Get Started. It's Free
or sign up with your email address
BEM by Mind Map: BEM

1. Calvin Mak

1.1. Godzilla

1.1.1. Hood Modification

1.1.1.1. Discussion

1.1.1.2. Drawing

1.1.2. Font pipe in from Hopper

1.1.2.1. Discussion

1.1.2.2. Drawing

1.1.3. Scrubber Patching

1.1.3.1. Observe

1.1.3.1.1. Determine patch

1.1.3.1.2. Prepare resources

1.2. BEM Room

1.2.1. Check Lights

1.2.1.1. Determine breaker loc

1.2.2. Clear Racks

1.2.2.1. Throw all unwanted

1.2.2.2. Rearrange racks

1.3. BEM Corner

1.3.1. Area Cleaning

1.3.1.1. Clear

1.3.1.2. Sweep & Throw

1.3.2. Reorganize

1.4. Kiln

1.4.1. Put behind

1.4.1.1. Placed near fence

1.4.1.2. Cover with Canvas

1.4.2. Determine operation height

1.4.2.1. Fabricate Stand

1.4.2.2. Prepare rollers

1.5. Roof

1.5.1. Address Leakage

1.5.1.1. Call in contractors

1.5.2. Remove dropping insulator

1.5.2.1. To schedule

1.6. Lights

1.6.1. Put up balance Light

1.6.1.1. Warehouse

1.6.1.2. Cat-con Area

1.6.1.3. Metallica

1.6.1.4. SMUG

2. Arno

2.1. Freedom Mini

2.1.1. Test Ventilation Fans

2.1.2. Clear Ceiling

2.2. Toilet Ventilation

3. Maung Htay

3.1. Metallica

3.1.1. Compressor Relocation

3.1.1.1. Isolator buy

3.1.1.1.1. Isolator fix

3.1.1.1.2. Wire-up

3.1.1.2. Commence Shifting

3.1.1.2.1. Ask for 3h downtime

3.1.1.2.2. Reconnect air-line

3.1.2. Fume Hood

3.1.2.1. Finish up

3.1.2.1.1. Put in location

3.1.3. FP1

3.1.4. FP2

3.1.5. FP3

3.1.6. FP4

3.1.7. FP5 (New)

3.1.7.1. Buy hydraulic Oil

3.1.7.2. Determine connection (Electrical)

3.1.8. Water Pipe

3.1.8.1. Measure

3.1.8.1.1. Calculate resources

3.1.8.2. Determine timeline

3.1.8.2.1. Request downtime

3.1.9. Sumitomo Tanks

3.1.9.1. Build piping

3.1.9.2. Connect piping

3.1.10. ISO Tank

3.1.11. Eye wash/ Shower

3.1.11.1. Use IBC first

4. Karl

4.1. Metallica

4.1.1. Electrical Isolation

4.1.1.1. Auto wih HMI

4.1.1.2. Manual with Switches

4.1.2. FP

4.2. Godzilla

4.2.1. Indicator