PMP - Project

PMP areas and processes

Iniziamo. È gratuito!
o registrati con il tuo indirizzo email
PMP - Project da Mind Map: PMP - Project

1. Initiating

2. Planning

3. Executing

4. Monitoring & controlling

5. Closing

6. Integration

6.1. Develop project charter

6.1.1. Input

6.1.1.1. Project statement of work

6.1.1.2. Business case

6.1.1.3. EEF - Entreprise environmental factors

6.1.1.4. OPA - Organizational process assets

6.1.1.5. Agreement

6.1.2. Tools and techniques

6.1.2.1. Expert judgment

6.1.2.2. Facilitation techniques

6.1.3. Output

6.1.3.1. Project charter

6.2. Develop project management plan

6.2.1. Inputs

6.2.1.1. Project charter

6.2.1.2. EEF - Entreprise environmental factors

6.2.1.3. OPA - Organizational process assets

6.2.1.4. Outputs from other processes

6.2.2. Tools and techniques

6.2.2.1. Expert judgement

6.2.2.2. Facilitation techniques

6.2.3. Output

6.2.3.1. Project management plan

6.3. Direct and manager project work

6.3.1. Inputs

6.3.1.1. Project management plan

6.3.1.2. Approved changed requests

6.3.1.3. EEF - Entreprise Environmental factors

6.3.1.4. OPA - Organizational process assets

6.3.2. Tools and techniques

6.3.2.1. Expert judgement

6.3.2.2. PMIS - Project management information system

6.3.2.3. Meetings

6.3.3. Output

6.3.3.1. Deliverables

6.3.3.2. Change requests

6.3.3.3. Project management plan updates

6.3.3.4. Project document updates

6.3.3.5. Work performance data

6.4. Monitor and control project work

6.4.1. Input

6.4.1.1. Project management plan

6.4.1.2. EEF - Entreprise Environmental factors

6.4.1.3. OPA - Organizational process assets

6.4.1.4. Schedule forecast

6.4.1.5. Cost forecast

6.4.1.6. Validated changes

6.4.1.7. Work performance information

6.4.2. Tools and techniques

6.4.2.1. Expert judgement

6.4.2.2. Analytical techniques

6.4.2.3. PMIS - Project management information system

6.4.2.4. Meetings

6.4.3. Output

6.4.3.1. Change requests

6.4.3.2. Work performance reports

6.4.3.3. Project management plan updates

6.4.3.4. Project document updates

6.5. Perform integrated change control

6.5.1. Input

6.5.1.1. Project management plan

6.5.1.2. Change requests

6.5.1.3. EEF - Entreprise Environmental factors

6.5.1.4. OPA - Organizational process assets

6.5.1.5. Work performance reports

6.5.2. Tools and techniques

6.5.2.1. Expert judgement

6.5.2.2. Change control tools

6.5.2.3. Meetings

6.5.3. Output

6.5.3.1. Project management plan updates

6.5.3.2. Project document updates

6.5.3.3. Approved change requests

6.5.3.4. Change log

6.6. Close project or phase

6.6.1. Input

6.6.1.1. Project management plan

6.6.1.2. Accepted deliverables

6.6.1.3. OPA - Organizational process assets

6.6.2. Tools and techniques

6.6.2.1. Expert judgement

6.6.2.2. Meetings

6.6.2.3. Analytical techniques

6.6.3. Output

6.6.3.1. Final product, service or result transition

6.6.3.2. OPA - Organizational process assets updates

7. Time

7.1. Create schedule management plan

7.1.1. Input

7.1.1.1. Project charter

7.1.1.2. Project management plan

7.1.1.3. OPA - Organizational process assets

7.1.1.4. EEF - Entreprise environmental factors

7.1.2. Tools and techniques

7.1.2.1. Expert judgement

7.1.2.2. Meetings

7.1.2.3. Analytical techniques

7.1.3. Output

7.1.3.1. Schedule management plan

7.2. Define activities

7.2.1. Input

7.2.1.1. Scope Baseline

7.2.1.2. Schedule management plan

7.2.1.3. OPA - Organizational process assets

7.2.1.4. EEF - Entreprise environmental factors

7.2.2. Tools and techniques

7.2.2.1. Decomposition

7.2.2.2. Rolling wave planning

