TAILINGS DAM

Get Started. It's Free
or sign up with your email address
TAILINGS DAM by Mind Map: TAILINGS DAM

1. CURRENT TAILINGS FACILITY

1.1. Additional concession line

1.2. Backup SURTDams design

1.2.1. Latest acad design

1.3. Boosterpump Layout

1.3.1. Tailings Pipeline distribution

1.4. Chimney survey

1.5. CP 4 extension

1.5.1. CP4

1.5.1.1. survey

1.5.2. GOLDER

1.6. Current TL -Borrow pit expansion

1.7. Golder_stns

1.8. Key survey

1.9. Old files-Tailings Pond Booster pumps

1.10. Piezo-plan Tailings for Julie

1.11. Pipe Assessment

1.11.1. photo pipes

1.12. Reclaim Water barge Drawings

1.13. Rockpit

1.13.1. Rockpit calculations

1.13.2. Rockpit expansion

1.13.3. Rockpit expansion remaining stripping

1.13.3.1. SURVEY

1.13.4. Rockpit road CL

1.14. SD 1

1.15. SD 3B

1.15.1. Survey backup

1.16. SD 6

1.16.1. Pipe Reroute SD6

1.16.1.1. Photos

1.16.2. SD 6 east road relocated

1.16.2.1. Backup Folder

1.16.2.2. East Ramp modification

1.16.3. Stake out

1.16.3.1. SD 6 ramp re-alignment

1.17. Tail Creek and Topo

1.18. Tailings Dams Asbuilt

1.18.1. ASbuilt cross sections (stake out)

1.18.1.1. Stake out cross section line

1.18.2. Asbuilt cross sections 2013

1.18.2.1. cross section asbuilt

1.18.2.2. East Dam

1.18.2.3. stakeout redo

1.18.2.4. stakeout US

1.18.2.4.1. survey

1.18.2.5. Survey Asbuilt cross sections

1.18.3. Asbuilt cross sections 2014

1.18.4. backup

1.19. Tailings Maps

1.20. Tailings presentation

2. 2006

2.1. Dam inspection_July1606

2.2. FWP Cracking June 26,06

3. 2007

3.1. 2007

3.1.1. August07

3.1.2. November07

3.1.3. October07

3.1.4. September07

4. 2008

4.1. 2008 AnnMgmt plan

4.2. July08_GaugeRelocation

4.3. Manual Inspection

4.4. PC_Pit&Tailings_June0608

5. 2009

5.1. 09 Tailings Management Plan

5.2. 2009- Tailing Construction

5.2.1. Photos

5.2.2. Reports

5.3. Budget

5.4. Designs

5.5. General Reporting

5.6. Management Plan April 2009

5.6.1. Backup Files

5.6.2. Procedures(Update June 15th 2009)

5.6.3. Slides

5.7. Pictures

5.8. Tailings Recomms

6. 2010

6.1. 2010 Management Plan

6.2. Construction 2010

6.3. Designs

6.3.1. 961-3226-2 2005 UPDATE Contract drawings

6.3.2. 9613226-UPDATED-DESIGN-DWGS

6.3.2.1. 9613226-ROSEBEL

6.3.3. 2009 DESIGN UPDATE

6.3.4. North Dam_Section_040909

6.3.5. SAD6

6.3.6. SD2

6.3.7. TAILINGS DAM UPDATES MARCH 2010

6.3.7.1. E

6.3.7.1.1. Contour Design

6.3.7.2. Merging North dam and saddle dam 1

6.3.7.3. N

6.3.7.4. SD1

6.3.7.4.1. Contour Design

6.3.7.5. SD2

6.3.7.5.1. Contour Design

6.3.7.6. SD3

6.3.7.6.1. Contour Design

6.3.7.7. SD4

6.3.7.7.1. Contour Design

6.3.7.8. SD5

6.3.7.8.1. Contour Design

6.3.7.9. SD6

6.3.7.9.1. Contour Design

6.3.7.10. SD7

6.3.7.10.1. Contour Design

6.3.7.11. W

6.3.7.11.1. Contour Design

6.3.8. Updated Cross-section 09-11-2010

6.4. Golder Reports

6.5. Memo

6.6. Tailings

6.6.1. 09 Feb 10 sink holes

6.6.2. 18 March 10

6.6.3. 24 May 10 general

