Design and Analysis of Analog Optimisation Circuits Work Breakdown Structure

Jetzt loslegen. Gratis!
oder registrieren mit Ihrer E-Mail-Adresse
Design and Analysis of Analog Optimisation Circuits Work Breakdown Structure von Mind Map: Design and Analysis of Analog Optimisation Circuits Work Breakdown Structure

1. Requirements

1.1. Product Research

1.1.1. Defining Optimisation problems

1.1.1.1. What is an optimisation problem

1.1.1.2. How is an optimisation problem defined

1.1.1.3. When can an Optimisation problem be solved

1.1.1.4. How do the KKT conditions underpin the above

1.1.2. Common optimisation problems that occur from MPC aplications

1.1.3. Repeat results from a paper by Sergey Vichick and Francesco Borelli

1.2. Technical Skills Training

1.2.1. Soldering

1.2.2. Programming

2. Design

2.1. Software

2.1.1. Circuit Design

2.1.1.1. Simulations Using LT spice and Matlab

2.1.1.2. Final schematic and PCB design in Altium

2.1.2. User Interface

2.1.2.1. Demo software in Matlab

2.1.2.2. Final software in Java

2.2. Hardware

2.2.1. Selection of appropriate throughhole Components

2.2.2. Selection of appropriate SMD components

2.2.3. Viability of using tracks as resistances

3. Construction

3.1. Breadboard

3.1.1. Throughhole Component building

3.2. Printed Circuit Boards

3.2.1. SMD component soldering

4. Testing

4.1. Product Testing

4.1.1. Specifications

4.1.1.1. Power Loss

4.1.1.2. Speed

4.1.2. Trial Applications

4.1.2.1. Use for least squares tracking controller

4.2. Marketability Testing

4.2.1. Robustness of Controller for MPC applications