Hydro Project
저자: Zhi Xiong Lee
1. 1.0 Control
1.1. 1.1Supervision
2. 3.0 Engineers
2.1. 3.1 On site
2.2. 3.2 Office
3. 5.0 Time Keeper
3.1. 5.1 Plan timetable
3.2. 5.2 Ensure time table is followed
3.3. 5.3 Ensure completion of project
4. 2.0 Design
4.1. 2.1 Brainstorm for design
4.2. 2.2 Selection of design
4.3. 2.3 Finalize design
5. 4.0 Contractor
5.1. 4.1 Source
5.2. 4.2 Get a Quote
5.3. 4.3 Comfirm
6. 6.0 Logistics
6.1. 6.1 Comfirm
6.2. 6.2 Purchase
6.3. 6.3 Transport