1. Wood Floors
2. Girl's room
2.1. Fix walls
2.1.1. Fix ceiling
2.1.1.1. Remove mildew
2.1.1.2. scrape
2.1.1.3. paint
2.1.2. Fix walls
2.1.2.1. remove chair wall wallpaper
2.1.2.2. fill holes
2.1.2.3. Wash walls well ? mold near floor
2.2. Wood floors
2.3. Closet
2.4. Blinds
3. Living Room
3.1. Replace Exterior Door
3.2. Decor
3.2.1. Display my dads flag
3.2.2. Photo wall
3.2.2.1. Take down
3.2.3. Generic artwork on wall by girl’s room
3.3. Entrance way
3.3.1. Bench with storage
3.4. Love Seat to replace recliners
3.5. Sound system
3.5.1. Mount
3.5.2. Instructions
4. Kitchen
4.1. Table
4.1.1. Replace lamp over kitchen table
4.1.2. Replace table & chairs
4.1.3. Tighten legs
4.2. Buy and install new light over cupbards
4.3. General
4.3.1. Fix the exhaust fan on the stove
4.3.2. Get more
4.3.2.1. medium plates
4.4. Cabinets
4.4.1. Organize spices
4.4.2. Magnet knife rack
4.5. Counter
4.5.1. Fix counter island counter-top delamination
4.5.1.1. sand or grind off the mildew on cutting board
4.6. Redo whole kitchen
4.7. Floor
4.7.1. Scrub
4.7.1.1. regularly
4.7.1.1.1. define regularly...
