Project Management Process

Project Control, Project Closing, Timeline template

马上开始. 它是免费的哦
注册 使用您的电邮地址
Project Management Process 作者: Mind Map: Project Management Process

1. A

1.1. Isambard Kingdom Brunel

1.1.1. Worked in

1.1.1.1. Shipping

1.1.1.2. Bridge-building

1.1.1.3. Railway construction

1.1.2. Driving

1.1.2.1. Ambitious projects

1.2. Industrial Revolution in Britain

1.2.1. Small group of construction engineers

1.2.2. Changes

1.2.2.1. Social

1.2.2.2. Economic

2. B

2.1. Pupil of his father

2.1.1. Building of the Thames Tunnel

2.1.2. He became the engineer in charge of the project with twenty years old

2.2. Pupil of his father Brunel

2.2.1. Building of the Thames Tunnel

2.2.2. became the engineer in charge of the project with twenty years old

2.2.3. the proyect of the Thames suffered two times big desasters

2.2.3.1. Brunel was seriously injured

3. C

3.1. Brunel was in the bridge design competition

3.1.1. Brunel’s design was accepted on the second try

3.1.2. The Brunel’s project was abandoned in 1843

3.1.3. Begin work on the project again after Brunel’s death

3.2. In 1864

3.2.1. Bridge (Clifton Suspension Bridge) was finally completed

3.2.2. Originally intended only for horse-drawn traffic

3.2.3. Now bears over four million motor vehicles a year