1. Pre-Construction
1.1. Site Analysis & Survey
1.1.1. Land survey
1.1.1.1. Soil test
1.1.1.1.1. Design & Planning
2. Foundation
2.1. Excavation
2.1.1. Excavation for strip foundation
2.1.1.1. renching for drainage
2.1.1.1.1. Formwork setup
3. Substructure
3.1. Block laying for foundation walls
3.1.1. Backfilling
3.1.1.1. Damp Proofing
3.1.1.1.1. Ground Floor Slab
4. Superstructure
4.1. Wall Construction
4.1.1. Install window and door frames
4.1.1.1. Install conduits Electrial & basic plumbing pipes
5. Roofing
5.1. Roof Truss Installation
5.1.1. Roof Covering
5.1.1.1. Install gutters & downpipes
6. Finishes
6.1. Plastering (Internal and External)
6.1.1. Painting
6.1.1.1. Floor (Screeding and Tiles)
6.1.1.1.1. Ceiling
7. Utilities and Services Installation
7.1. Socket and Switches
7.1.1. Lightening
7.1.1.1. Sanitary Fittings
7.1.1.1.1. Test Plumbing Systems
8. External Works
8.1. Landscaping (Grading, Leveling & Planting)
8.1.1. Paving & Driveways
8.1.1.1. Fencing & Gates
9. Post-Construction
9.1. Final Inspection & Approval
9.1.1. Handover