LEAN OPERATION -system operation that uses fewer resources -focused on eliminating waste
by sin scent
1. GOALS
1.1. Ultimate goal -Balanced rapid flow
1.2. Supporting goal -eliminate disruption and waste -flexible systems
2. WASTE
2.1. 7 waste -Overproduction -Waiting -Unnecessary transportation -Inefficient processing -Inventory -Inefficient work method -Product defects
3. LEAN BUILDING BLOCKS
3.1. Process design
3.2. Product design
3.3. Personnel/ organizations elements
3.4. Manufacturing planning and control
4. BASIC ELEMENTS
4.1. Waste reduction
4.2. Excellent and contionous improvement
4.3. Demand driven
5. JUST IN TIME (JIT)
5.1. -highly coordinated processing system
5.2. Pull system - supplies and components pulled through system