1. Operations
1.1. DNO
1.1.1. Moolart Well
1.1.1.1. Mining
1.1.1.1.1. Buckingham
1.1.1.1.2. Blenheim
1.1.1.2. TSF
1.1.1.2.1. TSF3
1.1.2. Dogbolter/Coopers
1.1.2.1. Mining
1.1.2.1.1. Water storage development
1.1.3. Gloster
1.1.3.1. Mining
1.1.4. Petra
1.1.4.1. Ceased
1.2. DSO
1.2.1. Garden Well
1.2.1.1. Mining
1.2.1.1.1. Open Pit
1.2.1.1.2. Underground
1.2.1.2. TSF
1.2.1.2.1. TSF3
1.2.2. Rosemont
1.2.2.1. Mining
1.2.2.1.1. Open Pit
1.2.2.1.2. Underground
1.2.3. Tooheys Well
1.2.3.1. Mining
1.2.4. Baneygo/Idaho
1.2.4.1. Mining
1.2.5. Erlistoun
1.2.5.1. Ceased
1.2.6. Ben Hur
1.2.6.1. Mining
1.2.6.1.1. Hydrogeological Review
2. Colour Legend
3. Works proposed
4. Operations ceased
5. Works not proposed
6. PO Issued
7. Colour Legend
8. Completed works
9. Proposed works
10. Project Development: i) Regis ii) DMIRS iii) DWER
10.1. Priority 1
10.1.1. Ben Hur
10.1.1.1. Desk-based investigation
10.1.1.1.1. HAR
10.1.1.2. Site-based investigation
10.1.1.2.1. Phase 1
10.1.1.2.2. Phase 2
10.1.1.2.3. Phase 3
10.1.1.2.4. Phase 4
10.1.1.3. Analysis
10.1.1.3.1. Groundwater Model (SS)
10.1.1.3.2. Licensing
10.1.1.4. Operational recommendations
10.1.1.4.1. Permanent water distribution infrastructure
10.1.1.4.2. Horizontal drilling
10.1.1.4.3. In-pit water distribution infrastructure
10.1.2. Russell's Find
10.1.2.1. Desk-based investigation
10.1.2.1.1. HAR
10.1.2.2. Site-based investigation
10.1.2.2.1. Phase 1
10.1.2.2.2. Phase 2
10.1.2.2.3. Phase 3
10.1.2.2.4. Phase 4
10.1.2.3. Analysis
10.1.2.3.1. Groundwater Model (SS)
10.1.2.3.2. Groundwater Model (TR)
10.1.2.3.3. Licensing
10.1.2.4. Operational recommendations
10.1.2.4.1. Permanent water distribution infrastructure
10.1.2.4.2. Horizontal drilling
10.1.2.4.3. In-pit water distribution infrastructure
10.2. Priority 2
10.2.1. King Of Creation
10.2.1.1. Desk-based investigation
10.2.1.1.1. HAR
10.2.1.2. Site-based investigation
10.2.1.2.1. Phase 1
10.2.1.2.2. Phase 2
10.2.1.2.3. Phase 3
10.2.1.2.4. Phase 4
10.2.1.3. Analysis
10.2.1.3.1. Groundwater Model (SS)
10.2.1.3.2. Groundwater Model (TR)
10.2.1.3.3. Licensing
10.2.1.4. Operational recommendations
10.2.1.4.1. Permanent water distribution infrastructure
10.2.1.4.2. Horizontal drilling
10.2.1.4.3. In-pit water distribution infrastructure
10.2.2. Reichelt's Find
10.2.2.1. Desk-based investigation
10.2.2.1.1. HAR
10.2.2.2. Site-based investigation
10.2.2.2.1. Phase 1
10.2.2.2.2. Phase 2
10.2.2.2.3. Phase 3
10.2.2.2.4. Phase 4
10.2.2.3. Analysis
10.2.2.3.1. Groundwater Model (SS)
10.2.2.3.2. Groundwater Model (TR)
10.2.2.3.3. Licensing
10.2.2.4. Operational recommendations
10.2.2.4.1. Permanent water distribution infrastructure
10.2.2.4.2. Horizontal drilling
10.2.2.4.3. In-pit water distribution infrastructure
10.2.3. Commonwealth
10.2.3.1. Desk-based investigation
10.2.3.1.1. HAR
10.2.3.2. Site-based investigation
10.2.3.2.1. Phase 1
10.2.3.2.2. Phase 2
10.2.3.2.3. Phase 3
10.2.3.2.4. Phase 4
10.2.3.3. Analysis
10.2.3.3.1. Groundwater Model (SS)
10.2.3.3.2. Groundwater Model (TR)
10.2.3.3.3. Licensing
10.2.3.4. Operational recommendations
10.2.3.4.1. Permanent water distribution infrastructure
10.2.3.4.2. Horizontal drilling
10.2.3.4.3. In-pit water distribution infrastructure
10.3. Priority 3
10.3.1. Ventnor
10.3.1.1. Desk-based investigation
10.3.1.1.1. HAR
10.3.1.2. Site based investigation
10.3.1.2.1. HAR to inform
10.3.1.3. Analysis
10.3.1.3.1. HAR to inform