4.8. Box up china
4.9. Sliding glass door
4.9.1. Replace
4.9.2. Room darkening blinds
4.10. Add a fridge shelf
4.11. Sink
4.11.1. Kitchen sink under shelves
5. Outside
5.1. Front
5.1.1. Porch/steps
5.1.1.1. Paint 2nd coat
5.1.1.1.1. Tucker To Do List
5.1.1.2. Add fill to base of steps to make the last step less of a drop off.
5.1.2. Replace motion-sensor light
5.1.3. Trim trees
5.1.4. landscape
5.1.5. driveway
5.1.5.1. level it
5.1.5.2. pave it
5.1.5.3. Driveway drainage
5.1.5.3.1. Lake Clarke
5.1.5.4. Bump at end of driveway
5.1.5.5. jklnklj
5.1.6. Shed
5.1.6.1. Fix shed door latch
5.2. House
5.2.1. replace siding
5.2.1.1. gutters
5.2.1.2. soffets
5.2.1.2.1. near boy's room
5.2.2. Roof
5.2.2.1. Shovel
5.2.2.2. Fix leaking water off the roof onto the front steps
5.2.2.2.1. Tucker To Do List
5.3. Back
5.3.1. Remove soffits and rodent nest
5.3.2. build deck
5.3.3. new back door
5.3.4. Safe level steps to get outside
5.3.5. replace sliding glass door
5.3.5.1. Tucker To Do List
5.3.6. Brush mower
6. Basement
6.1. Rent out as apartment
6.1.1. Dricore subfloor to allow drainage
6.2. Clean out
6.2.1. Old bedroom emptied
6.2.2. ? tear down bedroom walls and trash ASAP
6.2.3. Label and dates totes and boxes
6.3. Add more hooks for bags in stairwell
6.4. New Recyclables Containers
6.5. Replace ducts
7. General
7.1. Color Key
7.1.1. These are items we need to do when we have the money
7.1.2. These don't take much, if any, money. We can do them when we have the time.
7.1.3. Next Action
7.2. Inbox
7.3. replace network wiring
7.4. Wood floors in all rooms except for baths and closets
7.5. Parts & Pieces web site
7.6. Purging Process
7.6.1. Use
7.6.1.1. When was the last time we used it?
7.6.2. Identification
7.6.2.1. What is this?
7.6.3. Sentimental?
7.6.4. Do we think we'll use it in the next six months?
7.6.5. Disposition options
7.6.5.1. Keep
7.6.5.1.1. Store
7.6.5.1.2. Leave for renter use
7.6.5.1.3. Pack
7.6.5.2. Get rid of
7.6.5.2.1. Give away
7.6.5.2.2. Sell it
7.6.5.2.3. Gift
7.6.5.2.4. Recycle
7.7. Rent the House
7.7.1. Long Term Rental
7.7.1.1. Tenant To Do List
7.7.1.1.1. Dump
7.7.1.1.2. Empty dehumidifier water
7.7.2. Short Term Rental
8. Master Bedroom
8.1. Bathroom
8.1.1. Finish it
8.1.1.1. Missing trim
8.1.2. Toilet/shower
8.1.2.1. Scrape and redo our bathroom ceiling
8.1.2.1.1. date?
8.1.2.2. new curtain
8.1.2.2.1. not plastic
8.1.2.3. new toilet seat
8.1.3. Sink area
8.1.3.1. new vanity not pedastal
8.1.4. Toilet
8.1.4.1. Toilet seat shifts
8.1.4.2. Dual flush toilet
8.1.5. Permanent baseboard heater
8.1.6. Tighten door
8.2. Restore to just a bedroom? No multi-use?
8.3. Closet
8.3.1. Reorganize Closet
8.3.2. Closet light string
8.4. Organize my clothes better
8.4.1. Wall hooks
8.5. Blinds
8.6. Flooring
9. Laundry Room
9.1. Organize it
9.1.1. Organize tools
9.1.2. Replace cabinets with shelves and clear containers
9.1.2.1. Tucker To Do List
9.2. Sound proof
9.2.1. So we don't hear the furnace, washer & dryer
10. Kid's bathroom
10.1. replace fan
10.1.1. Watch You tube video
10.1.1.1. Buy fan in install
10.1.1.1.1. then scrape ceiling
10.1.2. Possible replacement unit. It looks like it.
10.1.3. Photo of sticker from the current fan
10.2. Redo walls
10.2.1. fix wallboard / peeling paper
10.2.1.1. fix wall board, paint or paper and paint
10.2.2. Closet space new or paint doors ? new knobs
10.2.3. Fix wallboard
10.3. Re-do flooring
10.4. Tighten sink faucet
10.4.1. Tucker To Do List
10.5. Move plug outlet over sink and secure it
10.6. New mirror over the sink that is solid
10.7. Toilet paper dispenser
10.8. Tucker To Do List
10.9. Replace medicine cabinet
10.10. Replace tub and shower
10.11. ? over toilet storage that replaces what the mirror is storing
10.12. Kids Bathroom
11. Boy's room
11.1. Heat
11.1.1. We turn the heat down to 50. But if you're here, feel free to turn it up to whatever temperature is comfortable for you. The thermostat is in the hallway.
11.1.2. We typically cover up the floor force hot air registers with a book in the rooms that we're not using. So you might have to uncover and then recover what you need.
11.1.3. There is also a space heater in the master bathroom. Feel free to use that. Whatever works.
11.2. I ran out of time. You might want to just go into the shed and scope it out and look on the shelves and the walls, etc and look for any tools that you might possibly be able to use.
