Using BIM to Validate Progress if Works on Site against Claimed Application for Payment

Jetzt loslegen. Gratis!
oder registrieren mit Ihrer E-Mail-Adresse
Using BIM to Validate Progress if Works on Site against Claimed Application for Payment von Mind Map: Using BIM to Validate Progress if Works on Site against Claimed Application for Payment

1. Contract Provision NEC/JCT BIM UK framework

1.1. Communication

1.2. Accepted Programme

1.3. Payment Application

1.4. X10 Clause

2. BIM Contract Provision for Implementation

2.1. ISO19650

2.2. BIM Execution Plan

3. Implementation

3.1. L1 Basic BIM application, coordination and presentation, Revit and Navisworks Demonstration

3.1.1. a

3.2. L2 Amalgamate Actual Reality HoloBuilder

3.2.1. b

3.3. Incorporate BIM into Programme PowerProject BIM demonsttration

3.3.1. c

3.4. BIM Collaborate Pro All-in-One Platform

3.4.1. Notification

3.4.2. Certification

3.4.3. Acceptance of Design

4. information challenges

5. Asset durability, asset, delivery

6. UK BIM govern by HGM

7. BIM Build Safety Act require building info golden of information 8644

8. BS EN 19650

8.1. Business Process Model and Notation (BPMN)

9. BS EN 19650

10. Road Map for BIM Implementation

11. Stage 1 Organisation Requirement

12. UK BIM Framework

13. PointCloudGIS&BIM

13.1. Topo

13.2. ReviewDesignVisual

13.2.1. AdjointEnvironment

13.2.1.1. flood

13.2.1.2. noise

13.2.1.3. visual

13.2.2. BallparkFigureWithSupporting

14. Coordination

15. DetailCostControl

15.1. NavisworkSchedule

16. 4D Programme

16.1. Picking up the missing item

16.2. deeper understanding of the project plan

16.3. virtual representative of the construction process

16.4. Increase collaboration within the team, which have an impact on error and risk reduction

17. What is BIM

17.1. Level of Details

18. Why BIM

18.1. need better of information, what is better

18.2. benefit of beam

19. Public Sector

19.1. be require to do after 2016

19.2. BIM mandate all infrasture

20. Private

20.1. Save time

20.2. more efficient

20.3. drive cost down

20.4. long time deliver

20.5. asset capture

21. Run

21.1. Defined

21.2. utilise

22. Information Enabler

23. Design Change

24. BIM101 BIM methodology

25. Stage 4 BIM Execution Plan

26. Stage 2 Project Information Requirement

27. Delivery Milestone

28. Information Standard

29. Information Exchange Format

30. Level of Information Needed

31. Common Data Environment

32. Stage 3 Exchange Information Requirement

33. BPMN and procedure model

34. BIM Project Execution Planning