Planning & Design

Lancez-Vous. C'est gratuit
ou s'inscrire avec votre adresse e-mail
Planning & Design par Mind Map: Planning & Design

1. Proposed OPP Planning and Design Section

1.1. About OPP Planing and Design

1.1.1. Five-Year Capital Plan: 2014-2018

1.1.1.1. Capital Plan Powerpoint Presentation

1.1.1.2. Capital Plan Project List

1.1.1.3. Capital Plan Strategic Rationale

1.1.1.4. Capital Plan Press Release

1.1.2. Penn State's Switch from Coal to Natural Gas

1.1.3. Faculty State Presentations

1.1.3.1. 2008 Faculty Senate Presentation - PPT

1.1.3.2. 2008 Faculty Senate Presentation - PDF

1.2. Design & Construction Standards

1.2.1. Divisions - BROKEN DOWN INTO MULTIPLE PAGES

1.2.2. Revision Log Archive

1.2.2.1. PSU Design Standards Revisions - Multiple pages

1.2.2.2. 2009-04-30 Design and Construction Standards

1.2.3. Construction Services QA/QC Checklists

1.2.3.1. MULTIPLE DOCUMENTS

1.2.4. Hershey Information: Architectural Design Standars, MEP, Policies

1.2.4.1. Hershey Architectural Design Standards

1.2.4.2. Hershey MEP

1.2.4.3. Hershey Infection Control Policy

1.2.5. Signage Standards

1.2.5.1. Campus Signage Standards

1.2.5.1.1. ADA Act of 1990

1.2.5.1.2. ADA and ABA Accessibility Guidelines for Business and Facilities

1.2.5.2. OPP Policy FP6

1.2.5.3. Signage Committee

1.2.5.3.1. Visual & Editorial Standards

1.2.5.4. Room Numbering

1.2.5.4.1. Room Numbering System PDF

1.2.5.4.2. Room Numbering Example PDF

1.2.5.5. Interior Signage

1.2.5.5.1. ADA and ABA Accessibility Guidelines for Business and Facilities

1.2.5.6. Exterior Signage

1.2.5.6.1. Multiple PDFs relating to Exterior Signage

1.2.6. L&I Building Permits

1.2.6.1. L&I Process Flow Diagram

1.2.6.2. Permit Determination Form

1.2.6.3. Annual Building Permit Report - Listing

1.2.6.4. Annual Building Permit Report - Map

1.2.6.5. Building Permit Status

1.2.6.5.1. 2014 Building Permit Status: University Park

1.2.6.5.2. 2014 Building Permit Status: Commonwealth

1.2.6.5.3. 2013 Building Permit Status: University Park

1.2.6.5.4. 2013 Building Permit Status: Commonwealth

1.3. Construction Procurement Opportunities / Projects Out to Bid

1.3.1. Project DETAIL page (MULTIPLE PAGES, DYNAMIC)

1.3.2. Bid Results

1.3.2.1. Project Bid Results DETAIL pages

1.3.2.2. Any downloadable documents association with a specific bid

1.4. Design Professional Selection

1.4.1. Contractor Prequalification Information

1.4.1.1. Prequalification Submission Requirements

1.4.1.1.1. Campus List

1.4.1.1.2. Reference Forms

1.4.1.2. Prequalified Bidders List

1.4.1.2.1. Prequalified Bidders List (Master)

1.4.1.2.2. Prequalified Bidders Search Page

1.4.1.2.3. LI Current Prevailing Wage Act Debarments

1.4.2. In Progress Design Professional Selections

1.4.2.1. Trippe Hall

1.4.2.2. Mushroom Research Center

1.4.2.3. Baker Engineering & Science Building

1.4.3. Policies and Guidelines

1.4.3.1. Background Check Requirement

1.4.3.2. CPD Architect and Engineer Selection Policy

1.4.3.3. BOT Architect Photo Submission Guidelines

1.5. Master Plans

1.5.1. University Park

1.5.1.1. Guiding Principles for Campus Planning

1.5.1.1.1. Guiding Principles for Campus Planning DOC

1.5.1.2. University Park Campus Master Plan

1.5.1.2.1. 1.0 - Introduction

1.5.1.2.2. 2.0 Summary of the Master Plan Update Phase 1 Report and Recommendations

