Project Plan - FREE project template

A plan provides a statement of how and when objectives are to be achieved, by showing the major products, activities and resources required for the scope of the plan. In PRINCE2, there are three levels of plan: project, stage and team. Team Plans are optional and may not need to follow the same composition as a Project Plan or Stage Plan.

Get Started. It's Free
or sign up with your email address
Project Plan - FREE project template by Mind Map: Project Plan - FREE project template

1. Schedule

1.1. This may include or reference graphical representations of the following:

1.1.1. Gantt or bar chart

1.1.2. Product breakdown structure

1.1.3. Product flow diagram

1.1.4. Activity Network

1.1.5. Table of resource requirements – by resource type (e.g. four engineers, one test manager, one business analyst)

1.1.6. Table of requested/assigned specific resources –by name (e.g. Nikki, Jay, Francesca)

1.1.7. The Schedule may also be in the form of a Product Checklist as shown below

1.1.8. Product Checklist

1.1.8.1. Product Identifier

1.1.8.1.1. [...]

1.1.8.2. Product Title

1.1.8.2.1. [...]

1.1.8.3. Product Description approved

1.1.8.3.1. Plan

1.1.8.3.2. Actual

1.1.8.4. Draft Ready

1.1.8.4.1. Plan

1.1.8.4.2. Actual

1.1.8.5. Final Quality Check completed

1.1.8.5.1. Plan

1.1.8.5.2. Actual

1.1.8.6. Approved

1.1.8.6.1. Plan

1.1.8.6.2. Actual

1.1.8.7. Handed Over (if applicable)

1.1.8.7.1. Plan

1.1.8.7.2. Actual

2. Plan Description

2.1. [Include a brief description of what the plan encompasses (i.e. project, stage, team, exception) and the planning approach]

3. Plan Prerequistes

3.1. [Include any fundamental aspects that must be in place, and remain in place, for the plan to succeed]

4. External Dependencies

4.1. [Describe the external dependencies which may influence the plan]

5. Planning Assumptions

5.1. [Describe the planning assumptions upon which the plan is based]

6. Lessons Incorporated

6.1. [Detail relevant lessons from previous similar projects, which have been reviewed and accommodated within this plan]

7. Monitoring and Control

7.1. [Detail how the plan will be monitored and controlled]

8. Budgets

8.1. [Cover time and cost, including provisions for risks and changes]

9. Tolerances

9.1. [Document time, cost and scope tolerances for the level of plan (you may also include more specific stage- or team-level risk tolerances)]

10. Product Descriptions

10.1. [Cover the products within the scope of the plan (for the Project Plan this will include the project’s product; for the Stage Plan this will be the stage products; and for a Team Plan this should be a reference to the Work Package assigned). Define quality tolerances in each Product Description]

11. Sign-up to edit this map

12. Document information

12.1. Project Name

12.1.1. [name]

12.2. Date

12.2.1. [date]

12.3. Release

12.3.1. Draft/Final

12.4. Author

12.4.1. [author]

12.5. Owner

12.5.1. [owner]

12.6. Client

12.6.1. [client]

12.7. Document Number

12.7.1. [number]

12.8. Revision, Approvals & Distribution

12.8.1. Revision History

12.8.1.1. Revision # [....]

12.8.1.1.1. Revision Date

12.8.1.1.2. Previous Revision Date

12.8.1.1.3. Summary of Changes

12.8.1.1.4. Changes Marked

12.8.1.2. Revision # [....]

12.8.1.2.1. Revision Date

12.8.1.2.2. Previous Revision Date

12.8.1.2.3. Summary of Changes

12.8.1.2.4. Changes Marked

12.8.1.3. Revision # [....]

12.8.1.3.1. Revision Date

12.8.1.3.2. Previous Revision Date

12.8.1.3.3. Summary of Changes

12.8.1.3.4. Changes Marked

12.8.1.4. Date of next revision:

12.8.1.4.1. [....]

