Presentation
by Eman Elsefy
1. Metal escalation
1.1. Early procurement strategy
2. Switchgear
2.1. Delivery
2.2. Installation
3. Cables
3.1. Delivery
3.2. Installation
3.3. Testing
4. Transformer
4.1. Factory Acceptance Testing
4.2. Shipping
4.3. Transportation within the city (mobilization day), road closure Rees St, crane dance when lifting the transformer.
4.4. Jack and Slide system
4.5. Shoring system
4.6. Transformer final placement
4.7. Base plates
4.8. Parts and accessories
4.9. Transformer assembly
5. Testing and commissioning
6. Extra clips
6.1. Interviews
6.2. Do it right
7. Project Overview
7.1. Location: google maps
7.2. Take part of the Toronto Hydro video
7.3. Scope: Phase 2 B&M
7.4. Project Schedule
7.5. Design: transformer, SLD highlighted for Phase 2
8. Challenges
8.1. COVID, crate coming from Wuhan, China
8.2. Port of Toronto
8.3. Transformer Storage Challenges
8.4. Permits with TTC and the City of Toronto
8.5. Transformer weight
8.6. Design vs. Implementation: From design to actual (pictures/videos)
8.7. Ship incident: Damaged crates and the Fans to be repaired.