1. 1. Meeting- Olivia- 3 hrs/ $45
1.1. 1.1 Client Meeting- Olivia- 2 hrs/ $30
1.1.1. 1.1.1 Have meeting about budget- Olivia- 1
1.1.2. 1.1.2 Discuss expectations- Olivia- 1
1.2. 1.2 HOA- Connor- 1 hr/ $15
1.2.1. 1.2.1 Have HOA sign off on the building- Connor- 1
2. 2. Concrete Pad- Connor- 11 hrs/ $165
2.1. 2.1 Hole- Connor- 3 hrs/ $45
2.1.1. 2.1.1Measure and line hole- Olivia- 1
2.1.2. 2.1.2 Dig hole- Connor- 2
2.2. 2.2 Concrete mix- Olivia- 5 hrs/ $75
2.2.1. 2.2.1 Calulate how much concrete is needed- Oliva- 1
2.2.2. 2.2.2 Buy concrete- Olivia- 1
2.2.3. 2.2.3 Mix concrete- Connor- 1
2.2.4. 2.2.4 Pour concrete- Connor- 2
2.3. 2.3 Heating supplies- Connor- 3 hrs/ $45
2.3.1. 2.3.1 Measure area for heating pad- Olivia- 1
2.3.2. 2.3.2 order heated floor mat- Olivia- 1
2.3.3. 2.3.3 Install heated pad- Connor- 1
3. 3. Insulation- Connor- 4 hrs/ $60
3.1. 3.1.1 Measure out area needing to be insulated- Connor- 1
3.2. 3.1.2 Cut insulation to size- Connor- 1
3.3. 3.1.3 Install insulation- Connor- 2
4. 4. Electricity- Olivia- 6 hrs/ $90
4.1. 4.1 Wires- Olivia-
4.1.1. 4.1.1 Figure out power source- Olivia- 1
4.1.2. 4.1.2 Decide what wires are needed- Olivia-1
4.1.3. 4.1.3 Measure how many feet of wire are needed- Olivia- 1
4.1.4. 4.1.4 Order Wire- Olivia- 1
4.1.5. 4.1.5 Install Wires- Connor- 2
5. 5. Structure- Connor- 16 hrs / $240
5.1. 5.1 Windows- Connor- 4 hrs/ $60
5.1.1. 5.1.1 Take measurements- Olivia- 1
5.1.2. 5.1.2 Learn how to install windows- Connor- 1
5.1.3. 5.1.3 Install windows- Connor- 2
5.2. 5.2 Door- Connor- 4 hrs/ $60
5.2.1. 5.2.1 Take measurements- Olivia- 1
5.2.2. 5.2.2 learn how to install door- Connor- 1
5.2.3. 5.2.3 install door- Connor- 2
5.3. 5.3 Door flap- Olivia- 3 hrs/ $45
5.3.1. 5.3.1 Take measurements- Olivia- 1
5.3.2. 5.3.2 learn how to install flap- Connor- 1
5.3.3. 5.3.3 install flap- Connor- 1
5.4. 5.4 Wood- Connor- 5 hrs/ $75
5.4.1. 5.4.1 Calculate how much wood- Olivia- 1
5.4.2. 5.4.2 Build frame- Connor- 4