Machine and production lines installation of Al FAGR company.

Get Started. It's Free
or sign up with your email address
Machine and production lines installation of Al FAGR company. by Mind Map: Machine and production lines installation of Al FAGR company.

1. Electrical Installations

1.1. Prepare and design the electrical drawings and layouts

1.2. Installation of electrical cables for production lines

1.3. Purchase and Assembly of electrical components

2. Spare parts and main tools

2.1. Prepare and design the right spare parts store

2.2. Preparing a list for all important spare parts for startup

2.3. purchase of all important spare parts

3. Raw material and additives

3.1. Start up and testing the production

3.2. purchase all required raw materials and additives for the production

3.2.1. Mounting the spotlights at the specific places

3.3. Design and prepare raw material mixing station

3.4. Purchase the required mixing units

3.5. manufacturing the material silos and feeding systems

3.6. Assembly of all units

3.7. Testing the mixers

3.8. preparing the control room for mixing processes

4. Factory lightining

4.1. Factory lightening design

4.2. Ordering the required lights

5. Factory Workshop

5.1. Purchase all required tools and instruments

5.2. Purchase lathes, drilling units, Milling machine...etc

5.3. purchase all required materials and machining tools.

6. Production lines installation

6.1. Final factory components and tools checkup

6.2. design and preparing required production lines with the planned capacites

6.3. purchase the production line units

6.4. Assembly and Installation of all production lines

7. Legal Certifications

7.1. Design air station layout

7.2. Design the proper compressor type and Start ordering the required machines.

7.3. Installation of compressed air piplines

7.4. Proper installation of Air station compressors, dryers and tanks

8. water cooling station

8.1. building tanks for cold and drainage water

8.2. machining and welding the required pipes for pumps assembly

8.3. pumps purchase

8.4. Installation of chilled water and drainage pipelines

8.5. Ordering chillers.

8.6. Design and prepare cooling station area

8.7. Assembly of Chillers with the proper pipes for machine supply and drainage.

9. Overhead crane and forklifts

9.1. Steel structure final check up

9.2. Purchase the required overhead crane

9.3. Purchase of appropriate forklifts

10. Laboratory

10.1. Design and prepare lab. area

10.2. Purchase all required machins and testing units

10.3. Assembly Lab. machines

10.4. Testing the lab machines

11. Proposals

11.1. Production lines

11.2. Mixers, Silos and feeding system

11.3. Chillers and pumps

11.4. Compressors and dryes