1. Stake Holders

1.1. Client (Finance & Owns)

1.2. Consultant (Cost, Desgn & Supervision)

1.3. Main Contractor (Typically Civil)

1.3.1. Own (Civil)

1.3.1.1. Detailing

1.3.1.2. Concrete

1.3.1.3. Steel

1.3.1.4. Arhcitecture

1.3.1.5. Facade

1.3.1.6. Interiors

1.3.1.7. Painting

1.3.2. MEP

1.3.2.1. Mechanical

1.3.2.1.1. HVAC - Heating, ventilation and air conditioning

1.3.2.2. Electrical

1.3.2.2.1. HV - High Voltage

1.3.2.2.2. LV - Low Voltage

1.3.2.2.3. ELV - Telecom, Data, Fiber, CCTV, BMS

1.3.2.3. Plumbing

1.3.2.3.1. Fire Fighting

1.3.2.3.2. Plumbing

2. Structure within MEP

2.1. General Manager

2.2. Design Team

2.3. Drafting Team

2.4. Site Team

2.4.1. Project Manager

2.4.1.1. Quality Mgr.

2.4.1.1.1. Quality Enginner

2.4.1.2. Project Enginner

2.4.1.2.1. Site Engineer

2.4.1.3. Planning Engineer

2.5. Things to Consider

2.5.1. Resources (Man Power)

2.5.1.1. Transportation

2.5.1.2. Outsourced - Man Power

2.5.2. Material

2.5.2.1. Suppliers / Sub-contractors

2.5.2.2. Logistics / Shipment Tracking

2.5.3. Equipments

3. Typical Flow

3.1. Excavation

3.2. Compaction

3.3. Foundation

3.4. Columns & Beams

3.5. Slabs

4. Floor Parts

4.1. Labour / Resources

4.1.1. Skilled

4.1.2. Unskilled

4.2. Equipments / Tools

4.2.1. JCB

4.2.2. Tower Crane

4.2.3. Fork Lift

4.2.4. Crane

4.2.5. Road Rollers

4.3. Material

4.3.1. Steel

4.3.2. Concrete (Order)

4.3.2.1. Temperature

5. Area Layout

5.1. Duct Plan

5.2. Pipelines

5.3. Services / Lift

5.4. Gas

5.5. Electrical & Telecom

5.6. Shafts

6. Key Questions

6.1. What are the frustations

6.2. Wastages

6.3. Risk Factors

6.3.1. If Materials exist but no resource or other way around

6.3.2. Time is cost

6.4. Time Consumers

7. Industry Tools

7.1. Enterprise Project Portfolio Mgmt.

7.1.1. Oracle Primevera

7.1.1.1. Marketing Material

7.2. FINALCAD

7.2.1. Marketing video

7.3. Other URL