6.6.4. SD2 18 Feb 10

6.6.5. SD7 CP4 25th June 10

6.6.6. WD 22 Mar 10

6.7. TAILINGS road construction Dam 6-west borrow pit

7. 2011

7.1. 0808_pole 132 failure

7.2. Calculation AR 7 dec 2011

7.3. Capacity workings

7.4. Construction Volumes

7.5. Cross-section

7.5.1. Old updates

7.5.2. UPDATED AS-BUILT FILE & GEMCOM DESIGN 14 OCT 2011

7.5.2.1. as-built and gem design lines

7.5.2.2. gem design lines & sap extension line

7.5.3. UPDATED AS-BUILT FILE 16 OCT 2011

7.6. 2011 Management Plan

7.6.1. Tables

7.7. Dump Pond #4

7.8. east dam design revised

7.8.1. Tailings east dam redesign

7.8.1.1. pics

7.9. Reports

7.9.1. Annual Construction Reports

7.9.2. Annual Instrumentation Reports

7.10. SD 1 photos

7.11. Station drawing (for Steve aug 2011)

7.12. Updated_Remaining TAILING CAPACITY

8. 2012

8.1. 5 Yr Plan

8.2. Audit

8.3. CAPACITY VOLUMES

8.3.1. Base case

8.3.2. CAL based on 2 million water

8.3.2.1. Current Pond 554max beach

8.3.2.2. Current Pond 564 max beach

8.3.2.3. TE capacity

8.3.2.3.1. With Golder contours

8.3.2.3.2. MAXIMUM 0.3 % beach surface

8.3.3. Capacity with 6 M cum Water

8.3.3.1. TSFcapacity

8.3.3.2. Water Capacity

8.4. Conference Call minutes

8.5. Construction 2012

8.6. Construction Volumes

8.7. Contingency plan- AR

8.8. DAM as-built cross sections JAN 2012

8.8.1. As-built cross section Jan 20 2012

8.8.1.1. East Dam

8.8.1.2. North Dam

8.8.1.3. SD 1

8.8.1.4. SD 2

8.8.1.5. SD 3

8.8.1.6. SD 4

8.8.1.7. SD 5

8.8.1.8. SD 6

8.8.1.9. SD 7

8.8.1.10. West Dam

8.8.2. Survey

8.9. Dam surface information

8.10. Freeboard & Dam Elev May 2012

8.11. GOLDER DOCUMENTATION

8.12. Matt Drawings

8.13. Pond Water Deficite File

8.14. SD3 Pipe Breach

8.14.1. Photos

8.15. SD6 Road Diversion

8.16. survey volumes of dams for 2 sept 2012

8.17. Tailings Expansion GI

8.17.1. OMAI_files

8.17.2. RE Data from Suriname _files

8.17.3. RE ToR - Tailings Pond Expansion_files

8.17.3.1. RE HAZOP STUDY_files

8.18. Tailings Zones

8.19. TL

8.20. TMP 2012

8.21. TWSP Waterlevel

9. 2013

9.1. BGC audit

9.2. Construction Information 2013

9.2.1. 5 year plan for Budget 2014

9.2.2. source for construction amount

9.2.2.1. capacity vol calc for TE

9.2.2.1.1. 540 cap cal feb2013

9.2.2.1.2. 550 cap cal feb2013

9.2.2.2. Sap vol per meter lift

9.2.3. Volumes for construction OCT 2013

9.2.3.1. TSF current

9.2.3.2. TSF Expansion

9.3. Memo&Reports on construction

9.4. month end dam fill volumes

9.5. Photos Operational

9.6. Risk Assessment Construction 2013

9.7. SD 6 Pipe replacement Risk

9.7.1. pics 0801313

9.8. Spigotting schedule

9.9. Survey done by ext survey

9.10. Surveyed Construction Volumes

9.11. Tailings Expansion GI

9.12. TMP 2013

9.12.1. Audit recomms and action plan

9.13. West Dam crack DS rip rap

9.14. WEST DAM CRACK ON RIP RAP 20June13

10. 2014

10.1. 2014 Construction

10.1.1. 5 YR budget info onvolumes

10.1.2. Month End-Sap Fill Volumes