7.2.2.3. Expert judgement

7.2.3. Output

7.2.3.1. Activity list

7.2.3.2. Activity attributes

7.2.3.3. Milestones list

7.3. Sequence activities

7.3.1. Input

7.3.1.1. Activity list

7.3.1.2. Activity attributes

7.3.1.3. Milestones list

7.3.1.4. Project scope statement

7.3.1.5. OPA - Organizational process assets

7.3.1.6. EEF - Entreprise environmental factors

7.3.1.7. Schedule management plan

7.3.2. Tools and techniques

7.3.2.1. Precedence Diagramming Method (PDM)

7.3.2.2. Dependency determination

7.3.2.3. Leads and lags

7.3.3. Output

7.3.3.1. Project schedule network diagrams

7.3.3.2. Project documents updates

7.4. Estimate activity resources

7.4.1. Input

7.4.1.1. Activity list

7.4.1.2. Activity attributes

7.4.1.3. OPA - Organizational process assets

7.4.1.4. EEF - Entreprise environmental factors

7.4.1.5. Schedule management plan

7.4.1.6. Resource calendars

7.4.1.7. Risk register

7.4.1.8. Activity cost estimates

7.4.2. Tools and techniques

7.4.2.1. Expert judgement

7.4.2.2. Alternative Analysis

7.4.2.3. Published estimating data

7.4.2.4. Bottom-up estimating

7.4.2.5. Project Management software

7.4.3. Output

7.4.3.1. Activity resource requirements

7.4.3.2. Resource breakdown structure

7.4.3.3. Project document updates

7.5. Estimate activity durations

7.5.1. Input

7.5.1.1. Activity list

7.5.1.2. Activity attributes

7.5.1.3. Activity resource requirements

7.5.1.4. Resource calendars

7.5.1.5. Project scope statement

7.5.1.6. OPA - Organizational process assets

7.5.1.7. EEF - Entreprise environmental factors

7.5.1.8. Schedule management plan

7.5.1.9. Risk register

7.5.1.10. Resource breakdown structure

7.5.2. Tools and techniques

7.5.2.1. Expert judgement

7.5.2.2. Analogous estimating

7.5.2.3. ParaMetric estimating

7.5.2.4. Three-point estimating

7.5.2.5. Reserve analysis

7.5.2.6. Group decision-making techniques

7.5.3. Output

7.5.3.1. Activity duration estimates

7.5.3.2. Project document updates

7.6. Develop schedule

7.6.1. Input

7.6.1.1. Activity list

7.6.1.2. Activity attributes

7.6.1.3. Project schedule network diagrams

7.6.1.4. Activity resource requirements

7.6.1.5. Resource calendars

7.6.1.6. Activity duration estimates

7.6.1.7. Project scope statement

7.6.1.8. OPA - Organizational process assets

7.6.1.9. EEF - Entreprise environmental factors

7.6.1.10. Schedule management plan

7.6.1.11. Risk register

7.6.1.12. Project staff assignements

7.6.1.13. Resource breakdown structure

7.6.2. Tools and techniques

7.6.2.1. Schedule network analysis

7.6.2.2. Critical path method

7.6.2.3. Critical chain method

7.6.2.4. Schedule compression

7.6.2.5. Scheduling tool

7.6.2.6. Resource optimization techniques

7.6.2.7. Modeling techniques

7.6.2.8. Leads and lags

7.6.3. Output

7.6.3.1. Schedule baseline

7.6.3.2. Project schedule

7.6.3.3. Schedule data

7.6.3.4. Project documents updates

7.6.3.5. Project calendars

7.6.3.6. Project management plan updates

7.7. Control schedule

7.7.1. Inputs

7.7.1.1. Project management plan

7.7.1.2. Project schedule

7.7.1.3. Work performance data

7.7.1.4. Project calendars

7.7.1.5. Schedule data

7.7.1.6. OPA - Organizational process assets

7.7.1.7. EEF - Entreprise environmental factors

7.7.2. Tools and techniques

7.7.2.1. Performance reviews

7.7.2.2. Project management software

7.7.2.3. Resources optimization techniques

7.7.2.4. Modeling techniques

7.7.2.5. Leads and lags

7.7.2.6. Schedule compression

7.7.2.7. Scheduling tool

7.7.3. Outputs

7.7.3.1. Work performance information

7.7.3.2. Schedule forecast

