Hydrocarbon Management Committee Structure

Get Started. It's Free
or sign up with your email address
Hydrocarbon Management Committee Structure by Mind Map: Hydrocarbon Management Committee Structure

1. HMC

1.1. Projects

1.1.1. HM 0 - HM Terms and Definitions

2. HMC-1, Upstream

2.1. Projects

2.1.1. HM1803, Determination of recalibration intervals for fiscal metering measurements

2.1.2. HM 8, Continuous Density Measurement

2.1.3. HM 25, Guidelines for Assessment of Uncertainty in The Oil and Gas Industry (Previously Statistics for Static and Dynamic Measurement)

2.1.4. HM 26, A Guide to Liquid Metering Systems

2.1.5. HM 53, Guidelines for the management of measurement of emissions streams associated with trading and discharges in offshore UKCS

2.1.6. HM 54, Guidelines for The Management of Measurement for The Upstream Oil and Gas Industry

2.1.7. HM 56, Continuous on-line measurement of water content in petroleum (crude oil and condensate)

2.1.8. HM 58, Guidelines for determination of flare quantities from upstream oil and gas facilities

2.1.9. HM 60, Guidelines for The Auditing of Measurement Systems For Oil and Gas Streams

2.1.10. HM 71, Produced Water Metering and Analysis

2.1.11. HM 75, A guide to uncertainty of measurement in the oil and gas industry

2.1.12. HM 78, Meter Selection

2.1.13. HM 86, Offshore Loading

2.1.14. HM 96, Guidelines for The Allocation of Fluid Streams in Oil and Gas Production Operations

2.1.15. HM, 27 A Guide to Gas Metering Systems

3. HMC-2, Refineries and downstream distribution

3.1. Projects

3.1.1. HM 2, Tank Calibration. Section 1: Strapping, Internal Diameter and Internal Offset Methods for The Calibration of Vertical Cylindrical Tanks

3.1.2. HM 3, Tank Calibration. Section 7: Calibration of Underground Tanks at Filling Stations

3.1.3. HM 9, Meters. Section 3: Guidance Notes on The Installation of Turbine Meters on Loading Gantries

3.1.4. HM 10, Meter Proving. Section 1: Field Guide to Proving Meters with A Pipe Prover

3.1.5. HM 11, Code of practice for the proving of metering systems on Road/rail petroleum loading gantries

3.1.6. HM 12, Meter proving. Section 3: Code of practice for the design, installation and calibration of pipe provers

3.1.7. HM 13, Meter Proving. Section 4: Recommended UK practice for testing, operating & maintaining road tanker metering systems

3.1.8. HM 20, Proving of aviation fuelling positive displacement meters

3.1.9. HM 31, Guide to Hydrocarbon Management in Petroleum Refinery Operations

3.1.10. HM 32, Guide to Product Hydrocarbon Management at Petroleum Product Marketing and Distribution Terminals

3.1.11. HM 34, List of Data Required for A Comprehensive Evaluation of A Liquid Flowmeter

3.1.12. HM 39, A Guide to Recommend Measurement Practice for Compliance with The Requirements of HMRC Notice 179

3.1.13. HM 45, Statistical Control of Measuring Instruments Using Control Charts - Simplified Method

3.2. HMC 2A, Refineries database

4. HMC-4, Oil transportation

4.1. Projects

4.1.1. HM 40, Guidelines for The Crude Oil Washing of Ships' Tanks and The Heating of Crude Oil Being Transported by Sea

4.1.2. HM 49, Vessels Experience Factor

4.1.3. HM 50, Guidelines for The Cleaning of Tanks and Lines For Marine Tank Vessels Carrying Petroleum and Refined Products

4.1.4. HM 59, Rail Car Cleaning Guidance

4.1.5. HM 64, Guidelines for Cargo Analysis and Reconciliation of Cargo Quantities

4.1.6. HM 65, Atmospheric Hydrocarbon Emissions from Marine Vessel Transfer Operations

4.1.7. HM 67, Guidelines for The Introduction of Additives to Bulk Liquid Cargoes,

4.1.8. HM 69, Measurement of H2S In Tank Headspaces

4.1.9. HM 70, Determining Fullness of Pipelines for Custody Measurement

4.1.10. HM 79, Shore Tank Guide

4.1.11. HM 86, Offshore Loading

4.1.12. HM 92, Model Plans for Manual Sampling of Petroleum

4.1.13. IP475, Manual Sampling

4.1.14. IP476, Automatic Sampling

4.2. HMC-4a, Marine crude oil

4.3. HMC-4b, Marine products database

5. Asian Forum

5.1. Projects

5.1.1. HM 66, Guidelines for Blending Petroleum Cargos

5.1.2. HM 67, Guidelines for The Introduction of Additives to Bulk Liquid Cargoes

6. General Terms and Conditions

6.1. Projects

6.1.1. HM 80, Model terms and conditions for free on board (FOB) sale and purchase of crude oil

6.1.2. HM 81, Model terms and conditions for CIF/CFR sale and purchase of crude oil

6.1.3. HM 82, Model terms and conditions for free on board (FOB) sale and purchase of hydrocarbon products

6.1.4. HM 83, Model terms and conditions for CIF/CFR sale and purchase of hydrocarbon products

7. HMC-3, Independent inspection

7.1. Projects

7.1.1. HM 1 Part 1, Calculation of Oil Quantities - Static

7.1.2. HM 1 Part 2, Calculation of Oil Quantities - Dynamic

7.1.3. HM 4, Manual level measurement for hydrocarbon liquids

7.1.4. HM 6, General guidelines to test methods for sulfur determination

7.1.5. HM 21, Static and Dynamic Measurement of Light Hydrocarbon

7.1.6. HM 28, Procedures for Crude Oil Cargo Inspections

7.1.7. HM 29, Procedures for petroleum product cargo inspections

7.1.8. HM 30, Procedures for liquefied petroleum gas (LPG) cargo inspections

7.1.9. HM 43, Temperature Corrections in Tank Calibration and Gauging

7.1.10. HM 51, Procedures for bulk liquid chemical cargo inspections

7.1.11. HM 52, Measurement and sampling of cargoes on board tank vessels using closed and restricted equipment

7.1.12. HM 55, Measurement of Refrigerated and/or Pressurized Cargoes on Board Marine Gas Carries. Liquefied Petroleum and Chemical Gases

7.1.13. HM 57, Guidelines for the cleaning of tanks and lines for inland waterway barges carrying petroleum and refined products in accordance with ADN/CDNI

7.1.14. HM 59, Rail Car Cleaning Guidance

7.1.15. HM 62, Guidelines for cargo inspection order management

7.1.16. HM 68, Procedures for Bulk Liquid Fatty Acid Methyl Esters (FAME) And Blended Biodiesel Cargo Inspections

7.1.17. HM 86, Offshore Loading

7.1.18. HM 92, Model Plans for Manual Sampling of Petroleum

7.1.19. HM 93, A guide to manual sampling of hydrocarbon liquids

7.1.20. HM 95, Guidelines for Marine Petroleum Cargo Superintendents

7.1.21. IP200, Guidelines for The Use of The Petroleum Measurement Tables

7.1.22. IP475, Manual Sampling

7.1.23. IP476, Automatic Sampling

8. Click button below each sub-committee to see which projects they are responsbile for