COR Training & Building Performance Optimizaton  Evaluations

Lancez-Vous. C'est gratuit
ou s'inscrire avec votre adresse e-mail
COR Training & Building Performance Optimizaton  Evaluations par Mind Map: COR Training & Building Performance Optimizaton  Evaluations

1. ONGOING PROCESS Reporting and Evaluation

1.1. ARE WE Getting the BASICS??

1.2. Are We Getting

1.2.1. Contract Required Min

1.2.2. IF NO? Deduct? /Remdiate / Document

1.2.3. Better than Min??

1.2.4. Best Practice - ???

1.3. DOCUMENT!!!!!!

1.4. Make the info "LIVING"

1.5. SHARE with all 'Stake Holders"

2. BUILDING PERFORMANCE EVALUATIONS

2.1. Annual Site Vist

2.1.1. O&M Eval

2.1.2. Energy/Water Optimizations

2.1.3. Use FM Staff

2.2. Use MARS Criteria - if needed

2.3. Ask Top O&M Reps to Attend

2.4. Will require a PREP package for review prior to on-site

2.5. Estimate on-site for 2 full days for large buildings

3. Quarterly / TriAnnual COTR - OnSite Review

3.1. Need a Tim Shardt Type to do this!!!

3.2. Deeper Dive

3.2.1. Project Support discussions

3.2.2. Repair reviews

3.2.3. Technical Discussions

3.2.4. Energy / Utility Reviews

3.3. Used a Brain Storming / Idea sharing session

4. BUILDING Specific Stuff

4.1. Site Specific Criteria

4.2. Eliminate all NOISE - info that does NOT apply

4.3. Data set up for reviews by others

4.3.1. Looking for best practice

4.3.2. Looking for 'fails to meet min'

4.4. Monthly report set up - iAuditor

4.5. Specific Inspection steps / partner with O&M!

5. Building Knowledge Tree  PROCESS

5.1. Basic Information Gather / Organize

5.1.1. Major System Info - design criteria

5.1.2. System One-line diagrams

5.1.3. Troubleshooting / Fix History

5.1.4. Oddball stuff

5.1.4.1. ie - CH boiler issue

5.2. Easy to use - public 'enough' for those that interact to get to it - see it - keep it  updated

5.3. Eventual tie-in with NCMMS???  (Dreams!)

5.4. Tie in / make part of Regional Energy Page and Reports

5.5. QASP // PM Guide // Inspection Set up for COR Monthly - Qtrly - BPOE's

6. MONTHLY INSPECTIONS

6.1. Identify Inspector - Building Mgr likely!!!

6.2. Insure proper trng  / understd

6.2.1. Reports should be:

6.2.1.1. Same format

6.2.1.2. Include Pictures!

6.2.1.3. Used as to partner

6.2.1.4. Used for training Op

6.2.2. It's NOT a GOTCHA!

6.2.3. It's NOT a FREE PASS