7.7.3.3. Change requests

7.7.3.4. Project documents updates

7.7.3.5. Project management plan updates

7.7.3.6. Organization process assets updates

8. Scope

8.1. Create scope management plan

8.1.1. Input

8.1.1.1. Project management plan

8.1.1.2. Project charter

8.1.1.3. EEF - Entreprise environmental factors

8.1.1.4. OPA - Organizational process assets

8.1.2. Tools and techniques

8.1.2.1. Expert judgement

8.1.2.2. Meetings

8.1.3. Output

8.1.3.1. Scope managment plan

8.1.3.2. Requirement management plan

8.2. Collect requirements

8.2.1. Input

8.2.1.1. 1. Project charter

8.2.1.2. 2. Stakeholder register

8.2.1.3. 3. Scope management plan

8.2.1.4. 4. Requirements management plan

8.2.1.5. 5. Stakeholder management plan

8.2.2. Tools and techniques

8.2.2.1. 1. Interviews

8.2.2.2. 2. Focus group

8.2.2.3. 3. Facilitated workshops

8.2.2.4. 4. Group creativity techniques

8.2.2.5. 5. Group decision-making techniques

8.2.2.6. 6. Questionnaires and surveys

8.2.2.7. 7. Observations

8.2.2.8. 8. Prototypes

8.2.2.9. 9. Benchmarking

8.2.2.10. 10. Context diagram

8.2.2.11. 11. Document analysis

8.2.3. Output

8.2.3.1. Requirements documentation

8.2.3.1.1. Root business solved

8.2.3.1.2. Source of the requirement

8.2.3.1.3. The way each requirement addresses the problem

8.2.3.1.4. How the business processes interact with the requirement

8.2.3.1.5. Associated measurements for each requirement

8.2.3.1.6. Business legal ethical compliance

8.2.3.1.7. Constraints and assumptions

8.2.3.1.8. Anticipated impact

8.2.3.2. Requirements traceability matrix

8.3. Define scope

8.3.1. Input

8.3.1.1. Project charter

8.3.1.2. Requirements documentation

8.3.1.3. OPA - Organizational process assets

8.3.1.4. Scope management plan

8.3.2. Tools and techniques

8.3.2.1. Expert judgement

8.3.2.2. Product analysis

8.3.2.3. Facilitated workshops

8.3.2.4. Alternatives generation

8.3.3. Output

8.3.3.1. Project scope statement

8.3.3.2. Project documents updates

8.4. Create WBS

8.4.1. Input

8.4.1.1. Project scope statement

8.4.1.2. Requirement documentation

8.4.1.3. Scope management plan

8.4.1.4. OPA - Organizational process assets

8.4.1.5. EEF - Entreprise environmental factors

8.4.2. Tools and techniques

8.4.2.1. Decomposition

8.4.2.2. Expert judgement

8.4.3. Output

8.4.3.1. Scope baseline

8.4.3.1.1. Project scope statement

8.4.3.1.2. WBS

8.4.3.1.3. WBS dictonary

8.4.3.2. Project document updates

8.5. Validate scope

8.5.1. Input

8.5.1.1. Project management plan

8.5.1.2. Requirements documentation

8.5.1.3. Requirements traceability matrix

8.5.1.4. Verified deliverables

8.5.1.5. Work performance data

8.5.2. Tools and techniques

8.5.2.1. Inspection

8.5.2.2. Groupe decision-making techniques

8.5.3. Output

8.5.3.1. Accepted deliverables

8.5.3.2. Change requests

8.5.3.3. Project documents updates

8.5.3.4. Work performance information

8.6. Control scope

8.6.1. Input

8.6.1.1. Project management plan

8.6.1.2. Requirements documentation

8.6.1.3. Requirements traceability matrix

8.6.1.4. Work performance data

8.6.1.5. OPA - Organizational process assets

8.6.2. Tools and techniques

8.6.2.1. Variance analysis

8.6.3. Output

8.6.3.1. Change requests

8.6.3.2. Project management plan updates

8.6.3.3. Project documents updates

8.6.3.4. OPA - Organizational process assets updates

8.6.3.5. Work performance information

9. Cost

9.1. Plan cost management

9.1.1. Inputs

9.1.1.1. Project management plan

9.1.1.2. Project charter

9.1.1.3. EEF - Entreprise environmental factors

9.1.1.4. OPA - Organizational process assets