11.3. Stuff stored in the room
11.3.1. Pack into girls room. DONE
11.3.2. Overflow in Living Room. DONE
11.4. Prep
11.4.1. No need to protect carpet.
11.4.2. Remove trim. DONE
11.4.2.1. Label so you know where it goes when you’re ready to put it back. DONE
11.5. Walls
11.5.1. Wallboard
11.5.1.1. Holes
11.5.1.1.1. Patch
11.5.1.1.2. Check existing patching
11.5.1.1.3. Some may need sanding
11.5.1.1.4. Big holes will need patches cut from drywall
11.5.1.2. Seams
11.5.1.2.1. Remove any remaining strips
11.5.1.2.2. Tape
11.5.1.2.3. Mud
11.5.1.2.4. Sand
11.5.2. Paint
11.5.2.1. Two coats
11.5.2.2. Off White
11.5.3. Electrical Outlets
11.5.3.1. Replace with regular (not cheap manufactured home quality) stuff
11.5.3.2. Breaker is just inside back door.
11.6. Ceiling
11.6.1. Just repair rodent hole in the corner
11.7. Flooring
11.7.1. Resources
11.7.1.1. Article
11.7.1.1.1. Tools you need and why
11.7.1.2. Video
11.7.1.2.1. Great overview of the process
11.7.1.2.2. Excellent, detailed run through
11.7.2. Issues
11.7.2.1. Relative thickness of old boards vs. new boards
11.7.2.2. Aclimate boards to room temperature
11.7.2.2.1. two days
11.7.2.2.2. Turn heat up to 70
11.7.2.2.3. Remember to turn it back down to 50 when you leave
11.7.2.3. Direction of the planks
11.7.2.3.1. Same direction as the living room
11.7.2.4. Baseboards
11.7.2.4.1. Buy some.
11.7.2.4.2. Nails
11.7.2.5. Quarter Round?
11.7.2.5.1. We didn't add this to the LR.
11.7.2.5.2. Skip this idea.
11.7.2.5.3. Nevermind.
11.7.2.6. Waste
11.7.3. Tools
11.7.3.1. Need
11.7.3.1.1. Knee Pads
11.7.3.1.2. Jig Saw
11.7.3.1.3. Rubber Mallet
11.7.3.1.4. Tapping Block
11.7.3.1.5. Pull Bar
11.7.3.1.6. Tape Measure
11.7.3.1.7. Pencil
11.7.3.1.8. Square
11.7.3.1.9. Sliding T-Bevel
11.7.3.1.10. Drill
11.7.3.1.11. Bit
11.7.3.1.12. Crow Bar
11.7.3.1.13. Gloves
11.7.3.1.14. Eye Protection
11.7.3.1.15. Vacuum
11.7.3.1.16. Spacers
11.7.3.1.17. Broom
11.7.3.1.18. Dust Pan
11.7.3.1.19. Masking Tape
11.7.3.1.20. Hammer
11.7.3.1.21. Floor scraper
11.7.3.1.22. Respirator / mask
11.7.3.1.23. Stud Finder
11.7.3.2. It would be nice
11.7.3.2.1. Miter saw
11.7.3.2.2. Oscillating Tool
11.7.3.2.3. Nail Gun
11.7.3.3. Maybe
11.7.3.3.1. Tape for underlayment joining if tape isn't built into the underlayment we ordered
11.7.3.3.2. Long level
11.7.3.3.3. Belt Sander
11.7.3.3.4. Folding Table
11.7.3.3.5. Task Lights with clip
11.7.4. Materials Ordered
11.7.4.1. Amazon
11.7.4.1.1. Install Kit
11.7.4.2. Lumber Liquidators
11.7.4.2.1. Flooring
11.7.4.2.2. Underlayment (pad)
11.7.4.2.3. Transition Piece
11.7.5. Remove / demo
11.7.5.1. Carpet
11.7.5.2. Staples and nails
11.7.5.3. Smooth out press board subfloor
11.7.6. Lumber Liquidators
11.7.6.1. Pick up flooring materials
11.7.6.2. Receipt of our order
11.7.6.3. Should be in by end of January
11.7.7. Install underlayment pad
11.7.8. Install laminate wood flooring
11.7.8.1. Simulated planks should be in the same direction as the simulated planks in the living room and kitchen
11.8. Closet
11.8.1. Install double doors
11.8.1.1. Source from Parts & Pieces
11.8.2. Keep flooring
11.9. Trim
11.9.1. Reinstall
11.10. Hallway
11.10.1. Same approach as Boy’s room
11.10.2. Walls & flooring