10.1.3. MS PROJECT-Tailings Construction Schedule

10.1.3.1. PDF-Weekly Updated Schedules

10.1.4. Old schedules

10.1.5. TAILINGS CONSTRUCTION VOLUMES

10.1.6. West Dam & SD7 additional capacity

10.2. BGC Audit

10.3. Current Stats Maps

10.4. Low Water Workings

10.5. Memo&Reports on construction

10.5.1. Construction

10.5.2. Proposals

10.5.2.1. Asbuilt Dams-updated

10.5.2.2. Maps for proposal tender document-Tailings Expansion 3Yr Plan

10.5.2.2.1. Backup

10.5.2.3. Proposal 2015 2016 FINAL

10.5.3. Water Deficit and NIMOS

10.6. Spigotting schedule

10.6.1. Spig vol per dam

10.6.1.1. water level @533 el

10.6.1.2. water level @535 el

10.6.1.3. water level @537 el

10.6.1.4. water level @539 el

10.6.1.5. water level @541 el

10.6.1.6. water level @543 el

10.6.1.7. water level @545 el

10.6.1.8. water level @547 el

10.6.1.9. water level @549 el

10.6.1.10. water level @551 el

10.6.1.11. water level @553 el

10.6.1.12. water level @555 el

10.7. SRK site wide water balance DRAFT

10.8. Survey Volumes

10.8.1. Januari

10.9. TMP 2014

11. 2015

11.1. 2015 AUDITS

11.1.1. External TMC report

11.2. 2015+2016 TSF Construction Volumes

11.2.1. NE DAM

11.2.2. SD 10

11.2.3. SOUTHDAM

11.2.4. SD 9

11.2.5. SD 8

11.3. ASBUILT 2015 FINAL

11.3.1. Asbuilt asc files

11.3.2. SD 8

11.4. BORROW PIT VOLUMES

11.5. East Dam Instability

11.5.1. Photos

11.6. Mount Polley Info

11.7. REM CAP LOM

11.8. Schedules

11.9. SD10

11.10. TMP 2015

11.10.1. Construction Volumetrics AR

11.10.1.1. TE Dams at 543

11.10.2. Supporting data

12. AFE and Budget

12.1. 2013

12.2. 2014

12.3. 2015

12.3.1. Edumine

12.3.2. Monthend

12.3.2.1. AFE Capex Tracking

12.3.2.2. Engineering

12.3.2.3. Finance

12.4. 2016

12.4.1. CONSTRUCTION VOLUMES

13. Batheymetric survey

13.1. 2008

13.2. 2009

13.2.1. `MILL DRAINAGE POND

13.2.2. TAILINGS POND

13.2.2.1. December 2009

13.2.2.2. July 2009

13.3. 2010

13.3.1. December 2010

13.3.1.1. Bathy survey data

13.3.1.2. Calculation with adjusted tailings base(2008)

13.3.1.2.1. Tailings beach volume

13.3.1.2.2. Water Volume

13.3.1.3. Updated water volume Jan 2012

13.3.2. July 2010

13.3.2.1. Mill Drainage pond

13.3.2.1.1. Fieldwork MEDP 2010

13.3.2.2. Tailings Pond

13.3.2.2.1. Water volume

13.3.2.2.2. Updated water volume Jan 2012

13.4. 2011

13.4.1. June

13.4.1.1. Bathy survey data

13.4.1.2. Updated watervolume Jan 2012

13.4.2. November

13.5. 2012

13.5.1. Bathymetric Survey 01 July 2012

13.5.1.1. survey data

13.5.2. Bathymetric Survey 18 October 2012

13.5.3. Bathymetric Survey 23 Sept

13.5.4. Beach survey 03 May WD

13.5.5. capacity volume Calculations

13.5.5.1. Remaining Cap based on Bathy survey

13.5.5.2. Total Cap based on Base Topo

13.5.6. Jan 18 2012

13.5.7. Jan 22 2012

13.5.8. Water level increase calculations

13.6. 2013

13.6.1. 19 Sept 2013

13.6.1.1. GPS data

13.6.1.2. Tailings Beach

13.6.2. 29 May 2013

13.6.3. august 2013 (maptech)

