1. Phase1

1.1. to rollback 6900 to Drop11HF1

1.2. to update 6900 (Drop12, Drop12 HF1, Drop13, Drop14)

1.3. Drop14 - manully check creation of 1 eng order (migrated, generic)

1.4. Drop14 - manually check 4 Homepages

1.5. (optional) Drop14 DAY 100%

1.6. (optional) Drop14 DAY 100% + WS5.1 DAY 100%

2. Phase2

2.1. Reports and Searches

2.1.1. Scripting optinal reports

2.1.2. Sql selectors for reports

2.2. Data Migration

2.2.1. 6830 in rollback (phase1 Drop11 hf1)

2.2.2. update 6830 to Phase2 Drop3 (Drop12, Drop12 HF1, Drop13, Phase2 Drop3)

2.2.3. Starting Data Migration SDB upload

2.2.4. Starting Data Migration

2.2.4.1. iteration 2.3

2.2.4.2. RDB replication

2.2.4.3. QA certification

2.2.4.4. rollback server

2.2.4.5. SDB Upload

2.2.4.6. iteration 2.4

2.2.4.7. RDB Replication

2.2.4.8. QA certification

2.2.4.9. rollback server

2.2.4.10. iteration 2.5

2.2.4.11. rollback server

2.2.4.12. iteration 2.6

2.3. DnR

2.3.1. Wait for Data Migration complete

2.3.2. Cisco instruction How-to

2.3.3. DnR Alcatel

2.3.4. Dnr Huawei CE

2.3.5. DnR Huawei DSLAM

2.3.6. DnR Juniper

2.3.7. DnR Cisco

2.3.8. Q1 - how to execute all DnR in parallel

2.3.9. Q2 - how to extract from Optus Lab?

2.4. Customer Orders

2.4.1. 6810 start Data Migration Phase1

2.4.2. 6810 start Data Migration Phase2

2.4.3. start scripting new CO

2.4.4. Install ITF WS1.2

2.4.5. Script manual UI scenarios

2.4.6. script Evolve Voice without stubs

2.4.7. Configure our interfaces to ITF 1.2

2.4.8. Unite all the scripts into DAY MIX

2.4.9. DAY MIX 100%

2.4.10. DAY MIX 120%

2.4.11. DAY MIX 150%

2.4.12. Durability DAY MIX

2.5. WS2.1 regression

2.5.1. Install ITF 2.1

2.5.2. configure our interfaces to ITF 2.1

2.5.3. Letter to 2.1 Team that we have no DN and DSL on server

2.5.4. smoke scenarios on our SVT server

2.5.5. QA ITF with scenarios - compare code of JMeter and ITF scenarios (fix the scenarios)

2.5.6. Find out mapping between ITF scenarios and our scenarios

2.5.7. DAY 2.1 regression

2.5.8. Day2.1 + DAY 1.2 regression

2.6. Integration with external systems

2.6.1. Define most critical adn heavy integrations

2.6.2. Demo eDesigner integration

2.6.3. Demo ONPS

2.6.4. script the integration ONPS

2.6.5. Demo NBN

2.6.6. Demo BUOS

2.6.7. Demo Activ8

2.6.8. Demo CASS

2.6.9. Demo CNUM