SIZE AND RATE HORIZONTAL 3-PHASE SEPARATORS

Get Started. It's Free
or sign up with your email address
SIZE AND RATE HORIZONTAL 3-PHASE SEPARATORS by Mind Map: SIZE AND RATE HORIZONTAL 3-PHASE SEPARATORS

1. SIZING

1.1. CAN BE LONG

1.1.1. L

1.2. CAN BE SHORT

1.3. DIAMETER RATIO

1.3.1. 2/5

2. VAPOUR AREA

2.1. TO ENSURE ADEQUATE VAPOR AREA EXISTS

2.2. FLOWRATES OCCURS IN HORIZONTAL DIRECTIONS

2.2.1. IT MUST BE CALCULATED

2.2.1.1. INTO CONSIDERATION THE LENGTH OF THE VESSEL

2.2.1.2. APPLIES A DE-RATING FACTOR

2.2.1.2.1. TO RELATE THE TERMINAL VELOCITY TO HORIZONTAL FLOW

3. RESIDENCE TIME

3.1. THE TIME THAT LIQUID STAYS IN THE VESSELS

3.2. CONSIDERATION WHEN SPECIFYING RESIDENCE TIME

3.2.1. OIL SETTING TIME

3.2.1.1. TO ALLOW ADEQUATE WATER REMOVAL FROM THE OIL

3.2.2. WATER SETTLING TIME

3.2.2.1. TO ALLOW ADEQUATE OIL REMOVAL FROM THE WATER

3.3. RESIDENCE TIMES FOR LIQUID-LIQUID SEPARATION ARE GENERALLY THE LIMITING FACTOR IN SELECTING LEVEL SETTINGS

4. WEIR HEIGHT AND POSITION

4.1. IMPORTANT CONSIDERATION TO ACHIEVE THE BEST SEPARATION

4.2. PREVENTS WATER FROM ENTERING OIL STREAMS

4.3. WATER LAYER OF AN OIL DROPLET CAN BE CALCULATED

5. LIQUID INTERFACE LEVEL

5.1. WITH WEIR HEIGHT KNOWN HIGH INTERFACE LEVEL CAN BE SET

5.1.1. TYPICALLY 100MM BELOW WEIR

5.2. USING TERMINAL VELOCITIES

5.2.1. THE RISE OF OIL LAYER CAN BE CALCULATED TOO!

6. SURGE VOLUMES

6.1. A PROCESS UPSET USUALLY CAUSED BY A LIQUID SLUG INTO THE VESSEL

7. NOZZLE SIZING

7.1. IT IS IMPORTANT TO PREVENT EXCESSIVE MOMENTUM FROM DISRUPTING SEPARATIOM

7.2. HAVE AT LEAST THE SAME DIAMETER AS THE CONNECTING LINE

8. THEORY

8.1. BASED ON UNDERLYING BASIC PHYSIC

8.1.1. GRAVITY!

8.2. LIQUID EMULSION

8.2.1. HEATING IS USED

9. INTRO

9.1. IS A KEY UNIT IN ACHIEVING THE REQUIRED EXPORT SPECIFICATION IN AN OIL AND GAS PROCESS

10. SETUP

10.1. TO UNDERSTAND THE SETUP OF SEPARATOR

10.2. AS AN ENGINEER

10.2.1. AWARE OF THE VESSEL SETTING

10.2.1.1. VESSEL

10.2.1.1.1. LANHH (HIGH LIQUID LEVEL TRIP)

10.2.1.1.2. LAH (HIGH LIQUID LEVEL ALARM)

10.2.1.1.3. NLL (NORMAL LIQUID LEVEL)

10.2.1.1.4. LAL (LOW LIQUID LEVEL ALARM)

10.3. STEPS TO SET-UP

10.3.1. 1. VESSELS

10.3.2. 2. SIZING

10.3.3. 4. RESIDENCE TIMES

10.3.4. 3.VAPOR AREA

10.3.5. 5. WEIR WEIGHT AND POSITION

10.3.6. 6. LIQUID INTERFACE LEVEL

10.3.7. 7. SURGE VOLUME

10.3.8. 8. NOZZLE SIZING

11. OPTIMIZATION

11.1. ISSUES WITH SIZING

11.1.1. NUMBER OF CRITERIA THAT MUST BE MET TO ENSURE CORRECT SEPATION

11.1.2. PREVENT OVERSIZING THE VESSEL

11.1.3. VARIABLES SHOULD BE ALTERED

11.1.3.1. DIAMETER

11.1.3.2. LENGTH

11.1.3.3. WEIR POSITION

11.1.3.4. LEVEL SETTING

11.2. ENGINEER USE TOOLS

11.2.1. MSExcel

11.2.1.1. OPTIMISES DIMENSIONS