13.7. 2014

13.7.1. 05 Oct 14

13.7.1.1. Pay Caro

13.7.1.1.1. Pay Caro

13.7.1.2. Rosebel TSF

13.7.1.2.1. Tailings

13.7.1.2.2. Tailings Project

13.7.2. 14 Jan 14

13.7.3. 19 March 2014

13.7.4. 20 augustus 2014

13.7.5. 21 Oct 14 TEST boat

13.7.6. 25&28 May 14

13.7.7. 30 Nove 14

13.8. 2015

13.8.1. Manual010215

13.8.1.1. 01Feb

13.8.2. Z-boat140815

13.8.2.1. TSF1

13.8.2.1.1. TSF1 Official RAW DATA

13.8.2.2. TSF2

13.8.2.2.1. TSF2 Official RAW DATA

13.9. Bathy info Sharp Tom

13.10. Reports

13.11. west dam extension spig pipe

13.12. Z-BOAT MANUAL

13.12.1. GPS setting

13.12.2. Manual

13.12.3. SOFTWARE

13.12.4. Z boat

13.12.5. Z boat Commissionng

13.12.5.1. Files

13.12.5.2. Photos_Videos

13.12.5.3. Test 2 PC

13.12.6. Z-Boat Presentation

14. Draft Site wide water balance sheet& others

14.1. Draft TSF water balance with expansion

14.1.1. Example water balance BGC

14.1.1.1. waterbalance sheet (draft)-SRK

14.1.1.1.1. explanation

14.2. Expansion Water Balance

15. GOLDER DOCUMENTATION

15.1. Construction and Annual Instrumentation report

15.2. Design Record

15.2.1. autocad drawings

15.2.1.1. 2013 updated design

15.2.1.2. Design

15.2.1.2.1. design _update 2013

15.2.1.2.2. design_update_july2009

15.2.2. Current Tailings Facility Dam designs - 14 Aug 2013

15.3. Draft Annual report

15.4. Technical Design Memo

15.4.1. Memo's for 2012 and older

15.4.2. Memo's from 2013

15.4.3. Memo's from 2014

15.4.4. Memo's from 2015

15.5. Typical dam cross section

16. INCIDENT & INSPECTION RECORDS

16.1. EAST DAM CRACK ON RIP RAP 13June2015

16.1.1. Photos

16.2. Leak spinzone 04 March 13

16.3. Leak spinzone 28 FEB 13

16.4. Leak tail booster 18 FEB 13

16.5. SD 1 Washout

16.6. WEST DAM CRACK ON RIP RAP 20June13

17. MAC Tailing Audit Protocol

17.1. MAC information

17.1.1. Info from Annie Blier

17.1.1.1. TF inspection

18. New VWP Tailingsdams

19. Pictures

19.1. Expansion

19.2. NE Dam

19.3. SD 7 & NE dam

19.4. Tailings Pipe

20. PROCEDURES

20.1. 2013

20.2. 2014

20.3. 2015

20.4. ISO Forms

21. PROJECTS- TAILINGSFACILITY

21.1. TAILINGS EXPANSION

21.1.1. Asbuilt survey

21.1.1.1. Remaining Volumes

21.1.2. Dam outlines SD 8, 9, Southdam

21.1.3. Draft New dam designs

21.1.4. Final Dam Design - Tailings Expansion

21.1.5. Golder stations

21.1.6. New Reclaim Barge

21.1.6.1. Electrical Route

21.1.6.1.1. Backup file

21.1.6.2. Pics PC system

21.1.6.3. Ramp drainage

21.1.6.4. Sign off+Design_reclaim Barge ramp system

21.1.6.5. Stake out

21.1.6.6. Survey

21.1.7. North East Dam

21.1.7.1. Base survey

21.1.7.1.1. Base survey cofferdam

21.1.7.1.2. Key excavations

