Building a Solar Vehicle Work Breakdown Structure
par Stakeholder Map
1. 1. Orientation
1.1. Building WBS
1.2. Choosing subject
1.3. Developing Gantt Chart
1.4. Writing cooperation contract
1.5. Writing POA
2. 2. Analyzing phase
2.1. Brainstorming
2.2. Research
2.2.1. Surfing the internet
2.2.2. Contact coach
2.2.3. Visiting libraries
3. 3. Development phase
3.1. Engineering
3.1.1. Case SSV part 1 (Building SSV)
3.1.1.1. Calculations
3.1.1.2. Sankey diagram
3.1.2. Case Simulink
3.1.2.1. Simulation of SSV
3.1.3. Case SSV part 2
3.1.3.1. Calculation (shaft)
3.1.3.2. SSV test
3.1.3.3. 2D technical drawing
3.1.3.4. Sankey diagram of Umicar
4. 4. Implementation
4.1. Enterprising
4.1.1. Budget management
4.1.2. Market position
4.2. Education
4.2.1. Process report
4.2.2. Solution report