9.3.1.4. Organisational process assets

9.3.2. Tools&Techniques

9.3.2.1. Expert judgement

9.3.2.2. Product analysis

9.3.2.3. Alternative generation

9.3.2.4. Facilitated workshop

9.3.3. Outputs

9.3.3.1. Project scope statement

9.3.3.2. Project documents updates

9.3.4. Predecessors

9.3.4.1. 5.1 Plan Scope management

9.3.4.2. 5.2 Collect requirements

9.3.5. Successors

9.3.5.1. 5.4 Create WBS

9.3.5.2. 6.3 Sequence activities

9.3.5.3. 6.5 Estimate activity durations

9.3.5.4. 6.6 Develop schedule

9.4. 5.4 Create WBS

9.4.1. Inputs

9.4.1.1. Scope management plan

9.4.1.2. Project scope statement

9.4.1.3. Requirements documentation

9.4.1.4. Enterprise environmental factors

9.4.1.5. Organisational process assets

9.4.2. Tools&Techniques

9.4.2.1. Decomposition

9.4.2.2. Expert judgement

9.4.3. Outputs

9.4.3.1. Scope baseline

9.4.3.2. Project documents updates

9.4.4. Predecessors

9.4.4.1. 5.1 Plan Scope management

9.4.4.2. 5.2 Collect requirements

9.4.4.3. 5.3 Define Scope

9.4.5. Successors

9.4.5.1. 4.2 develop project management plan

9.4.5.2. 5.5 Validate Scope

9.4.5.3. 6.2 Define activities

9.4.5.4. 7.2 Estimate Costs

9.4.5.5. 7.3 determine Budget

9.4.5.6. 11.2 identify risks

9.4.5.7. 11.3 Perform Qualitative risk analysis

9.5. 5.5 Validate Scope

9.5.1. Inputs

9.5.1.1. Project management plan

9.5.1.2. Requirements documentation

9.5.1.3. Requirements traceability matrix

9.5.1.4. Verified deliverables

9.5.1.5. Work performance data

9.5.2. Tools&Techniques

9.5.2.1. Inspection

9.5.2.2. Group decision making techniques

9.5.3. Outputs

9.5.3.1. Accepted deliverables

9.5.3.2. Change requests

9.5.3.3. Work performance information

9.5.3.4. Project documents updates

9.5.4. Predecessors

9.5.4.1. 4.2 Develop project management plan

9.5.4.2. 4.3 Direct and manage project work

9.5.4.3. 5.2 Collect requirements

9.5.4.4. 8.3 Control Quality

9.5.5. Successors

9.5.5.1. 4.4 Monitor and control project work

9.5.5.2. 4.5 Perform Integrated change control

9.5.5.3. 4.6 Close project or phase

9.6. 5.6 Control Scope

9.6.1. Inputs

9.6.1.1. Project management plan

9.6.1.2. Requirements documentation

9.6.1.3. Requirements traceability matrix

9.6.1.4. Work performance data

9.6.1.5. Organisational process assets

9.6.2. Tools&Techniques

9.6.2.1. Variance analysis

9.6.3. Outputs

9.6.3.1. Work performance information

9.6.3.2. Change requests

9.6.3.3. Project management plan updates

9.6.3.4. Project documents updates

9.6.3.5. Organisational process assets updates

9.6.4. Predecessors

9.6.4.1. 4.2 Develop project management plan

9.6.4.2. 4.3 Direct and manage project work

9.6.4.3. 5.2 Collect requirements

9.6.5. Successors

9.6.5.1. 4.2 Develop project management plan

9.6.5.2. 4.4 Monitor and control Project work

9.6.5.3. 4.5 Perform integrated change control

10. 6 Time

10.1. 6.1 Plan Schedule management

10.1.1. Inputs

10.1.1.1. Project management plan

10.1.1.2. Project charter

10.1.1.3. Enterprise environmental factors

10.1.1.4. Organisational process assets

10.1.2. Tools&Techniques

10.1.2.1. Expert judgement

10.1.2.2. Analytical techniques

10.1.2.3. Meetings

10.1.3. Outputs

10.1.3.1. Schedule management plan

10.1.4. Predecessors

10.1.4.1. 4.1 Develop project charter

10.1.4.2. 4.2 Develop project management plan