9.1.2. Tools and techniques

9.1.2.1. Expert judgement

9.1.2.2. Meetings

9.1.2.3. Analytical techniques

9.1.3. Outputs

9.1.3.1. Cost management plan

9.2. Estimate costs

9.2.1. Inputs

9.2.1.1. 1. Cost management plan

9.2.1.2. 2. Human resource management plan

9.2.1.3. 3. Scope baseline

9.2.1.4. 4. Project schedule

9.2.1.5. 5. Risk register

9.2.1.6. 6. EEF - Entreprise environmental factors

9.2.1.7. 7. OPA - Organizational process assets

9.2.2. Tools and techniques

9.2.2.1. 1. Expert judgement

9.2.2.2. 2. Analogous estimating

9.2.2.3. 3. Parametric estimating

9.2.2.4. 4. Bottom-up estimating

9.2.2.5. 5. Three-point estimating

9.2.2.6. 6. Reserve analysis

9.2.2.7. 7. Cost of quality

9.2.2.8. 8. Project management software

9.2.2.9. 9. Vendor bid analysis

9.2.2.10. 10. Group decision-making techniques

9.2.3. Outputs

9.2.3.1. Activity cost estimates

9.2.3.2. Basis of estimates

9.2.3.3. Project document updates

9.3. Determine budget

9.3.1. Inputs

9.3.1.1. 1. Cost management plan

9.3.1.2. 2. Scope baseline

9.3.1.3. 3. Activity cost estimates

9.3.1.4. 4. Basis of estimates

9.3.1.5. 5. Project schedule

9.3.1.6. 6. Resource calendars

9.3.1.7. 7. Risk register

9.3.1.8. 8. Agreements

9.3.1.9. 9. OPA - Organizational process assets

9.3.2. Tools and techniques

9.3.2.1. Cost aggregation

9.3.2.2. Reserve analysis

9.3.2.3. Expert judgement

9.3.2.4. Historical relationship

9.3.2.5. Funding limit reconciliation

9.3.3. Outputs

9.3.3.1. Cost baseline

9.3.3.2. Project funding requirements

9.3.3.3. Project documents updates

9.4. Control costs

9.4.1. Inputs

9.4.1.1. Project management plan

9.4.1.2. Project funding requirements

9.4.1.3. Work performance data

9.4.1.4. OPA - Organizational process assets

9.4.2. Tools and techniques

9.4.2.1. Earned value management

9.4.2.2. Forecasting

9.4.2.3. TCPI

9.4.2.4. Performance reviews

9.4.2.5. Project management software

9.4.2.6. Reserve analysis

9.4.3. Outputs

9.4.3.1. Work performance information

9.4.3.2. Cost forecasts

9.4.3.3. Change requests

9.4.3.4. Project management plan updates

9.4.3.5. Project documents updates

9.4.3.6. Organizational process assets updates

10. HR

10.1. Plan human resource management

10.1.1. Inputs

10.1.1.1. Project management plan

10.1.1.2. Activity resource requirements

10.1.1.3. EEF - Entreprise environmental factors

10.1.1.4. OPA - Organizational process assets

10.1.2. Tools and techniques

10.1.2.1. Organizational charts and position descriptions

10.1.2.1.1. Hierarchical

10.1.2.1.2. Matrix

10.1.2.1.3. Text-oriented formats

10.1.2.2. Networking

10.1.2.3. Organizational theory

10.1.2.4. Expert judgement

10.1.2.5. Meetings

10.1.3. Outputs

10.1.3.1. Human resource management plan

10.2. Acquire project team

10.2.1. Inputs

10.2.1.1. Human resource management plan

10.2.1.2. EEF - Entreprise environmental factors

10.2.1.3. OPA - Organizational process assets

10.2.2. Tools and techniques

10.2.2.1. Pre-assignements

10.2.2.2. Negociation

10.2.2.3. Acquisition

10.2.2.4. Virtual teams

10.2.2.5. Multi-criteria decision analysis

10.2.3. Outputs

10.2.3.1. Project staff assignments

10.2.3.2. Resource calendars

10.2.3.3. Project management plan updates

10.3. Develop project team

10.3.1. Inputs

10.3.1.1. Human resource management plan

10.3.1.2. Project staff assignments

10.3.1.3. Resource calendars

10.3.2. Tools and techniques

10.3.2.1. Interpersonal skills

10.3.2.2. Training

10.3.2.3. Team-building activities

10.3.2.4. Ground rules

10.3.2.5. Colocation

10.3.2.6. Recognition and rewards (theories of motivation)

