1. Equipment Performance
1.1. Downtime
1.1.1. Number of breakdowns
1.1.1.1. Per model
1.1.1.2. Per failure mode
1.2. Maintenance Cost
1.2.1. Maintenance cost per usage
1.2.2. Top maintenance items per cost
1.2.3. Overtime costs
1.2.4. Stock holding costs
1.3. Maintainability
1.3.1. Use to assess overall repair system
1.3.1.1. Travel time
1.3.1.2. Logistics
1.3.1.2.1. Spares availability
1.3.1.2.2. Spares holding location
1.3.1.2.3. Spare transport
1.3.1.2.4. Spare acquisition processes
1.3.1.2.5. Waiting locations for repair team
1.3.1.2.6. Staffing configuration
1.3.1.3. Communication
1.3.1.3.1. Common failure procedure
1.4. Overall Equipment Effectiveness
1.4.1. Availability
1.4.2. Performance rate
1.4.2.1. % of work rate compared to design rate
1.4.3. Quality
1.4.3.1. Rejection rate
2. Parts
3. Task efficiency
3.1. Task completed on time
3.1.1. Planned vs Emergent ratio
3.1.2. Planned Maintenance as portion of all time used
3.2. Task backlog
3.2.1. Man-hour needed
3.2.2. Number of tasks
3.3. Mean repair time
3.3.1. Used to asses skill
3.3.1.1. Diagnostics skills
3.3.1.2. Job dexterity
3.3.1.3. Supervision
3.3.1.3.1. Task prioritization
3.3.1.3.2. Labour planning
4. People Performance
4.1. Service Teams
4.1.1. Reliability
4.1.1.1. Mean time before failure
4.1.1.2. Median time to failure
4.1.1.3. Dimensions
4.1.1.3.1. Per artisan
4.1.1.3.2. Per machine
4.1.1.3.3. Per system
4.1.1.3.4. Per supervisor
4.1.1.3.5. Per function code