10.1.5. Successors

10.1.5.1. 6.2 Define activities

10.1.5.2. 6.3 Sequence activities

10.1.5.3. 6.4 Estimate activity resources

10.1.5.4. 6.5 Estimate activity durations

10.1.5.5. 6.6 develop schedule

10.1.5.6. 11.2 Identify risks

10.1.5.7. 11.4 Perform Quantitative Risk Analysis

10.2. 6.2 Define activities

10.2.1. Inputs

10.2.1.1. Schedule management plan

10.2.1.2. Scope baseline

10.2.1.3. Enterprise environmental factors

10.2.1.4. Organisational process assets

10.2.2. Tools&Techniques

10.2.2.1. Decomposition

10.2.2.2. Rolling wave planning

10.2.2.3. Expert judgement

10.2.3. Outputs

10.2.3.1. Activity list

10.2.3.2. Activity attributes

10.2.3.3. Milestone list

10.2.4. Predecessors

10.2.4.1. 5.4 Create WBS

10.2.4.2. 6.1 Plan schedule management

10.2.5. Successors

10.2.5.1. 6.3 Sequence activities

10.2.5.2. 6.4 Estimate activity resources

10.2.5.3. 6.5 Estimate activity durations

10.2.5.4. 6.6 Develop schedule

10.3. 6.3 Sequence activities

10.3.1. Inputs

10.3.1.1. Schedule management plan

10.3.1.2. Activity list

10.3.1.3. Activity attributes

10.3.1.4. Milestone list

10.3.1.5. Project scope statement

10.3.1.6. Enterprise environmental factors

10.3.1.7. Organisational process assets

10.3.2. Tools&Techniques

10.3.2.1. Precedence diagramming method (PDM)

10.3.2.2. Dependency determination

10.3.2.3. Leads and Lags

10.3.3. Outputs

10.3.3.1. Project schedule network diagrams

10.3.3.2. Project documents updates

10.3.3.2.1. Activity list Activity attributes Milestone list Risk Register ...

10.3.4. Predecessors

10.3.4.1. 5.3 Define scope

10.3.4.2. 6.1 Plan schedule management

10.3.4.3. 6.2 Define activities

10.3.5. Successors

10.3.5.1. 6.6 Develop schedule

10.4. 6.4 Estimate activity resources

10.4.1. Inputs

10.4.1.1. Schedule management plan

10.4.1.2. Activity list

10.4.1.3. Activity attributes

10.4.1.4. Resource calendars

10.4.1.5. Risk register

10.4.1.6. Activity cost estimates

10.4.1.7. Enterprise environmental factors

10.4.1.8. Organisational process assets

10.4.2. Tools&Techniques

10.4.2.1. Expert judgement

10.4.2.2. Alternative analysis

10.4.2.3. Published estimating data

10.4.2.4. Bottom-up estimating

10.4.2.5. Project management software

10.4.3. Outputs

10.4.3.1. Activity resource requirements

10.4.3.2. Resource breakdown structure

10.4.3.3. Project document updates

10.4.3.3.1. Activity list Activity attributes Resource calendars ...

10.4.4. Predecessors

10.4.4.1. 6.1 Plan schedule management

10.4.4.2. 6.2 Define activities

10.4.4.3. 7.2 Estimate costs

10.4.4.4. 9.2 Acquire project team

10.4.4.5. 11.2 Identify risks

10.4.4.6. 12.2 Conduct procurements

10.4.5. Successors

10.4.5.1. 6.5 Estimate activity durations

10.4.5.2. 6.6 Develop schedule

10.4.5.3. 9.1 Plan human resource management

10.4.5.4. 12.1 Plan procurement management

10.5. 6.5 Estimate activity durations

10.5.1. Inputs

10.5.1.1. Schedule management plan

10.5.1.2. Activity list

10.5.1.3. Activity attributes

10.5.1.4. Activity resource requirements

10.5.1.5. Resource calendars

10.5.1.6. Project scope statement

10.5.1.7. Risk register

10.5.1.8. Resource breakdown structure

10.5.1.9. Enterprise environmental factors

10.5.1.10. Organisational process assets

10.5.2. Tools&Techniques

10.5.2.1. Expert judgement

10.5.2.2. Analogous estimating

