Project Decision-Making Process

시작하기. 무료입니다
또는 회원 가입 e메일 주소
Project Decision-Making Process 저자: Mind Map: Project Decision-Making Process

1. FINANCIAL ANALYSIS

1.1. Cost management methods

1.1.1. Ensure that the design is consistent with the budget

1.2. Prelimenary construction cost

1.2.1. Construction Budget

1.2.1.1. Materials

1.2.1.2. Plants

1.2.1.3. Labours

1.2.1.4. Construction method

1.2.1.5. Construction period

1.2.2. Other Costs

1.2.2.1. Professional Fee

1.2.2.2. Statutory Fee

1.2.2.3. Inspection Fee

1.2.2.4. Contingency/Insurance

1.2.3. Price Adjustment

2. BUILT ABILITY

2.1. CONSTRUCTION METHOD

2.1.1. Modular pre-fabricated construction method

2.1.1.1. Modulated panels

2.1.1.2. Modulated frames

2.1.2. BIM collaborative method

2.2. Construction stages

2.2.1. Construction (installation)

2.2.1.1. Pre-construction

2.2.1.1.1. Site inspection

2.2.1.1.2. Schedule plan

2.2.1.1.3. Modular fabricate panels

2.2.1.1.4. Testing of curtain walls

2.2.1.1.5. Site preparation

2.2.1.1.6. Transportation

2.2.1.1.7. Handle and storage

2.2.1.2. Anchorage and connection provision

2.2.1.3. Installation arrangement

2.2.1.4. Final fixing for safety

2.2.2. Post-construction

2.2.2.1. Inspection

2.2.2.2. Project delivery

2.2.2.3. Maintenance

2.3. Schedule Arrangement Plan

2.4. Risk Assessment

2.4.1. Site Risks

2.4.2. Time Risks

2.4.3. Cost Risks

2.4.4. Quality Risks

2.5. Environmental Implication

3. DESIGN DEVELOPMENT

3.1. FEASIBILITY STUDY

3.1.1. Client's needs & expectations

3.1.1.1. Good visual access

3.1.1.2. Comfort Working Spaces

3.1.1.3. Cost economy

3.1.1.4. Modern,a state-of-the-art appearance

3.1.1.5. Environmental friendly

3.1.1.6. employee's health and well-being

3.1.2. Schematic design

3.1.3. Environmental impacts

3.1.4. Environmental issues

3.2. BASIC DESIGN CONSIDERATION

3.2.1. Integration of facade structures

3.2.2. Provision of tolerances

3.2.3. Build ability

3.2.4. Weathering resistance

3.3. ADDITIONAL DESIGN CONSIDERATIONS

3.3.1. INSULATION TREATMENT

3.3.1.1. Sound insulation

3.3.1.2. Thermal insulation

3.3.1.3. Water impermeability

3.3.1.4. Sun Light adjustment devices

3.3.1.5. The moisture control

3.3.1.6. Heat treatment

4. RESOURCE IDENTIFIED

4.1. Local materials & Services & Manufactories

4.2. Locally skilled -human resources

4.3. Equipment & Tools

5. PROJECT ENVIRONMENTAL IDENTIFICATION

5.1. Site location and Layout

5.2. Weather

5.2.1. The moisture

5.2.2. The wind pressure

5.2.3. The rain

5.2.4. The noice

5.2.5. The light