VZN Anchor Chamber Blower Door Testing
by Kevin Brennan
1. 4 Separate Chambers
1.1. Brooklyn Side 2x
1.2. Staten Island Side 2x
2. Initial test of each chamber
2.1. 4 tests
3. In Progress Testing
3.1. up to 8 test
4. Final Compliance Testing
4.1. 4 tests
5. Gather Equipment
6. Equipment Needed
6.1. 5x Fans
6.2. 5x DM 32
6.3. 2x Double Frames and Shroudes
6.4. 4 Pannels
6.5. Masking Bear-acad
6.6. Plywood 6 sheets
6.7. 2x4 10 ft
6.8. Air Current Testers
6.9. Hot Wire Anenometer
6.10. Computer
6.10.1. CAT5 cable, Hub,
6.10.2. FanTestic Software