10.5.2.3. Parametric estimating

10.5.2.4. Three-point estimating

10.5.2.5. Group decision making techniques

10.5.2.6. Reserve analysis

10.5.3. Outputs

10.5.3.1. Activity duration estimates

10.5.3.2. Project documents updates

10.5.3.2.1. Activity attributes Assumption made in Activity duration estimates Basis of Estimates ...

10.5.4. Predecessors

10.5.4.1. 5.3 Define scope

10.5.4.2. 6.1 Plan schedule management

10.5.4.3. 6.2 Define activities

10.5.4.4. 6.4 Estimate activity resources

10.5.4.5. 9.2 Acquire project team

10.5.4.6. 11.2 Identify risks

10.5.4.7. 12.2 Conduct procurements

10.5.5. Successors

10.5.5.1. 6.6 Develop schedule

10.5.5.2. 11.2 Identify risks

10.6. 6.6 Develop schedule

10.6.1. Inputs

10.6.1.1. Schedule management plan

10.6.1.2. Activity list

10.6.1.3. Activity attributes

10.6.1.4. Project schedule network diagrams

10.6.1.5. Activity resources requirements

10.6.1.6. Activity duration estimates

10.6.1.7. Project scope statement

10.6.1.8. Risk register

10.6.1.9. Project staff assignments

10.6.1.10. Resource breakdown structure

10.6.1.11. Enterprise environmental factors

10.6.1.12. Organisational process assets

10.6.2. Tools&Techniques

10.6.2.1. Schedule network analysis

10.6.2.2. Critical path method

10.6.2.3. Critical chain method

10.6.2.4. Resource optimisation techniques

10.6.2.5. Modeling techniques

10.6.2.6. Leads and Lags

10.6.2.7. Schedule compression

10.6.2.8. Scheduling tool

10.6.3. Outputs

10.6.3.1. Schedule baseline

10.6.3.2. Project schedule

10.6.3.3. Schedule data

10.6.3.4. Project calendars

10.6.3.5. Project management plan updates

10.6.3.6. Project document updates

10.6.3.6.1. Activity resource requirements Activity attributes Calendars Risk register ...

10.6.4. Predecessors

10.6.4.1. 5.3 Define scope

10.6.4.2. 6.1 Plan schedule management

10.6.4.3. 6.2 Define activities

10.6.4.4. 6.3 Sequence activities

10.6.4.5. 6.4 Estimate activity resources

10.6.4.6. 6.5 Estimate activity durations

10.6.4.7. 9.2 Acquire project team

10.6.4.8. 11.2 Identify risks

10.6.4.9. 12.2 Conduct procurements

10.6.5. Successors

10.6.5.1. 4.2 Develop project management plan

10.6.5.2. 6.7 Control schedule

10.6.5.3. 7.2 Estimate Costs

10.6.5.4. 7.3 Determine budget

10.6.5.5. 12.1 Plan procurement management

10.7. 6.7 Control schedule

10.7.1. Inputs

10.7.1.1. Project management plan

10.7.1.2. Project schedule

10.7.1.3. Work performance data

10.7.1.4. Project calendars

10.7.1.5. Schedule data

10.7.1.6. Organisational process assets

10.7.2. Tools&Techniques

10.7.2.1. Performance reviews

10.7.2.2. Project management software

10.7.2.3. Resource optimisation techniques

10.7.2.4. Modeling techniques

10.7.2.5. Leads and Lags

10.7.2.6. Schedule compression

10.7.2.7. Scheduling tool

10.7.3. Outputs

10.7.3.1. Work performance information

10.7.3.2. Schedule forecasts

10.7.3.3. Change requests

10.7.3.4. Project management plan updates

10.7.3.5. Project documents updates

10.7.3.6. Organisational process assets

10.7.4. Predecessors

10.7.4.1. 4.2 Develop project management plan

10.7.4.2. 4.3 Direct and manage project work

10.7.4.3. 6.6 develop schedule

10.7.5. Successors

10.7.5.1. 4.4 Monitor and control project work

10.7.5.2. 4.5 Perform Integrated change control

11. 7 Cost

