AT-01 [pre.design]

시작하기. 무료입니다
또는 회원 가입 e메일 주소
AT-01 [pre.design] 저자: Mind Map: AT-01 [pre.design]

1. AT-01 [pre.design]

1.1. general

1.1.1. timely

1.1.1.1. Follow Schedule

1.1.1.2. Studio Sessions

1.1.1.3. Submitted

1.1.2. Authentication

1.1.2.1. Regular Presentations

1.1.2.2. Referenced

1.1.3. Communication

1.1.3.1. Graphic

1.1.3.1.1. Industry Standard

1.1.3.2. Written

1.1.3.2.1. Prepare Documentation

1.1.3.2.2. Produce Drawings

1.1.3.3. Verbal

1.1.3.3.1. Studio Interaction

1.1.4. Teamwork (min 2 - max 4)

1.1.4.1. Allocate tasks

1.1.4.2. Share Load

1.1.4.3. Resolve Issues

1.1.4.4. Compile Analyse Present

1.1.5. Technology

1.1.5.1. Engage online

1.1.5.1.1. Canvas Discussions

1.1.5.1.2. Collab. Ultra

1.1.5.1.3. BIM Studio Attendance

1.1.5.1.4. Digital Workflow

1.1.6. OHS

1.1.6.1. Workstation

1.1.6.1.1. Lighting

1.2. part A [brief]

1.2.1. client

1.2.1.1. History

1.2.1.2. Values

1.2.1.3. Aspirations

1.2.1.4. Built [Precedents]

1.2.2. [action]

1.2.2.1. Email Prelim. Brief

1.3. part B [brief]

1.3.1. program

1.3.1.1. overview [objectives]

1.3.1.2. Space Data Sheets

1.3.1.2.1. Space Data Sheets

1.3.1.3. Area Analysis

1.3.1.3.1. diagram

1.3.1.3.2. Tabulate

1.3.2. Regulatory Controls

1.3.2.1. NCC

1.3.2.1.1. Classification

1.3.2.1.2. No. of Storeys

1.3.2.1.3. Number of Occupants

1.3.2.1.4. Health & Amenity

1.3.2.1.5. Access & Egress

1.3.2.2. Construction Type

1.3.2.3. ESD

1.3.2.3.1. BESS

1.3.2.3.2. City of Melbourne 22.19

1.3.2.3.3. RMIT Sustainability Policy

1.3.2.3.4. City of Melbourne ESD Statement

1.3.2.4. Planning Scheme Overlays

1.4. part D [fea$ibility]

1.4.1. Report: Proposal

1.4.1.1. diagram

1.4.1.2. Written Project expectations

1.4.1.3. Section Studies

1.5. part e [gantt chart]

1.5.1. AT-01 [pre.design]

1.5.2. AT-02 [major.project]

1.5.2.1. design

1.5.2.1.1. concept design

1.5.2.1.2. finalise design

1.5.2.2. contract document

1.5.2.3. admininstration

1.5.2.3.1. costings

1.5.2.4. presentation

1.5.3. Delegate Tasks

1.5.4. Validate Individual Assessments

2. part C [site analysis]

2.1. Locality Plan

2.2. Precinct Description

2.2.1. Landmarks

2.3. Site Descriptors

2.3.1. Address

2.3.2. Property Report

2.4. Neighbourhood Character Analysis

2.5. History

2.5.1. Change over time

2.6. Contours

2.7. Services

2.8. Existing shadow diagrams

2.9. Streetscapes

2.10. Site Sections

2.11. Material Palettes

2.12. Photo study

2.13. Urban elements

2.13.1. Parking

2.13.2. Planting

3. AT-02 [major.project]

3.1. Concept Design

3.1.1. Initial Ideas (typically less digital)

3.1.1.1. Concept Collage

3.1.1.2. Design Statement

3.1.1.3. Form Studies

3.1.1.4. Model Making

3.1.1.5. Sketches

3.1.2. Schematic Design (Illustrative)

3.1.2.1. Concept $ign off (Client)

3.1.2.1.1. Plans

3.1.2.1.2. Elevations

3.1.2.1.3. 3D Views

3.2. Finalise Design

3.2.1. Reader: Town Planner

3.2.2. As per T.P. Checklist

3.3. Contract Documentation

3.3.1. Plans

3.3.1.1. Site Plan

3.3.1.2. Ground Floor Plan

3.3.1.3. 1st Floor Plan

3.3.1.4. 2nd Floor Plan

3.3.1.5. 3rd Floor Plan

3.3.1.6. Roof Plan

3.3.1.7. Reflected Ceiling Plan

3.3.2. Elevations

3.3.2.1. North

3.3.2.2. South

3.3.2.3. East

3.3.2.4. West

3.3.3. Sections

3.3.3.1. Typical Section 1:100

3.3.3.2. Detail Section 1:50

3.3.3.2.1. Ground - First Floor (Principal Entry)

3.3.4. Details

3.3.4.1. Construction Details (1:20 U.N.O.)

3.3.4.1.1. Detail #1 Roof-Drainage-Handrail 1:20

3.3.4.1.2. Detail #2 Window/ Wall Cladding Detail

3.3.4.1.3. Detail #3

3.3.4.1.4. Detail #4 Entry Door (1:10)

3.3.4.1.5. Detail #5 Green Roof Detail (1:20)

3.3.4.1.6. Detail #6 Facade Detail

3.3.4.2. Joinery Details

3.3.4.2.1. Plan 1:20

3.3.4.2.2. Elevation/Sec. #1 (1:20)

3.3.4.2.3. Elevation/Sec. #2 (1:20)

3.4. Admin.

3.4.1. Costings

3.4.1.1. The fitout of the Building

3.4.1.1.1. FF+E Schedule

3.4.1.1.2. Prime Cost Sum

3.4.1.2. Building Construction Costs

3.4.1.2.1. Gross M2

3.4.1.2.2. Precedent

3.4.1.3. Total Project Costs

3.4.1.3.1. Estimated Construction (main contract cost)

3.4.1.3.2. Estimated fit out costs, (if not included in above).

3.4.1.3.3. Contingency costs

3.4.1.3.4. Demolition costs (if any)

3.4.1.3.5. Provisional sums (if any) to be let as separate contracts

3.4.1.3.6. Cost of Surveys/ reports

3.4.1.3.7. Statutory Charges

3.4.1.3.8. Professional Consultant Fees

3.4.1.3.9. Legal Costs

3.4.1.3.10. Accountancy Costs

3.4.1.3.11. Additional Costs can include

3.4.2. Time Sheets

3.4.2.1. Employees

3.4.2.2. Monthly Project Financial Summary Reports

3.4.2.2.1. Track costs to estimated budget (+contingency).

3.4.3. Gantt Chart