21.1.7.1.3. Maptek base survey

21.1.7.2. CHIMNEY survey

21.1.7.3. Cofferdam Design

21.1.7.4. NE Dam Starter Dam Design

21.1.7.5. Sandblanket base

21.1.7.6. Stake out

21.1.7.7. Survey after base excavation

21.1.8. Piezometers

21.1.9. Sand Blanket Volumes

21.1.10. SD 8

21.1.10.1. ACAD design send to Golder

21.1.10.2. Key survey

21.1.10.3. Sand blanket base

21.1.10.4. SD 8 Starter Dam Design

21.1.10.5. Stake out

21.1.10.6. Survey before construction

21.1.10.6.1. Contour lines from I-Site - 25sept 2014

21.1.11. SD 10 - Draft

21.1.11.1. Contours from Maptek

21.1.11.2. Survey updates

21.1.11.2.1. SD10keys

21.1.12. SD 11-Draft

21.1.13. SD9

21.1.13.1. ACAD Design send out to Golder

21.1.13.2. STAKEOUT

21.1.13.3. Survey before construction

21.1.13.3.1. Key survey

21.1.13.3.2. Sand Blanket

21.1.14. South Dam

21.1.14.1. Borrowpit

21.1.14.2. Design backup files

21.1.14.3. South dam- KEY LAYOUT

21.1.14.4. Station backup files

21.1.14.5. Survey before construction

21.1.14.6. Survey during construction

21.1.15. SURVEY DONE BY SAHIT

21.1.16. Tailings construction plan drawings

21.1.16.1. backup

21.1.17. Tailings Expansion DDH GPS Coordinates

21.1.18. UPDATED EXP TOPO 10Sept14

21.2. Tailings Road Signs

21.3. Test 1

21.3.1. Matrices

21.3.2. Modified

21.3.3. RawData

21.3.4. Soundings

21.4. Tailings Lunchroom

21.4.1. New folder

21.4.2. SEMC Electrical proposal

21.5. UPDATED SOP & JHA

21.5.1. JHA

21.5.1.1. SEMC JHA

21.5.2. SOP

22. Safety File JHA, MOC etc.

23. Seepage monitoring

24. SEMC

24.1. Month End Data

24.1.1. Asbuilt Survey

24.1.2. Fuel

24.1.2.1. copied to Mastersheet

24.1.3. Man Hours

24.1.3.1. copied to Mastersheet

24.1.4. Rentals

24.1.4.1. copied to Mastersheet

24.1.5. TSF LOAD COUNT

24.1.5.1. April

24.1.5.2. August

24.1.5.3. July

24.1.5.4. June

24.1.5.5. May

24.2. SAFETY

24.2.1. INCIDENT REPORTS

24.2.2. Safety MOC_Workshop

24.3. SEMC Invoices

24.3.1. 176

24.3.2. 188

24.3.3. 189

24.3.4. 206

24.3.5. 207

24.3.6. 209

24.3.7. 222

24.3.8. 241

24.3.9. 280

24.3.10. Historical Pre Contract

24.3.11. Other

24.4. SEMC Safety Concerns

25. Settlement plates data

26. STAKE OUT JOBS TSF

27. TAILINGS CRISIS MANAGEMENT PLAN

27.1. 2012

27.2. 2014

27.2.1. asc files

27.2.2. Emergency resp plan

27.2.3. ND

27.2.4. SD 5

27.2.5. SD 6

27.2.6. SD 7

27.2.7. Tailings Crisis Mgmt Plan docs

27.2.8. WD

27.3. bgc

28. TAILINGS INSPECTION RECORDS

28.1. Inspection Records

28.1.1. 2015

28.1.1.1. July

28.1.1.1.1. Aruna Blijd 7 July

28.1.1.1.2. Ghiany 15 july

28.1.1.2. June

28.2. Inspection Schedule

28.2.1. 2009

28.2.2. 2010

28.2.3. 2011

28.2.4. 2012

28.2.5. 2013

