SAFe - Develop on Cadence, Release on demand

Laten we beginnen. Het is Gratis
of registreren met je e-mailadres
SAFe - Develop on Cadence, Release on demand Door Mind Map: SAFe - Develop on Cadence, Release on demand

1. Inspect and Adapt

1.1. PI System Demo

1.2. Quantitative and Qualitative Measurement

1.2.1. ART predictability Measurement

1.3. The problem-Solving Workshop

1.3.1. the 5 Whys

1.3.2. Analyze root-causes

1.3.3. Next Lesson - Devops and Continuous Delivery Pipeline

2. Innovation and Planning iteration

2.1. Advantages

2.1.1. Warning

2.2. Example of IP iteration calendar

3. A program Kanban for managing the flow

4. ART events driving the train - A closed-looped system

5. The ART Sync for coordinating progress

5.1. SoS : Scrum of Scrum

5.2. PO Sync

6. System Demo

6.1. Demo the full System