1.5.1.2.3. 3.0 Master Plan Facilities Program

1.5.1.2.4. 4.0 Existing Conditions Summary

1.5.1.2.5. 5.0 Master Plan Recommendations

1.5.1.2.6. 6.0 Future Planning

1.5.1.2.7. 7.0 Maps

1.5.1.3. Bicycle Master Plan

1.5.1.3.1. Downloadable PDF

1.5.1.4. College of Arts & Architecture Master Plan

1.5.1.4.1. Downloadable PDF

1.5.1.5. Eberly College of Science Facilities Master Plan

1.5.1.5.1. Downloadable PDF

1.5.1.6. Innovation Park Master Plan

1.5.1.6.1. Downloadable PPT

1.5.1.7. Mount Nittany Medical Center Master Plan

1.5.1.7.1. Downloadable PDF

1.5.1.8. Outdoor Public Art Master Plan

1.5.1.8.1. Downloadable PDF

1.5.1.9. Park Avenue Master Plan

1.5.1.9.1. Downloadable PDF

1.5.1.10. West Campus Master Plan

1.5.1.10.1. Downloadable PDF

1.5.2. Penn State Abington

1.5.2.1. Downloadable PDF

1.5.3. Penn State Altoona

1.5.4. Penn State Berks

1.5.4.1. Downloadable PDF

1.5.5. Penn State Brandywine

1.5.5.1. Downloadable PPT

1.5.5.2. Downloadable PDF

1.5.6. Penn State Harrisburg

1.5.6.1. Downloadable PDFs

1.5.7. Campus Exterior Architectural Plan (CEAP)

1.5.7.1. Downloadable PDFs for each campus

1.6. Construction Projects

1.6.1. Active Projects

1.6.1.1. Pell Lab

1.6.1.2. Pegula Ice Arena

1.6.1.3. South Halls Renovation and Additional Building

1.6.1.4. Arboretum Children's Garden

1.6.1.5. Biobehavioral Health Building

1.6.1.6. East Campus Steam Line

1.6.1.7. Moore/CEDAR Renovations

1.6.1.8. IM Building Addition

1.6.1.9. HUB Addition

1.6.1.10. Shavers Creek Dam

1.6.1.11. South Frear Renovations

1.6.1.12. HHD Building

1.6.1.13. Nittany Lion Snrine

1.6.2. Archived Projects

1.6.2.1. ALL ARCHIVED PROJECTS (multiple pages, 2012-2003)

1.6.3. University Park Campus Tour

1.6.3.1. Multiple External Links

1.7. Design & Construction Minority and Women Business Enterprise Program

1.7.1. MBE/WBE Program

1.7.2. Prequalified Bidders

1.7.3. MBE/WBE Firms

1.7.4. MBE/WBE Links

1.7.4.1. DGS MBE/WBE's

1.7.4.2. MBEC

1.7.4.3. NMSDC

1.7.4.4. NWBOC

1.7.4.5. PA Unified Certification Program

1.7.4.6. PennDOT MBE/WBE Information

1.7.4.7. Penn State Purchasing Department Supplier Diversity

1.7.4.8. SEPTA

1.7.4.9. WBENC

2. Existing OPP Planning & Design Section

2.1. L&I Building Permits

2.1.1. L&I Process Flow Diagram

2.1.2. Permit Determination Form

2.1.3. Annual Building Permit Report - Listing

2.1.4. Annual Building Permit Report - Map

2.1.5. Building Permit Status

2.1.5.1. 2014 Building Permit Status: University Park

2.1.5.2. 2014 Building Permit Status: Commonwealth

2.1.5.3. 2013 Building Permit Status: University Park

2.1.5.4. 2013 Building Permit Status: Commonwealth

2.2. Five-Year Capital Plan: 2014-2018

2.2.1. Capital Plan Powerpoint Presentation

2.2.2. Capital Plan Project List

2.2.3. Capital Plan Strategic Rationale

2.2.4. Capital Plan Press Release

2.3. Construction Projects

2.3.1. Active Projects

2.3.1.1. Pell Lab

2.3.1.2. Pegula Ice Arena

2.3.1.3. South Halls Renovation and Additional Building

2.3.1.4. Arboretum Children's Garden

2.3.1.5. Biobehavioral Health Building

2.3.1.6. East Campus Steam Line

2.3.1.7. Moore/CEDAR Renovations

2.3.1.8. IM Building Addition

2.3.1.9. HUB Addition

2.3.1.10. Shavers Creek Dam

2.3.1.11. South Frear Renovations

2.3.1.12. HHD Building

2.3.1.13. Nittany Lion Snrine

2.3.2. Archived Projects

2.3.2.1. ALL ARCHIVED PROJECTS (multiple pages, 2012-2003)

2.4. Contractor Prequalification

2.4.1. Prequalification Submission Requirements

2.4.1.1. Campus List

2.4.1.2. Reference Forms

2.4.2. Prequalified Bidders List

2.4.2.1. Prequalified Bidders List (Master)

2.4.2.2. Prequalified Bidders Search Page

2.4.2.3. LI Current Prevailing Wage Act Debarments

2.5. Design & Construction Minority and Women Business Enterprise Program