10.3.1.4. Operations
10.3.1.4.1. HAR to inform
10.3.2. King John
10.3.2.1. Desk-based investigation
10.3.2.1.1. HAR
10.3.2.2. Site based investigation
10.3.2.2.1. HAR to inform
10.3.2.3. Analysis
10.3.2.3.1. HAR to inform
10.3.2.4. Operations
10.3.2.4.1. HAR to inform
10.3.3. Davies Bore
10.3.3.1. Desk-based investigation
10.3.3.1.1. HAR
10.3.3.2. Site based investigation
10.3.3.2.1. HAR to inform
10.3.3.3. Analysis
10.3.3.3.1. HAR to inform
10.3.3.4. Operations
10.3.3.4.1. HAR to inform
10.4. Priority 4
10.4.1. Thompsons Bore
10.4.1.1. Desk-based investigation
10.4.1.1.1. HAR
10.4.1.2. Site based investigation
10.4.1.2.1. HAR to inform
10.4.1.3. Analysis
10.4.1.3.1. HAR to inform
10.4.1.4. Operations
10.4.1.4.1. HAR to inform
10.4.2. Terminator
10.4.2.1. Desk-based investigation
10.4.2.1.1. HAR
10.4.2.2. Site based investigation
10.4.2.2.1. HAR to inform
10.4.2.3. Analysis
10.4.2.3.1. HAR to inform
10.4.2.4. Operations
10.4.2.4.1. HAR to inform
10.4.3. Betelgeuse
10.4.3.1. Desk-based investigation
10.4.3.1.1. HAR
10.4.3.2. Site based investigation
10.4.3.2.1. HAR to inform
10.4.3.3. Analysis
10.4.3.3.1. HAR to inform
10.4.3.4. Operations
10.4.3.4.1. HAR to inform
11. Ongoing works
12. Duketon-wide
12.1. Data management (CHDMS)
12.1.1. Spatial data
12.1.1.1. Esri solutions (GIS solutions)
12.1.1.1.1. ArcGIS Desktop
12.1.1.1.2. ArcGIS Online Portal
12.1.1.1.3. ArcGIS Mobile
12.1.2. Non-spatial data
12.1.2.1. Database
12.1.2.1.1. Water levels
12.1.2.1.2. Water chemistry
12.1.2.1.3. Water flow rates
12.1.2.1.4. Infrastructure
12.1.2.1.5. Geology
12.1.3. Project-wide insights
12.1.3.1. Web app(s)
12.1.3.1.1. Hydrological/hydraulic
12.1.3.1.2. Hydrogeological
12.1.3.1.3. Land deformation
12.1.3.2. Specific deliverables
12.1.3.2.1. Reporting
12.1.3.2.2. Mine scheduling
12.2. Hydraulic Model
12.2.1. Inputs
12.2.1.1. Pump(s)
12.2.1.1.1. Pump performance curves
12.2.1.1.2. Dynamic head
12.2.1.2. Pipeline(s)
12.2.1.2.1. Dynamic head
12.2.1.3. Pond(s)
12.2.1.3.1. Capacity
12.2.2. Processes
12.2.2.1. Design
12.2.2.2. Pump specifications
12.2.2.3. Pipe specifications
12.2.3. Insights
12.2.3.1. Theoretical vs reality
12.2.3.2. System performance
12.2.3.3. Pumping efficiencies
12.3. Water Balance Model
12.3.1. Inputs
12.3.1.1. Flow rates
12.3.1.1.1. Hydraulic Model (current status)
12.3.1.1.2. Predicted (long-term)
12.3.1.2. Water usage
12.3.1.2.1. Hydraulic Model (current status)
12.3.1.2.2. Predicted (long-term)
12.3.2. Processes
12.3.2.1. LoM Schedule
12.3.2.2. Hydraulic Model
12.3.3. Insights
12.3.3.1. Annual Update Report
12.3.3.1.1. Infrastructure requirements
12.3.3.1.2. Water-use Strategy
12.3.3.2. Current status updates
12.3.3.2.1. 3MS
12.3.3.2.2. PMP
12.4. DWER/DMIRS
12.4.1. Regulatory Reports
12.4.1.1. Annual Groundwater Reports
12.4.2. Applications
12.4.2.1. Works Approval (if required)
12.4.2.2. Environmental License amendments
12.4.2.3. Water Licensing
12.4.2.4. Mining proposal
13. Colour Legend
14. Groundwater Model (TR)
14.1. Data requirements
14.1.1. Baseline water levels
14.1.1.1. Calibration
14.1.2. SS baseline results
14.1.3. Pump test data
14.1.4. Dewatering schedule
14.1.5. Pit shell design (per mining stage)
14.2. Processing abilities
14.2.1. Permeability & storage
14.3. Insights
14.3.1. Dewatering groundwater flow vector
14.3.2. Transient simulation (over LoM)
14.3.3. Groundwater transient dewatering simulation (over LoM)
14.3.4. Groundwater mass balance