ISTQB Advanced Test Analyst 5. Reviews

Jetzt loslegen. Gratis!
oder registrieren mit Ihrer E-Mail-Adresse
ISTQB Advanced Test Analyst 5. Reviews von Mind Map: ISTQB Advanced Test Analyst 5. Reviews

1. Audits

1.1. The most formal of the review types

1.2. The least effective at finding defects

1.3. Conducted by independent group(external engagement) with lead auditor

1.4. Auditing team...

1.4.1. determines compliance with specified expectations

1.4.2. perform interviews, observation, exam available documents

1.5. result in...

1.5.1. recommendations for change

1.5.2. list of corrective actions

1.5.3. pass/fail assessment

2. Contractual Reviews

2.1. are associated with a particular contract milestone and conducted to verify adherence to the contract criteria

2.2. Include a management review

2.3. Involve managers, customers, and technical staff working on the project

2.4. Frequently used on large systems or safety-critical systems

3. Requirements Reviews

3.1. Provide one of the highest ROI

3.2. Maybe an informal walkthrough, a technical review, or a formal inspection

3.3. Participants should include all project stakeholders

4. Design Reviews (DR)

4.1. DR are usually technical reviews or formal inspections between peers

4.2. Customers and users may be included

4.3. Reviewers must have technical knowledge

5. Acceptance/Qualification Reviews

5.1. Used to obtain management approval for the system that has been or is still being developed

5.2. Conducted as management reviews or audit

6. Operational Readiness Review

6.1. Done prior to deployment

6.2. includes the review of operational procedures such as backups and other capabilities of the product

7. Informal Reviews

7.1. Conducted by author and selected set of reviewers

7.2. Participants go through the doc and suggest improvements

7.3. Author make notes and responsible for making the changes

7.4. Pros and Cons

7.4.1. Most commonly used & Fast & Effective

7.4.2. Metricts gathered rarely and contribution to process improvement is small

8. Walkthroughs

8.1. Author is leading the discussion

8.2. Author make notes and responsible for making the changes

8.3. Metrics are usually not tracked

9. Technical Reviews

9.1. Conducted by technically oriented reviewers

9.2. May include a moderator

10. Inspections

10.1. Most formal type of INTERNAL reviews

10.2. Reviewers must be prepared before

10.3. A moderator is running the review and present the work item

10.4. A scribe records the notes

10.5. A reader is involved sometimes

10.6. Reviewers may be assigned to a type of defect(e.g. security, performance) to look for

10.7. Metrics are mandatory

10.7.1. Number of defects found

10.7.2. Types of defects

10.7.3. Issues to be considered for process improvement

11. Management Reviews

11.1. Used to ...

11.1.1. Review the project or it's parts to assess the progress

11.1.2. Get the status

11.1.3. Verify deviations from plans

11.1.4. Review project risks and mitigation plans

11.2. Conducted ...

11.2.1. By or for managers that directly responsible for the project

11.2.2. In some cases, stakeholders or upper management

11.3. Produces a list of action items

12. 6 Phases for Formal Review

12.1. 1. Planning

12.1.1. Training the reviewers

12.1.2. Getting management support

12.2. 2. Kick-off

12.2.1. Having the initial meeting

12.3. 3. Individual Preparation

12.3.1. Read the work product and prepare comments

12.4. 4. Review Meeting

12.4.1. Conducting actual meeting

12.5. 5. Rework

12.5.1. Changes should be made by author

12.6. 6. Follow-up

12.6.1. Re-review if required

12.6.2. Gathering suggestions for improvement