Optimize Working Capital
作者:Michael Bruxmeier
1. Process Rejected Material
1.1. Label
1.2. Report in ERP
1.3. Separate and protected area
1.4. Time limits to solve issue
2. Improve Process reliability
2.1. Technical availibilty
2.2. Quick Response Quality Control
3. Material Flow
3.1. Visualize all material flow situations
3.2. Value Stream Mapping
3.3. Time study
4. Capacity Plan
4.1. 12 months rolling Sales plan
4.2. Inhouse Capacity Plan
4.3. Vendor Capacity Plan
5. Logistic KPI
5.1. Inventory turns
5.2. Material Flow efficiency
5.3. Warehouse utilization
5.4. Internal logistic costs
5.5. External logistic costs
6. Material Planning
6.1. Reduce planning cycles
6.2. 12 month rolling plan horizon
6.3. EDI to and from all suppliers
6.4. Direct shipments
7. Production Planning
7.1. 10 day rolling production plan
7.2. Production order process
7.3. Scrap reporting
8. Inventory Control
8.1. Perpetual inventory
8.2. Labels on all boxes
8.2.1. Text
8.2.2. Barcode
8.2.3. RFID