job
por Jesse Durant
1. Build stairs
1.1. Fireplaces or any extra add ons for basement or other floors
1.1.1. Cut spots for plumbing and electrical
1.1.1.1. Build inner walls for all rooms and areas
2. Set trusses
2.1. Nail down and make rat runs to keep trusses in place
2.1.1. Put down roofing sheets
2.1.1.1. Make hangover for outside of house/structure.
2.1.1.1.1. cut out ventilation holes in roof plywood
3. Build walls
3.1. Lift walls
3.1.1. nail them or strap them to base of house
3.1.1.1. Put wall plywood sheeting
4. Lay down flooring sheets for second floor on top of walls.
4.1. Build walls for second floor
4.1.1. Measure distance to mark spots for trusses
4.1.2. build enclosed walls and rooms