12.8.2. Approvals

12.8.2.1. Approval # [....]

12.8.2.1.1. Name

12.8.2.1.2. Signature

12.8.2.1.3. Title

12.8.2.1.4. Date of Issue

12.8.2.1.5. Version

12.8.2.2. Approval # [....]

12.8.2.2.1. Name

12.8.2.2.2. Signature

12.8.2.2.3. Title

12.8.2.2.4. Date of Issue

12.8.2.2.5. Version

12.8.2.3. Approval # [....]

12.8.2.3.1. Name

12.8.2.3.2. Signature

12.8.2.3.3. Title

12.8.2.3.4. Date of Issue

12.8.2.3.5. Version

12.8.3. Distribution

12.8.3.1. Distribution # [....]

12.8.3.1.1. Name

12.8.3.1.2. Title

12.8.3.1.3. Date of issue

12.8.3.1.4. Version

12.8.3.2. Distribution # [....]

12.8.3.2.1. Name

12.8.3.2.2. Title

12.8.3.2.3. Date of issue

12.8.3.2.4. Version

13. How to use this template

13.1. How to share this template with your team

13.1.1. Send an email

13.1.1.1. 1. Click Share this map

13.1.1.2. 2. Select Invite People

13.1.1.3. 3. Write a message

13.1.1.4. 4. Click Invite

13.1.2. Send a link

13.1.2.1. 1. Click Share this map

13.1.2.2. 2. Tick Link to share

13.1.2.3. 3. Copy the link to share it

13.1.3. Export

13.1.3.1. 1. Click down arrow, bottom right

13.1.3.2. 2. Select the export option you want

13.2. How to complete this template

13.2.1. Complete the sections in square brackets

13.2.1.1. [....]

13.2.2. Read these sections for help on this template

13.2.2.1. Purpose

13.2.2.2. Advice

13.2.3. Navigate using the links in Contents

13.2.3.1. Contents

13.3. Attribution

13.3.1. Copyright © AXELOS Limited 2009. All rights reserved. Material is reproduced with the permission of AXELOS

13.4. Get this template here

14. Overview

14.1. Purpose

14.1.1. A plan provides a statement of how and when objectives are to be achieved, by showing the major products, activities and resources required for the scope of the plan. In PRINCE2, there are three levels of plan: project, stage and team. Team Plans are optional and may not need to follow the same composition as a Project Plan or Stage Plan.

14.1.2. An Exception Plan is created at the same level as the plan that it is replacing.

14.1.3. A Project Plan provides the Business Case with planned costs, and it identifies the management stages and other major control points. It is used by the Project Board as a baseline against which to monitor project progress.

14.1.4. Stage Plans cover the products, resources, activities and controls specific to the stage and are used as a baseline against which to monitor stage progress.

14.1.5. Team Plans (if used) could comprise just a schedule appended to the Work Package(s) assigned to the Team Manager.

14.1.6. A plan should cover not just the activities to create products but also the activities to manage product creation - including activities for assurance, quality management, risk management, configuration management, communication and any other project controls required.

14.2. Contents

14.2.1. The Plan should cover the following topics.

14.2.2. Plan Description

14.2.3. Plan Prerequisites

14.2.4. External Dependencies

14.2.5. Planning Assumptions

14.2.6. Lessons Incorporated

14.2.7. Monitoring and Control

14.2.8. Budgets

14.2.9. Tolerances

14.2.10. Product Descriptions

14.2.11. Schedule

14.3. Advice

14.3.1. The Plan is derived from the Project Brief, Quality Management Strategy (for quality management activities to be included in the plan), Risk Management Strategy (for risk management activities to be included in the plan), Communication Management Strategy (for communication management activities to be included in the plan), Configuration Management Strategy (for configuration management activities to be included in the plan), Resource availability, and Registers and logs.

14.3.2. The Plan can take a number of formats including: A stand-alone document or a section of the Project Initiation Documentation; Document, spreadsheet, presentation slides or mindmap; Entry in a project management tool.

14.3.3. The schedule may be in the form of a product checklist (which is a list of the products to be delivered within the scope of the plan, together with key status dates such as draft ready, quality inspected, approved etc.) or the output from a project planning tool.

14.3.4. The following quality criteria should be observed:

14.3.4.1. The plan is achievable

14.3.4.2. Estimates are based on consultation with the resources, who will undertake the work, and/or historical data

14.3.4.3. Team Managers agree that their part of the plan is achievable

14.3.4.4. It is planned to an appropriate level of detail (not too much, not too little)

14.3.4.5. The plan conforms to required corporate or programme standards

14.3.4.6. The plan incorporates lessons from previous projects

14.3.4.7. The plan incorporates any legal requirements

14.3.4.8. The Plan covers management and control activities (such as quality) as well as the activities to create the products in scope

14.3.4.9. The plan supports the Quality Management Strategy, Configuration Management Strategy, Risk Management Strategy, Communication Management Strategy and project approach

14.3.4.10. The plan supports the management controls defined in the Project Initiation Documentation