11.1. 7.1 Plan Cost management

11.1.1. Inputs

11.1.1.1. Project management plan

11.1.1.2. Project charter

11.1.1.3. Enterprise environmental factors

11.1.1.4. Organisational process assets

11.1.2. Tools&Techniques

11.1.2.1. Expert judgement

11.1.2.2. Analytical techniques

11.1.2.3. Meetings

11.1.3. Outputs

11.1.3.1. Cost management plan

11.1.4. Predecessors

11.1.4.1. 4.1 Develop project charter

11.1.4.2. 4.2 Develop project management plan

11.1.5. Successors

11.1.5.1. 6.2 Define activities

11.1.5.2. 6.3 Sequence activities

11.1.5.3. 11.2 Identify risks

11.1.5.4. 11.4 Perform Quantitative risk analysis

11.2. 7.2 Estimate costs

11.2.1. Inputs

11.2.1.1. Cost management plan

11.2.1.2. Human resource management plan

11.2.1.3. Scope baseline

11.2.1.4. Project schedule

11.2.1.5. Risk register

11.2.1.6. Enterprise environmental factors

11.2.1.7. Organisational process assets

11.2.2. Tools&Techniques

11.2.2.1. Expert judgement

11.2.2.2. Analogous estimating

11.2.2.3. Parametric estimating

11.2.2.4. Bottom-up estimating

11.2.2.5. Three-point estimating

11.2.2.6. Reserve analysis

11.2.2.7. Cost of quality

11.2.2.8. Project management software

11.2.2.9. Vendor bid analysis

11.2.2.10. Group decision-making techniques

11.2.3. Outputs

11.2.3.1. Activity cost estimates

11.2.3.2. Basis of estimates

11.2.3.3. Project documents updates

11.2.4. Predecessors

11.2.4.1. 5.4 Create WBS

11.2.4.2. 6.6 Develop schedule

11.2.4.3. 7.1 Plan cost management

11.2.4.4. 9.1 Plan human Resource Management

11.2.4.5. 11.2 Identify risks

11.2.5. Successors

11.2.5.1. 6.4 Estimate activity resources

11.2.5.2. 7.3 Determine budget

11.2.5.3. 11.2 Identify risks

11.2.5.4. 12.1 Plan Procurement management

11.3. 7.3 Determine budget

11.3.1. Inputs

11.3.1.1. Cost management plan

11.3.1.2. Scope baseline

11.3.1.3. Activity cost estimates

11.3.1.4. Basis of estimates

11.3.1.5. Project schedule

11.3.1.6. Resource calendar

11.3.1.7. Risk register

11.3.1.8. Agreements

11.3.1.9. Organisational process assets

11.3.2. Tools&Techniques

11.3.2.1. Cost aggregation

11.3.2.2. Reserve analysis

11.3.2.3. Expert judgement

11.3.2.4. Historical relationship

11.3.2.5. Funding limit reconciliation

11.3.3. Outputs

11.3.3.1. Cost baseline

11.3.3.2. Project funding requirements

11.3.3.3. Project documents updates

11.3.3.3.1. Risk register Activity cost estimates Project schedule ...

11.3.4. Predecessors

11.3.4.1. 5.4 Create WBS

11.3.4.2. 6.6 Develop schedule

11.3.4.3. 7.1 Plan Cost management

11.3.4.4. 7.2 Estimate costs

11.3.4.5. 9.2 Acquire project team

11.3.4.6. 11.2 Identify risks

11.3.4.7. 12.2 Conduct procurements

11.3.5. Successors

11.3.5.1. 4.2 Develop Project management plan

11.3.5.2. 7.4 Control Costs

11.4. 7.4 Control cost

11.4.1. Inputs

11.4.1.1. Project management plan

11.4.1.2. Project funding requirements

11.4.1.3. Work performance data

11.4.1.4. Organisational process assets

11.4.2. Tools&Techniques

11.4.2.1. Earned value management

11.4.2.2. Forecasting

11.4.2.3. To Complete performance index

11.4.2.4. Performance reviews

11.4.2.5. Project management software

11.4.2.6. Reserve analysis

11.4.3. Outputs

11.4.3.1. Work performance information

11.4.3.2. Cost forecasts

11.4.3.3. Change requests

11.4.3.4. Project management plan updates