28.2.6. 2014

28.2.7. 2015

28.3. Piezos reading

28.3.1. 2006

28.3.2. 2007

28.3.3. 2008

28.3.4. 2009

28.3.4.1. April 2009

28.3.4.2. August 2009

28.3.4.3. February 2009

28.3.4.4. January 2009

28.3.4.5. July 2009

28.3.4.6. June 2009

28.3.4.7. May 2009

28.3.4.8. October 2009

28.3.4.9. September 2009

28.3.5. 2010

28.3.5.1. april 2010

28.3.5.2. December 2010

28.3.5.3. February 2010

28.3.5.4. January 2010

28.3.5.5. July 2010

28.3.5.6. June 2010

28.3.5.7. March 2010

28.3.5.8. May 2010

28.3.6. 2011

28.3.6.1. August 2011

28.3.6.2. April 2011

28.3.6.3. December 2011

28.3.6.4. February 2011

28.3.6.5. January 2011

28.3.6.6. July 2011

28.3.6.7. June 2011

28.3.6.8. March 2011

28.3.6.9. May 2011

28.3.6.10. May 2011

28.3.6.11. November 2011

28.3.6.12. October 2011

28.3.6.13. Sept 2011

28.3.7. 2012

28.3.7.1. April

28.3.7.2. August

28.3.7.3. December

28.3.7.4. February

28.3.7.5. January

28.3.7.6. July

28.3.7.7. June

28.3.7.8. March

28.3.7.9. May

28.3.7.10. November

28.3.7.11. October

28.3.7.12. September

28.3.8. 2012

28.3.8.1. April

28.3.8.2. May

28.3.8.3. June

28.3.8.4. July

28.3.8.5. Aug

28.3.8.6. Sept

28.3.8.7. Oct

28.3.8.8. Nov

28.3.8.9. Dec

28.3.8.10. Jan

28.3.8.11. Feb

28.3.8.12. March

28.3.8.13. April

28.3.9. 2013

28.3.9.1. April

28.3.9.2. May

28.3.9.3. June

28.3.9.4. July

28.3.9.5. Aug

28.3.9.6. Sept

28.3.9.7. Oct

28.3.9.8. Nov

28.3.9.9. Dec

28.3.9.10. Jan

28.3.9.11. Feb

28.3.9.12. March

28.3.9.13. April

28.3.10. 2014

28.3.10.1. April

28.3.10.2. May

28.3.10.3. June

28.3.10.4. July

28.3.10.5. Aug

28.3.10.6. Sept

28.3.10.7. Oct

28.3.10.8. Nov

28.3.10.9. Dec

28.3.10.10. Jan

28.3.10.11. Feb

28.3.10.12. March

28.3.10.13. April

28.3.11. 2015

28.3.12. Updated piezo spread sheet GOLDER

28.3.12.1. Old data

28.3.12.1.1. old sheets

28.3.12.1.2. VWP UPDATE GOLDER PIEZOS

28.3.12.2. VWP UPDATE GOLDER PIEZOS

28.3.13. Wells info

29. TAILINGS OMS

29.1. Environmental Data

29.1.1. Edited to include only tailings information

29.2. Maps,Figures & Tables

29.2.1. Environmental Maps

29.2.2. Satellite Images

29.2.3. Weather Graphs

29.3. Mill Data

29.4. OMS DOCUMENT

29.4.1. OMS 2012

29.4.1.1. Procedures

29.4.1.1.1. OMS + Appendix

29.4.2. OMS 2013-2014

29.4.2.1. Closure Plan

29.4.2.2. Communication procedures

29.4.2.3. Emergency Response & Crisis Managment Plan

29.4.2.4. Environmental Controls and procedures

29.4.2.5. Examples from internet

29.4.2.6. Info from Golder on water managment

29.4.2.7. Inspection and Area Managment procedures

29.4.2.8. MAC Guidelines

29.4.2.9. MAPS

29.4.2.10. OMS DOCUMENT DRAFT

29.4.2.11. Risk Assessment

