Decrease equipment downtime by 10% during maintenance
создатель Ben Nichols

1. Produce high-quality maintenance documentation
1.1. Include Detailed Book Outline with all removal and replacement procedures
1.2. List required tools needed to perform each R&R procedure
1.3. Simplify each step in a procedure (one action per step)
1.4. Include a figure for each step or one figure for a group of steps (figure must have applicable callouts)
2. Higher-quality hands-on training
2.1. Talk with SMEs to determine frequent repairable equipment
2.1.1. Create a Detailed Book Outline (DBO) of only equipment that is most often repaired
2.2. Use a blended-learning approach to training
2.2.1. eLearning modules
2.2.1.1. Level 1: Material that informs, rather than teach - Introductions - Safety
2.2.1.2. Level 2: Material that teaches - Equipment Description - Functional Specification - Theory of Operations
2.2.2. Instructor Led Training (ILT)
2.2.2.1. In class instruction (lecture)
2.2.2.1.1. Level 3: Material that instructs learners to perform a certain task - Preventive Maintenance - Removal and Replacement - Electrical Maintenance - Troubleshooting
2.2.2.2. Hands-on training (at equipment)
2.2.2.2.1. Demonstration
2.2.2.2.2. Performance
2.2.2.2.3. Evaluation