Project Management Process

Project Control, Project Closing, Timeline template

시작하기. 무료입니다
또는 회원 가입 e메일 주소
Project Management Process 저자: Mind Map: Project Management Process

1. A

1.1. Isambard Kingdom Brunel

1.1.1. Worked in

1.1.1.1. Shipping

1.1.1.2. Bridge-building

1.1.1.3. Railway construction

1.1.2. Driving

1.1.2.1. Ambitious projects

1.2. Industrial Revolution in Britain

1.2.1. Small group of construction engineers

1.2.2. Changes

1.2.2.1. Social

1.2.2.2. Economic

2. B

2.1. Pupil of his father

2.1.1. Building of the Thames Tunnel

2.1.2. He became the engineer in charge of the project with twenty years old

2.2. Pupil of his father Brunel

2.2.1. Building of the Thames Tunnel

2.2.2. became the engineer in charge of the project with twenty years old

2.2.3. the proyect of the Thames suffered two times big desasters

2.2.3.1. Brunel was seriously injured

3. C

3.1. Brunel was in the bridge design competition

3.1.1. Brunel’s design was accepted on the second try

3.1.2. The Brunel’s project was abandoned in 1843

3.1.3. Begin work on the project again after Brunel’s death

3.2. In 1864

3.2.1. Bridge (Clifton Suspension Bridge) was finally completed

3.2.2. Originally intended only for horse-drawn traffic

3.2.3. Now bears over four million motor vehicles a year