SM-Smart Building by Mind Map: SM-Smart Building

1. Mo-Mobilization

1.1. Demolition

1.2. Disposal

1.3. Site clearance

1.4. Fixing Fences

1.5. Crane installation

1.5.1. Foundation

1.5.2. Crane Erection

1.5.2.1. Horizontal Leveling

1.5.2.2. Vertical Leveling

1.6. Cravans installation

1.7. Mixing plant installation

2. CW-Construction Works

2.1. EW-Earthwork

2.1.1. Soil work

2.1.1.1. Part 1

2.1.1.1.1. Excavation

2.1.1.1.2. Replacement

2.1.1.1.3. Dewatering

2.1.1.2. Part 2

2.1.1.2.1. Excavation

2.1.1.2.2. Replacement

2.1.1.2.3. Dewatering

2.1.2. Retaining work

2.1.2.1. Diaphrams

2.1.2.2. Anchors

2.1.2.2.1. Installation

2.1.2.2.2. Released

2.1.2.3. Struts

2.1.2.3.1. Installation

2.1.2.3.2. Uninstallation

2.2. FW-Foundation Work

2.2.1. Part 1

2.2.1.1. Upper Raft

2.2.1.2. Concrete

2.2.1.3. Insulation

2.2.2. Part 2

2.2.2.1. Lower Raft

2.2.2.2. Concrete

2.2.2.3. Insulation

2.3. CIW-Civil Works

2.3.1. Concrete

2.3.1.1. Part 1

2.3.1.1.1. Basement

2.3.1.1.2. Floors

2.3.1.1.3. Roof

2.3.1.2. Part 2

2.3.1.2.1. Basement

2.3.1.2.2. Floors

2.3.1.2.3. Roof

2.3.2. Steel

2.3.2.1. Part 1

2.3.2.1.1. Floors

2.3.2.1.2. Roof

2.3.2.2. Part 2

2.3.2.2.1. Floors

2.3.2.2.2. Roof

2.3.3. Tank

2.4. MEP-MEP Works

2.4.1. Mechanical Works

2.4.1.1. Part 1

2.4.1.1.1. Soil,waste,vent and storm water Systems

2.4.1.2. Part 2

2.4.1.2.1. Soil,waste,vent and storm water Systems

2.4.2. Plumbing Works

2.4.2.1. Part 1

2.4.2.1.1. Underground Submersible Sump Pump Systems

2.4.2.2. Part 2

2.4.2.2.1. Underground Submersible Sump Pump Systems