10.3.2.6.1. Maslow's hierarchy of needs

10.3.2.6.2. Expectancy theory (Vroom)

10.3.2.6.3. McGregor's theory X and Theory Y

10.3.2.6.4. Contingency theory (Fiedler)

10.3.2.6.5. Herzberg's motivation-hygiene theory

10.3.2.6.6. McClelland's three need theory / Achievement theory

10.3.2.6.7. Forms of power

10.3.2.7. Personnel assessment tools

10.3.3. Outputs

10.3.3.1. Team performance assessments

10.3.3.2. Organizational process assets updates

10.4. Manage project team

10.4.1. Inputs

10.4.1.1. Human resource management plan

10.4.1.2. Project staff assignments

10.4.1.3. Team performance assessments

10.4.1.4. Issue log

10.4.1.5. Work performance reports

10.4.1.6. OPA - Organizational process assets

10.4.2. Tools and techniques

10.4.2.1. Observation and conversation

10.4.2.2. Project performance appraisals

10.4.2.3. Conflict management

10.4.2.3.1. Methods of conflict management

10.4.2.3.2. Constructive / destructive roles

10.4.2.3.3. Interpersonal skills

10.4.3. Outputs

10.4.3.1. Change requests

10.4.3.2. Project management plan updates

10.4.3.3. Project documents updates

10.4.3.4. Entreprise environmental factors updates

10.4.3.5. Organizational process assets updates

11. Quality

11.1. Plan quality management

11.1.1. Inputs

11.1.1.1. Project management plan

11.1.1.1.1. Scope baseline

11.1.1.1.2. Cost baseline

11.1.1.1.3. Schedule baseline

11.1.1.2. Stakeholder register

11.1.1.3. Risk register

11.1.1.4. Requirements documentation

11.1.1.5. OPA - Organizational process assets

11.1.1.6. EEF - Entreprise environmental factors

11.1.2. Tools and techniques

11.1.2.1. Cost-benefit analysis

11.1.2.2. Cost of quality

11.1.2.3. Seven basic quality tools

11.1.2.3.1. 1. Cause-and-effet diagrams

11.1.2.3.2. 2. Flowcharting

11.1.2.3.3. 3. Checksheets

11.1.2.3.4. 4. Pareto diagrams

11.1.2.3.5. 5. Histograms

11.1.2.3.6. 6. Control charts

11.1.2.3.7. 7. Scatter diagrams

11.1.2.4. Benchmarking

11.1.2.5. Design of experiments

11.1.2.6. Statistical sampling

11.1.2.7. Additional quality planning tools

11.1.2.8. Meetings

11.1.3. Outputs

11.1.3.1. Quality management plan

11.1.3.2. Process improvement plan

11.1.3.3. Quality metrics

11.1.3.4. Quality checklists

11.1.3.5. Project documents updates

11.2. Perform quality assurance

11.2.1. Inputs

11.2.1.1. Quality management plan

11.2.1.2. Process improvement plan

11.2.1.3. Quality metrics

11.2.1.4. Quality control measurements

11.2.1.5. Project documents

11.2.2. Tools and techniques

11.2.2.1. Quality management and control tools

11.2.2.1.1. Affinity diagrams

11.2.2.1.2. PDPC - Process decision program charts

11.2.2.1.3. Interrelationship diagraphs

11.2.2.1.4. Tree diagrams

11.2.2.1.5. Prioritization matrices

11.2.2.1.6. Activity network diagrams

11.2.2.1.7. Matrix diagrams

11.2.2.2. Quality audits

11.2.2.3. Process analysis

11.2.3. Outputs

11.2.3.1. Change requests

11.2.3.2. Project management plan updates

11.2.3.3. Project documents updates

11.2.3.4. Organizational process assets updates

11.3. Control quality

11.3.1. Inputs

11.3.1.1. Project management plan

11.3.1.2. Quality metrics

11.3.1.3. Quality checklists

11.3.1.4. Work performance data

11.3.1.5. Approved change requests

11.3.1.6. Deliverables

11.3.1.7. Project documents

11.3.1.8. OPA - Organizational process assets

11.3.2. Tools and techniques

11.3.2.1. Seven basic quality tools

11.3.2.1.1. 1. Cause-and-effet diagrams

11.3.2.1.2. 2. Flowcharting

11.3.2.1.3. 3. Checksheets

11.3.2.1.4. 4. Pareto diagrams

11.3.2.1.5. 5. Histograms

11.3.2.1.6. 6. Control charts