29.4.2.12. supporting data

29.4.2.13. Water balance and treatment procedures (Milling)

29.4.3. OMS 2014

29.4.4. OMS 2015

29.5. Supporting Data

29.6. TAILINGS EXPANSION

29.6.1. Borrow Pit survey April2013

29.6.2. Cross section redone

29.6.2.1. New Folder

29.6.2.2. TE Dam

29.6.3. Dam construction volume estimations

29.6.4. GOLDER volumes

29.6.5. Hydrogeology

29.6.5.1. Drilling

29.6.6. Map for tailings

29.6.6.1. TE creeks

29.6.7. Memo and Reports

29.6.7.1. Expansion Strategic Plan

29.6.8. Modified TE final topo

29.6.9. Presentations

29.6.10. Survey sent to Golder April 2012

29.6.11. Tailings Expansion cost calculations

29.6.11.1. Expansion and LTP

29.6.11.1.1. Tailings Expand Volume

29.6.11.1.2. TAILINGS STORAGE EXPANSION

29.6.11.2. Expansion Project

29.6.12. Tailings Expansion Ground Investigation

29.6.12.1. Bore Hole Logs

29.6.12.1.1. Boreholes

29.6.12.1.2. Drill Holes points & Map JAn 2012

29.6.12.1.3. Test pits

29.6.12.2. Major Day Sheets

29.6.12.2.1. Day Sheets

29.6.12.3. Maps and photos

29.6.12.4. Planning

29.6.12.5. Safety

29.6.12.6. SURVEY

29.6.12.6.1. GPS-back up

30. TAILINGS RISK ASSESMENT

30.1. 2012

30.2. CURRENT DAMS

30.2.1. Contingency plan

30.2.2. DS capacity half height breach with IH_TOPOest0912

30.2.2.1. DS 3procent surface

30.2.3. HALF HEIGHT BREACH TAILINGS LOSS VOLUMES

30.2.3.1. North Dam and SD 1 dam tail loss

30.2.3.2. SD 5

30.2.3.3. SD 6

30.2.3.4. SD 7

30.2.3.5. Wesy Dam

30.2.4. SD 6

30.3. IMPACT ZONE MAPS

30.3.1. Current Dams

30.3.2. TE dams

30.4. TAILINGS EXPANSION DAMS

30.4.1. DS capacity half height breach with IH_TOPOest0912

30.4.1.1. DS 3procent surface

30.4.2. HALF HEIGHT BREACH TAILINGS LOSS VOLUMES

30.4.2.1. NE dam tail loss

30.4.2.2. SD 8 tail loss

30.4.2.2.1. Breach at 546.5 elevation

30.4.2.3. SD 9 tail loss

30.4.2.4. SD 10 tail loss

30.4.2.5. South Dam tail loss

31. TRAINING

31.1. FOR SEMC

31.2. Presentation 10 July 2012

31.3. Presentation 29-05-12

31.4. Presentation 30 Jan 13

31.5. Security Training

31.6. Training records

32. Water Balance

32.1. 2006

32.2. 2007

32.3. 2008

32.4. 2010

32.5. 2013

32.6. 2014

32.6.1. water balance supporting info

33. Waterlevel

33.1. TSF 1 volumetrics

33.2. TWSP info

34. Well monitoring info

35. design_update2005

35.1. 961-3226-2 2005 UPDATE Contract drawings

36. Volumetric

36.1. April 2015

36.2. May 2015

37. Backup files Current TL

37.1. Dam design cross reference with Golder.asc

37.2. Tailings design modified.asc

37.2.1. Dam design modifications.asc

37.2.1.1. Cross sections after modifications

37.2.1.2. Cross sections full

37.2.1.3. SD 3A