Laten we beginnen. Het is Gratis
of registreren met je e-mailadres
A1 Planning Door Mind Map: A1 Planning

1. Appendix

1.1. new materials

1.1.1. consumption data predecessor

1.1.2. automatic assignment of forecasting profile

1.2. Determining the Products to be Planned in SAP APO

1.3. Forecast Based Planning

1.4. Discussing optimum lot sizing procedure

2. Overview & general

2.1. Motivation

2.2. Preliminary requirements

2.3. scheduling of planning / overview

3. Forecsting process

3.1. Consumption data

3.1.1. General

3.1.2. Mapping rule for consumption data

3.1.3. Extrapolation

3.2. Forecasting

3.2.1. Forecast profile Maintenance and Assignment

3.2.2. Forecast Model selection - Automatic Model selection

3.2.3. Evaluating: material was “well” forecasted

3.2.3.1. General

3.2.4. Forecasting run

3.3. Forecast & Safety stock & reorder point

3.3.1. Service Level Determination at A1

3.4. Zmp33

3.4.1. Selection mask for forecast evaluation

3.4.2. Layout Result Screen

3.4.2.1. General

3.4.2.2. Data Sources from the fields

3.4.3. Functions

3.4.3.1. function in Result - Set Worked on Flag

3.4.3.2. function in Result - Show Forecast

3.4.3.3. function in Result - Show History

3.4.3.4. function in Result book marked materials

3.4.3.5. Function Customizing Table automatically taking over reorder point from forecast into marc

3.4.3.6. function in Result Table - Change Reorder point.

3.4.3.7. Display in result list - Calc Coverage

3.4.3.8. mass Update Material

4. MRPprocess

4.1. General Problem described in workshops

4.2. Chosen planning procedures

4.3. Combinations MRP process and Lot sizes

4.4. Lot-Sizing Procedures

4.4.1. Lot-Sizing Generally

4.4.2. A1 specific Replenish up to maximum stock level