Build a flexible work breakdown structure

See your entire project on one canvas, and move any piece of it without starting over. Start with a free work breakdown structure template, or map it out from scratch.

vector image
vector image
Rated 4.6/5
vector image
Made in the EU
GDPR compliant
image

Used by 2.7M teams

vector imagevector imagevector imagevector imagevector image

Manage the big picture and the details

Collapse branches to see the project at a glance, then expand them when you need to go deeper. Every level of your WBS is just one click away.

work breakdown structure for a website launch in MindMeister
work breakdown structure example for an office move

Reshape your map when the scope changes

Drag and drop tasks between work packages or phases. Unlike with spreadsheets, your work breakdown structure map will adjust automatically.

Draft your WBS with AI

Describe your project in a few sentences, or upload your full brief and let Meister AI draft the WBS for you. Then edit it freely to refine the details.

A mind map generated from a prompt showing ideas to improve an onboarding flow
image

Agree the scope together, in real time

Share a link and your whole team can edit the map and comment on it at the same time. The people doing the work are the ones who spot what's missing.

"We develop topics collaboratively in MindMeister. This is how we build solutions from ideas."

imageSK
Sebastian KraftHead of Bank Administration, VR-Bank Würzburg
vector image

Make a WBS chart in minutes

What is a work breakdown structure?

A work breakdown structure (WBS) breaks a project into every piece of work needed to finish it, arranged as a hierarchy. The project sits at the top, and each level below splits into smaller parts until you reach individual work packages.

A WBS answers one question: what has to be done? Build it once the scope is agreed and before you plan a timeline, because you can't estimate work you haven't named.

A WBS isn't a to-do list. A flat list can't tell you whether anything is missing. It's what you check when someone asks whether something belongs in the project.

The four levels of a WBS

  1. The project. The finished outcome, stated once. In our example, we'll imagine a company preparing for a trade show.

  2. Major deliverables or phases. The handful of big pieces the project divides into, such as venue, stand, handouts and staffing.

  3. Sub-deliverables. Each big piece broken into its components. Stand becomes the design, the build and the install.

  4. Work packages.  The lowest level, small enough for one owner to estimate and finish. "Order the build" is one: single owner, single estimate, clear end.

Levels are usually numbered (1, 1.1, 1.1.1) so every work package has a unique reference. Many projects need three or more levels. Go deeper only where the work is genuinely unclear.

Work breakdown structure template: by deliverable

A trade show might split into venue, stand, handouts and staffing, and each of those into its own work packages. Use this shape when the project is defined by what it produces.

deliverable based work breakdown structure example template
phased based work breakdown structure example for a trade show

Work breakdown structure example: by phase

This WBS example uses the same trade show, organized by stage: plan, prepare, run and follow up. Work packages sit under the phase they happen in.

How to plan a project with a work breakdown structure

These five project planning steps take you from a blank map to work packages you can assign.

  • Name the end result first. Write the finished outcome as your top level. Everything else hangs off it.

  • Split it into major deliverables. Aim for a handful, not a list of twenty. If you have more than about eight, some belong a level down.

  • Break each one down. Keep going while a piece is still too big for one person to own.

  • Stop at work packages. The 8/80 rule is a useful test: if a package takes less than a day or more than two weeks, it's the wrong size.

  • Check the 100% rule. The branches added together should equal the project, no more and no less.

Explore other ways to use MindMeister

image

Run better meetings

Share a visual structure that's easy for everyone to follow.

image

Visualize structure

Map out your company's organizational chart.

image

Think bigger

Visualize your company strategy on an infinite canvas.

security icon

Enterprise-grade security

As your trusted digitalization partner, we're committed to providing a secure and reliable platform so you can manage your daily work with confidence.

  • ISO 27001 certified

  • Fully GDPR compliant

  • Hosted in Germany

  • Admin controls

  • Security best practices

Learn more

Connect your tools for a smooth workflow

vector image
vector image
vector image

Sync your WBS with Google Drive, assign tasks in MeisterTask and brainstorm directly in Microsoft Teams.

Explore integrations

Create a work breakdown structure with MindMeister

Work breakdown structure FAQs