11.4.3.5. Project documents updates

11.4.3.6. Organisational process assets updates

11.4.4. Predecessors

11.4.4.1. 4.2 Develop project management plan

11.4.4.2. 4.3 Direct and manage project work

11.4.4.3. 7.3 Determine budget

11.4.5. Successors

11.4.5.1. 4.4 Monitor and control project work

11.4.5.2. 4.5 Perform Integrated change control

12. 8 Quality

12.1. 8.1 Plan Quality management

12.1.1. Inputs

12.1.1.1. Project management plan

12.1.1.2. Stakeholder register

12.1.1.3. Risk register

12.1.1.4. Requirements documentation

12.1.1.5. Enterprise environmental factors

12.1.1.6. Organisational process assets

12.1.2. Tools&Techniques

12.1.2.1. Cost-benefit analysis

12.1.2.2. Cost of quality

12.1.2.3. Seven basic quality tools

12.1.2.4. Benchmarking

12.1.2.5. Design of experiments

12.1.2.6. Statistical sampling

12.1.2.7. Additional quality planning tools

12.1.2.8. Meetings

12.1.3. Outputs

12.1.3.1. Quality management plan

12.1.3.2. Process improvement plan

12.1.3.3. Quality metrics

12.1.3.4. Quality checklists

12.1.3.5. Project document updates

12.1.4. Predecessors

12.1.4.1. 4.2 Develop project management plan

12.1.4.2. 5.2 Collect requirements

12.1.4.3. 11.2 Identify risks

12.1.4.4. 13.1 Identify stakeholders

12.1.5. Successors

12.1.5.1. 8.2 Perform Quality assurance

12.1.5.2. 8.3 Control quality

12.1.5.3. 11.2 Identify risks

12.2. 8.2 Perform quality assurance

12.2.1. Inputs

12.2.1.1. Quality management plan

12.2.1.2. Process improvement plan

12.2.1.3. Quality metrics

12.2.1.4. Quality control measurements

12.2.1.5. Project documents

12.2.2. Tools&Techniques

12.2.2.1. Quality management and control tools

12.2.2.2. Quality audits

12.2.2.3. Process analysis

12.2.3. Outputs

12.2.3.1. Change requests

12.2.3.2. Project management plan updates

12.2.3.3. Project documents updates

12.2.3.4. Organisational process assets updates

12.2.4. Predecessors

12.2.4.1. 8.1 Plan quality management

12.2.4.2. 8.3 Control quality

12.2.5. Successors

12.2.5.1. 4.2 Develop project management plan

12.2.5.2. 4.5 Perform integrated change control

12.3. 8.3 Control quality

12.3.1. Inputs

12.3.1.1. Project management plan

12.3.1.2. Quality metrics

12.3.1.3. Quality checklists

12.3.1.4. Work performance data

12.3.1.5. Approved change requests

12.3.1.6. Deliverables

12.3.1.7. Project documents

12.3.1.8. Organisational process assets

12.3.2. Tools&Techniques

12.3.2.1. Seven basic quality tools

12.3.2.2. Statistical sampling

12.3.2.3. Inspection

12.3.2.4. Approved change request review

12.3.3. Outputs

12.3.3.1. Quality control measurements

12.3.3.2. Validated changes

12.3.3.3. Verified deliverables

12.3.3.4. Work performance information

12.3.3.5. Change requests

12.3.3.6. Project management plan updates

12.3.3.7. Project documents updates

12.3.3.8. Organisational process assets updates

12.3.4. Predecessors

12.3.4.1. 4.2 Develop project management plan

12.3.4.2. 4.3 Direct and manage project work

12.3.4.3. 4.5 Perform integrated change control

12.3.4.4. 8.1 Plan quality management

12.3.5. Successors

12.3.5.1. 4.2 Develop project management plan

12.3.5.2. 4.4 Monitor and control project work

12.3.5.3. 4.5 Perform Integrated change control

12.3.5.4. 5.5 Validate Scope

12.3.5.5. 8.2 Perform quality assurance