11.3.2.1.7. 7. Scatter diagrams

11.3.2.2. Statistical sampling

11.3.2.3. Inspection

11.3.2.4. Approved change requests review

11.3.3. Outputs

11.3.3.1. Quality control measurements

11.3.3.2. Validated changes

11.3.3.3. Verified deliverables

11.3.3.4. Work performance information

11.3.3.5. Change requests

11.3.3.6. Project management plan updates

11.3.3.7. Project documents updates

11.3.3.8. Organizational process assets updates

12. Communication

12.1. Plan communications management

12.1.1. Inputs

12.1.1.1. Project management plan

12.1.1.2. Stakeholder register

12.1.1.3. EEF - Entreprise environmental factors

12.1.1.4. OPA - Organizational process assets

12.1.2. Tools and techniques

12.1.2.1. Communication requirements analysis

12.1.2.1.1. Communication channels

12.1.2.1.2. Official channels of communication

12.1.2.2. Communication technology

12.1.2.3. Communication models

12.1.2.3.1. active

12.1.2.3.2. effective

12.1.2.3.3. Feedback

12.1.2.3.4. Nonverbal

12.1.2.3.5. Paralingual

12.1.2.3.6. Communication blockers

12.1.2.4. Communication methods

12.1.2.4.1. Informal

12.1.2.4.2. Formal

12.1.2.5. Meetings

12.1.3. Outputs

12.1.3.1. Communications management plan

12.1.3.2. Project documents updates

12.2. Manage communication

12.2.1. Inputs

12.2.1.1. Communications management plan

12.2.1.2. Work performance reports

12.2.1.3. EEF - Entreprise environmental factors

12.2.1.4. OPA - Organizational process assets

12.2.2. Tools and techniques

12.2.2.1. Communication technology

12.2.2.2. Communication models

12.2.2.2.1. active

12.2.2.2.2. effective

12.2.2.2.3. Feedback

12.2.2.2.4. Nonverbal

12.2.2.2.5. Paralingual

12.2.2.2.6. Communication blockers

12.2.2.3. Communication methods

12.2.2.3.1. Informal

12.2.2.3.2. Formal

12.2.2.4. Information management systems

12.2.2.5. Performance reporting

12.2.3. Outputs

12.2.3.1. Project communications

12.2.3.2. Project management plan updates

12.2.3.3. Project documents updates

12.2.3.4. Organizational process assets updates

12.3. Control communications

12.3.1. Inputs

12.3.1.1. Project management plan

12.3.1.2. Project communications

12.3.1.3. Issue log

12.3.1.4. Work performance data

12.3.1.5. OPA - Organizational process assets

12.3.2. Tools and techniques

12.3.2.1. Information management systems

12.3.2.2. Expert judgment

12.3.2.3. Meetings

12.3.3. Outputs

12.3.3.1. Work performance information

12.3.3.2. Change requests

12.3.3.3. Project management plan updates

12.3.3.4. Project documents updates

12.3.3.5. Organizational process assets updates

13. Risk

13.1. Plan risk management

13.1.1. Inputs

13.1.1.1. Project management plan

13.1.1.2. Project charter

13.1.1.3. Stakeholder register

13.1.1.4. EEF - Entreprise environmental factors

13.1.1.5. OPA - Organizational process assets

13.1.2. Tools and techniques

13.1.2.1. Analytical techniques

13.1.2.2. Expert judgment

13.1.2.3. Meetings

13.1.3. Outputs

13.1.3.1. Risk management plan

13.2. Identify risks

13.2.1. Inputs

13.2.1.1. 1. Risk management plan

13.2.1.2. 2. Cost management plan

13.2.1.3. 3. Schedule management plan

13.2.1.4. 4. Quality management plan

13.2.1.5. 5. Human resource management plan

13.2.1.6. 6. Scope baseline

13.2.1.7. 7. Activity cost estimates

13.2.1.8. 8. Activity duration estimates

13.2.1.9. 9. Stakeholder register

13.2.1.10. 10. Project documents

13.2.1.11. 11. Procurement documents

13.2.1.12. 12. EEF - Entreprise environmental factors

13.2.1.13. 13. OPA - Organizational process assets

13.2.2. Tools and techniques

13.2.2.1. Documentation reviews

