GSB - ICT Technology Brief for Concept Design

Começar. É Gratuito
ou inscrever-se com seu endereço de e-mail
GSB - ICT Technology Brief for Concept Design por Mind Map: GSB - ICT Technology Brief for Concept Design

1. Electrical

1.1. Power Requriements for Racks

1.2. UPS Requuriements

1.3. Power Rails

1.4. Surge Protection

2. Environment

2.1. Air Conditioning

2.1.1. Spit Systems

2.1.2. Integrated with

2.2. Humidifier

3. Tech

3.1. Servers

3.2. Switching

3.3. Other Tech

4. Issues

4.1. Alignment between IT and Project Team

4.2. Work to date on developing requirements

5. Standards

5.1. Cabling

5.1.1. Colour Standards

5.1.2. Field Cabling

5.1.2.1. Cable Lengths

5.1.3. Rack Cabling

5.1.3.1. Thin Leads

5.2. LAN/WAN

5.2.1. Do CUA standards exist in writing

5.3. Rack Layout

5.3.1. Cable Minders

6. Room Design

6.1. Communication Room

6.1.1. Main Communications Room

6.1.2. Floor Distributor

6.2. Build Room

6.3. Flight Deck

7. Brisbane Hub Working Group

7.1. Solution Architect

7.2. Network Specialist

7.3. Systems Specialist

7.4. Service Delivery

7.5. Escalation

7.5.1. Bret Gehrman

7.5.2. Annabelle Flynn

7.5.3. Ville Laakso

7.6. Does IT have a PM to assign to this project?

8. Carriers

8.1. Who are the the carriers that GSB use

8.2. Do we need a temp dark fibre between 145 Ann and 300 George to support a staged relocation