2.5.1. MBE/WBE Program

2.5.2. Prequalified Bidders

2.5.3. MBE/WBE Firms

2.5.4. MBE/WBE Links

2.5.4.1. DGS MBE/WBE's

2.5.4.2. MBEC

2.5.4.3. NMSDC

2.5.4.4. NWBOC

2.5.4.5. PA Unified Certification Program

2.5.4.6. PennDOT MBE/WBE Information

2.5.4.7. Penn State Purchasing Department Supplier Diversity

2.5.4.8. SEPTA

2.5.4.9. WBENC

2.6. Design & Construction Standards

2.6.1. Divisions - BROKEN DOWN INTO MULTIPLE PAGES

2.6.2. Revision Log Archive

2.6.2.1. PSU Design Standards Revisions - MULTIPLE PAGES

2.6.2.2. 2009-04-30 Design and Construction Standards

2.6.3. Hershey Architectural Design Standards

2.6.4. Construction Services QA/QC Checklists

2.6.4.1. MULTIPLE DOCUMENTS

2.6.5. Hershey MEP

2.6.6. Hershey Infection Control Policy - BROKEN LINK

2.7. Design Professional Selection

2.7.1. Background Check Requirement

2.7.2. In Progress Design Professional Selections

2.7.2.1. Trippe Hall

2.7.2.2. Mushroom Research Center

2.7.2.3. Baker Engineering & Science Building

2.7.3. CPD Architect and Engineer Selection Policy

2.7.4. BOT Architect Photo Submission Guidelines

2.8. Master Plans

2.8.1. University Park

2.8.1.1. Guiding Principles for Campus Planning

2.8.1.1.1. Guiding Principles for Campus Planning DOC

2.8.1.2. University Park Campus Master Plan

2.8.1.2.1. 1.0 - Introduction

2.8.1.2.2. 2.0 Summary of the Master Plan Update Phase 1 Report and Recommendations

2.8.1.2.3. 3.0 Master Plan Facilities Program

2.8.1.2.4. 4.0 Existing Conditions Summary

2.8.1.2.5. 5.0 Master Plan Recommendations

2.8.1.2.6. 6.0 Future Planning

2.8.1.2.7. 7.0 Maps

2.8.1.3. Bicycle Master Plan

2.8.1.3.1. Downloadable PDF

2.8.1.4. College of Arts & Architecture Master Plan

2.8.1.4.1. Downloadable PDF

2.8.1.5. Eberly College of Science Facilities Master Plan

2.8.1.5.1. Downloadable PDF

2.8.1.6. Innovation Park Master Plan

2.8.1.6.1. Downloadable PPT

2.8.1.7. Mount Nittany Medical Center Master Plan

2.8.1.7.1. Downloadable PDF

2.8.1.8. Outdoor Public Art Master Plan

2.8.1.8.1. Downloadable PDF

2.8.1.9. Park Avenue Master Plan

2.8.1.9.1. Downloadable PDF

2.8.1.10. West Campus Master Plan

2.8.1.10.1. Downloadable PDF

2.8.2. Penn State Abington

2.8.2.1. Downloadable PDF

2.8.3. Penn State Altoona

2.8.4. Penn State Berks

2.8.4.1. Downloadable PDF

2.8.5. Penn State Brandywine

2.8.5.1. Downloadable PPT

2.8.5.2. Downloadable PDF

2.8.6. Penn State Harrisburg

2.8.6.1. Downloadable PDFs

2.9. Construction Procurement Opportunities / Projects Out to Bid

2.9.1. Project DETAIL page (MULTIPLE PAGES, DYNAMIC)

2.9.2. Bid Results

2.9.2.1. Project Bid Results DETAIL pages

2.9.2.2. Any downloadable documents association with a specific bid

2.10. Events

2.11. Faculty State Presentations

2.11.1. 2008 Faculty Senate Presentation - PPT

2.11.2. 2008 Faculty Senate Presentation - PDF

2.12. News

2.12.1. News DETAIL pages referencing Design & Construction Standards Updates

2.13. University Park Campus Tour

2.13.1. Multiple External Links

2.14. Signage Standards

2.14.1. Campus Signage Standards

2.14.1.1. Questions (broken link?)

2.14.1.2. ADA Act of 1990

2.14.1.3. ADA and ABA Accessibility Guidelines for Business and Facilities

2.14.2. OPP Policy FP6

2.14.3. Signage Committee

2.14.3.1. Visual & Editorial Standards

2.14.4. Room Numbering

2.14.4.1. Room Numbering System PDF

2.14.4.2. Room Numbering Example PDF

2.14.5. Interior Signage

2.14.5.1. ADA and ABA Accessibility Guidelines for Business and Facilities

2.14.6. Exterior Signage

2.14.6.1. Multiple PDFs relating to Exterior Signage

2.15. Campus Exterior Architectural Plan (CEAP)

2.15.1. Downloadable PDFs for each campus

2.16. Landscape Design Standards

2.16.1. EMPTY??

2.17. Penn State's Switch from Coal to Natural Gas