13.2.2.2. Information gathering techniques

13.2.2.3. Checklist analysis

13.2.2.4. Assumptions analysis

13.2.2.5. Diagramming techniques

13.2.2.6. SWOT

13.2.2.7. Expert judgment

13.2.3. Outputs

13.2.3.1. Risk register

13.3. Perform quantitative risk analysis

13.3.1. Inputs

13.3.1.1. Risk management plan

13.3.1.2. Scope baseline

13.3.1.3. Risk register

13.3.1.4. EEF - Entreprise environmental factors

13.3.1.5. OPA - Organizational process assets

13.3.2. Tools and techniques

13.3.2.1. Risk probability and impact assessment / probability and impact matrix

13.3.2.2. Risk data quality assessment

13.3.2.3. Risk categorization

13.3.2.4. Risk urgency assessment

13.3.2.5. Expert judgment

13.3.3. Outputs

13.3.3.1. Project document updates

13.4. Perform qualitative risk analysis

13.4.1. Inputs

13.4.1.1. Risk management plan

13.4.1.2. Cost management plan

13.4.1.3. Schedule management plan

13.4.1.4. Risk register

13.4.1.5. EEF - Entreprise environmental factors

13.4.1.6. OPA - Organizational process assets

13.4.2. Tools and techniques

13.4.2.1. Data gathering and representation techniques

13.4.2.1.1. Interviewing

13.4.2.1.2. Probability distributions

13.4.2.2. Quantitative risk analysis and modeling techniques

13.4.2.2.1. Sensitivity analysis

13.4.2.2.2. Expected monetary value analysis

13.4.2.2.3. Decision tree analysis

13.4.2.2.4. Tornado diagrams

13.4.2.2.5. Modeling and simulation (Monte Carlo)

13.4.2.3. Expert judgment

13.4.3. Outputs

13.4.3.1. Project document updates

13.5. Plan risks responses

13.5.1. Inputs

13.5.1.1. Risk management plan

13.5.1.2. Risk register

13.5.2. Tools and techniques

13.5.2.1. Strategies for negative risks or threats

13.5.2.1.1. Avoid

13.5.2.1.2. Transfer

13.5.2.1.3. Mitigate

13.5.2.1.4. Accept

13.5.2.2. Strategies for positive risks or opportunities

13.5.2.2.1. Exploit

13.5.2.2.2. Share

13.5.2.2.3. Enhance

13.5.2.2.4. Accept

13.5.2.3. Contingent response strategies

13.5.2.4. Expert judgment

13.5.3. Outputs

13.5.3.1. Project document updates

13.5.3.2. Project management plan updates

13.6. Control risks

13.6.1. Inputs

13.6.1.1. Project management plan

13.6.1.2. Risk register

13.6.1.3. Work performance data

13.6.1.4. Work performance reports

13.6.2. Tools and techniques

13.6.2.1. Risk reassessment

13.6.2.2. Risk audits

13.6.2.3. Variance and trends analysis

13.6.2.4. Technical performance measurement

13.6.2.5. Reserve analysis

13.6.2.6. Meetings

13.6.3. Outputs

13.6.3.1. Work performance information

13.6.3.2. Change requests

13.6.3.3. Project document updates

13.6.3.4. Project management plan updates

13.6.3.5. Organizational process assets updates

14. Procurement

14.1. Plan procurement management

14.1.1. Inputs

14.1.1.1. 1. Project management plan

14.1.1.2. 2. Requirements documentation

14.1.1.3. 3. Risk register

14.1.1.4. 4. Activity resource requirements

14.1.1.5. 5. Project schedule

14.1.1.6. 6. Activity cost estimates

14.1.1.7. 7. Stakeholders register

14.1.1.8. 8. EEF - Entreprise environmental factors

14.1.1.9. 9. OPA - Organizational process assets

14.1.2. Tools and techniques

14.1.2.1. Make-or-buy analysis

14.1.2.2. Expert judgment

14.1.2.3. Market research

14.1.2.4. Meetings

14.1.3. Outputs

14.1.3.1. 1. Procurement management plan

14.1.3.2. 2. Procurement statement of work

14.1.3.3. 3. Procurement documents

14.1.3.4. 4. Source selection criteria

14.1.3.5. 5. Make-or-buy decisions

14.1.3.6. 6. Change requests

14.1.3.7. 7. Project documents updates

14.2. Conduct procurement

14.2.1. Inputs

14.2.1.1. 1. Procurement management plan

14.2.1.2. 2. Procurement documents

14.2.1.3. 3. Source selection criteria

14.2.1.4. 4. Seller proposals

14.2.1.5. 5. Project documents

14.2.1.6. 6. Make-or-buy decisions

14.2.1.7. 7. Procurement statement of work

14.2.1.8. 8. OPA - Organizational process assets

14.2.2. Tools and techniques

14.2.2.1. Bidder conference

14.2.2.2. Proposal evaluation techniques

14.2.2.3. Independant estimates

14.2.2.4. Expert judgment

14.2.2.5. Advertising

14.2.2.6. Analytical techniques

14.2.2.7. Procurement negociations

14.2.3. Outputs

14.2.3.1. Selected sellers

14.2.3.2. Agreements

14.2.3.3. Resources calendars

14.2.3.4. Change requests

14.2.3.5. Project management plan updates

14.2.3.6. Project documents updates

14.3. Control procurements

14.3.1. Inputs

14.3.1.1. Procurement management plan

14.3.1.2. Procurement documents

14.3.1.3. Agreements

14.3.1.4. Approved change requests

14.3.1.5. Work performance reports

14.3.1.6. Work performance data

14.3.2. Tools and techniques

14.3.2.1. Contract change control system

14.3.2.2. Procurement performance reviews

14.3.2.3. Inspections and audits

14.3.2.4. Performance reporting

14.3.2.5. Payment systems

14.3.2.6. Claims administration

14.3.2.7. Record management system

14.3.3. Outputs

14.3.3.1. Work performance info

14.3.3.2. Change requests

14.3.3.3. Project management plan updates

14.3.3.4. Project documents updates

14.3.3.5. Organizational process assets updates

14.4. Close procurement

14.4.1. Inputs

14.4.1.1. Project management plan

14.4.1.2. Procurement documents

14.4.2. Tools and techniques

14.4.2.1. Procurement audits

14.4.2.2. Procurement negociations

14.4.2.3. Records management system

14.4.3. Outputs

14.4.3.1. Closed procurements

14.4.3.2. Organizational process assets updates

15. Stakeholder

15.1. Identify stakeholders

15.1.1. Inputs

15.1.1.1. Project charter

15.1.1.2. Procurement documents

15.1.1.3. EEF - Entreprise environmental factors

15.1.1.4. OPA - Organizational process assets

15.1.2. Tools and techniques

15.1.2.1. Stakeholder analysis

15.1.2.2. Expert judgment

15.1.2.3. Meetings

15.1.3. Outputs

15.1.3.1. Stakeholder register

15.2. Plan stakeholders management

15.2.1. Inputs

15.2.1.1. Project management plan

15.2.1.2. Stakeholder register

15.2.1.3. EEF - Entreprise Environmental factors

15.2.1.4. OPA - Organizational process assets

15.2.2. Tools and techniques

15.2.2.1. Expert judgement

15.2.2.2. Meetings

15.2.2.3. Analytical techniques

15.2.3. Outputs

15.2.3.1. Stakeholder management plan

15.2.3.2. Project documents updates

15.3. Manage stakeholders engagement

15.3.1. Inputs

15.3.1.1. Stakeholder management plan

15.3.1.2. Communications management plan

15.3.1.3. Change log

15.3.1.4. OPA - Organizational process assets

15.3.2. Tools and techniques

15.3.2.1. Communication methods

15.3.2.2. Interpersonal skills

15.3.2.3. Management skills

15.3.3. Outputs

15.3.3.1. Issue log

15.3.3.2. Change requests

15.3.3.3. Project management plan updates

15.3.3.4. Project documents updates

15.3.3.5. Organizational process assets

15.4. Control stakeholder engagement

15.4.1. Inputs

15.4.1.1. Project management plan

15.4.1.2. Issue log

15.4.1.3. Work performance data

15.4.1.4. Project documents

15.4.2. Tools and techniques

15.4.2.1. Information management systems

15.4.2.2. Expert judgement

15.4.2.3. Meetings

15.4.3. Outputs

15.4.3.1. Work performance info

15.4.3.2. Change requests

15.4.3.3. Project management plan updates

15.4.3.4. Project document updates

15.4.3.5. Organizational process assets updates